期刊文献+
共找到4,746篇文章
< 1 2 238 >
每页显示 20 50 100
Analysis on the Problems in Start-up and Debugging of Two 600 MW Generating Units in Yangzhou No.2 Thermal Power Plant
1
作者 蒯狄正 《Electricity》 2001年第2期11-15,共5页
The problems including excessive flow of attemperating water for boiler, failure of butterfly valve at the outlet of circulating water pump, burnt-out of thyristor for excitation regulator, load variation rate of CCS ... The problems including excessive flow of attemperating water for boiler, failure of butterfly valve at the outlet of circulating water pump, burnt-out of thyristor for excitation regulator, load variation rate of CCS not complying with the contract target, etc. occurred during start-up and debugging of two 600 MW generating units in Yangzhou No.2 Thermal Power Plant. Through analysis on these problems. the remedial measures were put forward, to which can be referred for similar units. 展开更多
关键词 start-up and debugging problems analysis remedial measures 600 MW generating unit
下载PDF
Exergy Analysis and Thermal Optimization of a Double-Turbine Regeneration System in a Ultra-Supercritical Double-Reheat Unit 被引量:2
2
作者 Shidan Chi Tao Luan +2 位作者 Yan Liang Xundong Hu Yan Gao 《Fluid Dynamics & Materials Processing》 EI 2021年第1期71-80,共10页
Improving the primary steam parameters is one of the most direct ways to improve the cycle efficiency of a powergeneration system. In the present study, the typical problem connected to the excessively high superheat ... Improving the primary steam parameters is one of the most direct ways to improve the cycle efficiency of a powergeneration system. In the present study, the typical problem connected to the excessively high superheat degree ofextraction steam in an ultra-supercritical (USC) double-reheat unit is considered. Using a 1000 MW power plantas an example, two systems (case 1 and case 2) are proposed, both working in combination with a regenerativesteam turbine. The thermal performances of these two systems are compared with that of the original systemthrough a heat balance method and an exergy balance strategy. The results reveal that the two coupled systemscan significantly reduce the superheat degree of extraction steam, turbine heat rate, and coal consumption of theunit and improve the energy utilization efficiency. These results will provide useful theoretical guidance to futureinvestigators wishing to address the general problem relating to energy conservation and modelling of the coupledextraction steam regenerative system of USC double-reheat units. 展开更多
关键词 ultra-supercritical unit exergy loss thermal performance regenerative steam turbine superheat degree
下载PDF
Construction Schedule of Generating Units Actually Realized in 1996 (as of Aug. 8,1996) 被引量:2
3
《Electricity》 1996年第4期53-53,共1页
关键词 as of Aug Construction Schedule of generating units Actually Realized in 1996
下载PDF
An Analysis of the Designed Performance and Structural Characteristics of the Turbine Generating Units of TGP 被引量:1
4
作者 Huang Yuanfang (China Yangtze Three Gorges Project Development Corporation, Yichang, Hubei\ 443002) 《工程科学(英文版)》 2003年第1期47-52,共6页
The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction ... The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction and successful execution of the contract of turbine generating units,the technical difficulties concerning the performance and structure of turbine generating units have been further recognized.In this paper some issues are discussed and analyzed in connection with a deep going cognition of turbine generating units for TGP during the period of design, manufacture and installation. 展开更多
关键词 Three Gorges Project TURBINE generating units TECHNICAL problems DISCUSSION and ANALYSIS
下载PDF
The design and practice of giant hydro turbine generating units of Three Gorges Project
5
作者 Shao Jianxiong Liu Jingwang Yuan Dafu 《Engineering Sciences》 EI 2011年第3期88-95,共8页
The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters... The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters of hydro-turbine generating units are optimized through the study on key technical problems.The unit operation indicates that the performance of the hydro-turbine generating units is excellent,and the units can operate in a safe,stable and highly efficient mode for a long term.Therefore,it is verified effectively that the general technical design of units is scientific and rational. 展开更多
关键词 Three Gorges Project (TGP) 700 MW hydro-turbine generating unit unit capacity design and research operation stability practice
下载PDF
Vibration of 1000-MW Ultra-Supercritical Turbine-Generator Unit with Simens Technology
6
作者 Zhang Xueyan Zhang Weijun Ge Xiang He Guoan 《Electricity》 2012年第5期48-54,58,共8页
