Debris flow runoff process is one of key parameters for the design of emergency measures and control engineering. The Shenxi gully in Dujiangyan region,located in the meizoseismal areas of Wenchuan earthquake,was sele...Debris flow runoff process is one of key parameters for the design of emergency measures and control engineering. The Shenxi gully in Dujiangyan region,located in the meizoseismal areas of Wenchuan earthquake,was selected as the study area. Based on the research of hazard inducing environment,a soil conservation service( SCS) hydrological model was used to simulate the process of water flow,and then the debris flow runoff process was calculated using the empirical formula combining the results from the SCS hydrological model. Taking the debris flow event occurred on July 9th,2013 as an example,the peak discharges of water flow and debris flow were calculated as 162. 12 and 689. 22 m3/s,with error of 6. 03% compared to the measured values. The debris flow confluence process lasted 1. 8h, which was similar with the actual result. The proposed methodology can be applied to predict the debris flow runoff process in quake-hit areas of the Wenchuan earthquake and is of great importance for debris flow mitigation.展开更多
基金Water Resources Science and Technology Innovation Project of Guangdong Province,China(No.2016-15)National Natural Science Foundation of China(No.41372331)Science and Technology Planning Projects of Guangdong Province,China(Nos.2014A020219006,2014A020219006)
文摘Debris flow runoff process is one of key parameters for the design of emergency measures and control engineering. The Shenxi gully in Dujiangyan region,located in the meizoseismal areas of Wenchuan earthquake,was selected as the study area. Based on the research of hazard inducing environment,a soil conservation service( SCS) hydrological model was used to simulate the process of water flow,and then the debris flow runoff process was calculated using the empirical formula combining the results from the SCS hydrological model. Taking the debris flow event occurred on July 9th,2013 as an example,the peak discharges of water flow and debris flow were calculated as 162. 12 and 689. 22 m3/s,with error of 6. 03% compared to the measured values. The debris flow confluence process lasted 1. 8h, which was similar with the actual result. The proposed methodology can be applied to predict the debris flow runoff process in quake-hit areas of the Wenchuan earthquake and is of great importance for debris flow mitigation.