The layout features of unit shafting and their effects on vibration, as well as evaluation criteria, were introduced for a 1000-MW ultra-supercritical turbine-generator unit with Simens technology. Based on vibration ... The layout features of unit shafting and their effects on vibration, as well as evaluation criteria, were introduced for a 1000-MW ultra-supercritical turbine-generator unit with Simens technology. Based on vibration diagnosis and treatment for more than 10 units, some typical vibration faults were summarized, such as the vibration fluctuation of the high pressure (HP) rotor, abnormal vibration increases of the No.3 bearing pedestal and large vibration of the exciter rotor during its critical speed range. The vibration characteristics and the causes of faults and countermeasures were analyzed. Three applications for further illustration were given. The vibration fault identification method, control measures, and applications can provide a reference for vibration diagnoses and treatment of same type units. 展开更多
关键词 1 000-MW ultra-supercritical unit VIBRATION single bearing support rotor (thermal) unbalance rotor dynamic (thermal) balance
下载PDF
Analysis on Operation Reliability of Generating Units in 2009
7
作者 Zhou Hong Power Reliability Management Center Li Shixue 《Electricity》 2010年第3期26-31,共6页
This paper presents the data on operation reliability indices and relevant analyses toward China's conventional power generating units in 2009.The units brought into the statistical analysis include 100-MW or abov... This paper presents the data on operation reliability indices and relevant analyses toward China's conventional power generating units in 2009.The units brought into the statistical analysis include 100-MW or above thermal generating units,40-MW or above hydro generating units,and all nuclear generating units.The reliability indices embodied include utilization hours,times and hours of scheduled outages,times and hours of unscheduled outages,equivalent forced outage rate and equivalent availability factor. 展开更多
关键词 power plant generating unit operation reliability statistical data
下载PDF
Construction Schedule of Generating Units to be Commissioned in 1998 (as of Dec 11, 1998)
8
《Electricity》 1999年第2期50-50,共1页
关键词 as of Dec 11 Construction Schedule of generating units to be Commissioned in 1998
下载PDF
8 large coal-fired generating units planned to be commissioned in Shandong Power Grid in 1997
9
《Electricity》 1997年第2期51-52,共2页
关键词 GRID large coal-fired generating units planned to be commissioned in Shandong Power Grid in 1997
下载PDF
Speed up the Retrofit of Thermal Power Generating Units, Raise the Effectiveness of Power Plant Comprehensively
10
作者 Jiang Zhesheng 《Electricity》 2000年第1期13-16,共4页
关键词 Speed up the Retrofit of Thermal Power generating units Raise the Effectiveness of Power Plant Comprehensively
下载PDF
Multi-model Predictive Control of Ultra-supercritical Coal-fired Power Unit 被引量:6
11
作者 王国良 阎威武 +2 位作者 陈世和 张曦 邵惠鹤 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2014年第7期782-787,共6页
The control of ultra-supercritical(USC) power unit is a difficult issue for its characteristic of the nonlinearity, large dead time and coupling of the unit. In this paper, model predictive control(MPC) based on multi... The control of ultra-supercritical(USC) power unit is a difficult issue for its characteristic of the nonlinearity, large dead time and coupling of the unit. In this paper, model predictive control(MPC) based on multi-model and double layered optimization is introduced for coordinated control of USC unit. The linear programming(LP) combined with quadratic programming(QP) is used in steady optimization for computation of the ideal value of dynamic optimization. Three inputs(i.e. valve opening, coal flow and feedwater flow) are employed to control three outputs(i.e. load, main steam temperature and main steam pressure). The step response models for the dynamic matrix control(DMC) are constructed using the three inputs and the three outputs. Piecewise models are built at selected operation points. Double-layered multi-model predictive controller is implemented in simulation with satisfactory performance. 展开更多
关键词 ultra-supercritical power unit Coordinated control Multi-model constrained predictive control
下载PDF
Study on Generation Cost Prediction Based on Coal Quality and Generating Unit Performance 被引量:6
12
作者 ZHONG Wei LIU Chenggang ZHOU Yonggang WU Yanling ZHOU Yi LI Pei 《中国电机工程学报》 EI CSCD 北大核心 2013年第11期I0004-I0004,6,共1页
燃料变化条件下发电成本的预测是火电厂普遍关心的重要课题。分析了影响机组性能及发电电量成本的各种煤质指标,重点研究了基于结构参数及燃烧传热机理的锅炉稳态热力性能分析计算方法,讨论了制粉系统、风机、脱硫和脱硝装置性能随燃... 燃料变化条件下发电成本的预测是火电厂普遍关心的重要课题。分析了影响机组性能及发电电量成本的各种煤质指标,重点研究了基于结构参数及燃烧传热机理的锅炉稳态热力性能分析计算方法,讨论了制粉系统、风机、脱硫和脱硝装置性能随燃料等运行条件的变化关系,最终提出了基于煤质和机组性能分析计算的发电电量成本预测模型并研发了“煤炭选配与机组发电成本预测系统”。该系统在我国某600MW火电厂的实际应用经验表明:提出的电量成本分析预测模型合理,研发的软件系统有助于辅助火电厂的选煤和购煤决策,优化动力配煤方案,从而提高火电厂的运行经济性。 展开更多
关键词 成本预测 发电成本 机组性能 市场化改革 煤质 火电厂 电力 燃料
下载PDF
Using Hybrid Penalty and Gated Linear Units to Improve Wasserstein Generative Adversarial Networks for Single-Channel Speech Enhancement
13
作者 Xiaojun Zhu Heming Huang 《Computer Modeling in Engineering & Sciences》 SCIE EI 2023年第6期2155-2172,共18页
Recently,speech enhancement methods based on Generative Adversarial Networks have achieved good performance in time-domain noisy signals.However,the training of Generative Adversarial Networks has such problems as con... Recently,speech enhancement methods based on Generative Adversarial Networks have achieved good performance in time-domain noisy signals.However,the training of Generative Adversarial Networks has such problems as convergence difficulty,model collapse,etc.In this work,an end-to-end speech enhancement model based on Wasserstein Generative Adversarial Networks is proposed,and some improvements have been made in order to get faster convergence speed and better generated speech quality.Specifically,in the generator coding part,each convolution layer adopts different convolution kernel sizes to conduct convolution operations for obtaining speech coding information from multiple scales;a gated linear unit is introduced to alleviate the vanishing gradient problem with the increase of network depth;the gradient penalty of the discriminator is replaced with spectral normalization to accelerate the convergence rate of themodel;a hybrid penalty termcomposed of L1 regularization and a scale-invariant signal-to-distortion ratio is introduced into the loss function of the generator to improve the quality of generated speech.The experimental results on both TIMIT corpus and Tibetan corpus show that the proposed model improves the speech quality significantly and accelerates the convergence speed of the model. 展开更多
关键词 Speech enhancement generative adversarial networks hybrid penalty gated linear units multi-scale convolution
下载PDF
Improved Units of Measure in Rotational Mechanics
14
作者 Richard James Petti 《World Journal of Mechanics》 2024年第1期1-7,共7页
The SI system of units in rotational mechanics yields correct numerical results, but it produces physically incorrect units of measure in many cases. SI units also violate the principle of general covariance—the gene... The SI system of units in rotational mechanics yields correct numerical results, but it produces physically incorrect units of measure in many cases. SI units also violate the principle of general covariance—the general rule for defining continuous coordinates and units in mathematics and mathematical physics. After 30+ years of wrestling with these problems, the ultimate authority on units of measure has declared that Newton–meter and Joule are not equivalent in rotational mechanics, as they are in the rest of physics. This article proposes a simple modification to SI units called “Nonstandard International units” (“NI units”) until a better name is agreed upon. NI units yield correct numerical results and physically correct units of measure, and they satisfy the principle of general covariance. The main obstacle to the adoption of NI units is the consensus among users that the radius of rotation should have the unit meter because the radius can be measured with a ruler. NI units assigned to radius should have units meter/radian because the radius is a conversion factor between angular size and circumferential length, as in arclength = rθ. To manage the social consensus behind SI units, the author recommends retaining SI units as they are, and informing users who want correct units that NI units solve the technical problems of SI units. 展开更多
关键词 Rotational Mechanics Angular unit TORQUE Moment of Inertia Angular Momentum general Covariance
下载PDF
ZIZ-2 Vibration monitoring and diagnosing system for turbine generator units
15
《Electricity》 1996年第1期53-53,共1页
ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and ... ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and fault retrieval; (4) Data aquisition, analysis and storage during daily operation; (5) Recall of historic data; (6) Output of routine reports and tables; (7) Analysis of vibration behaviour: Bode plot, polar plot, spectrum, cascade, waveform, shaft orbit, trend, etc; 展开更多
关键词 LINE ZIZ-2 Vibration monitoring and diagnosing system for turbine generator units
下载PDF
An Analysis of Zhabei Cas Turbine Project and the Development of Cas Turbine Generating Unit
16
《Electricity》 1997年第4期21-23,共3页
关键词 PROJECT An Analysis of Zhabei Cas Turbine Project and the Development of Cas Turbine generating unit
下载PDF
Optimal Load Dispatch of Gas Turbine Power Generation Units based on Multiple Population Genetic Algorithm
17
作者 Hua Xiao Cheng Yang +1 位作者 Jie Wu Xiaoqian Ma 《Engineering(科研)》 2013年第1期197-201,共5页
In this paper, a multiple population genetic algorithm (MPGA) is proposed to solve the problem of optimal load dispatch of gas turbine generation units. By introducing multiple populations on the basis of Standard Gen... In this paper, a multiple population genetic algorithm (MPGA) is proposed to solve the problem of optimal load dispatch of gas turbine generation units. By introducing multiple populations on the basis of Standard Genetic Algorithm (SGA), connecting each population through immigrant operator and preserving the best individuals of every generation through elite strategy, MPGA can enhance the efficiency in obtaining the global optimal solution. In this paper, MPGA is applied to optimize the load dispatch of 3×390MW gas turbine units. The results of MPGA calculation are compared with that of equal micro incremental method and AGC instruction. MPGA shows the best performance of optimization under different load conditions. The amount of saved gas consumption in the calculation is up to 2337.45m3N/h, which indicates that the load dispatch optimization of gas turbine units via MPGA approach can be effective. 展开更多
关键词 Gas TURBINE generation units LOAD DISPATCH MPGA Optimization
下载PDF
The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
18
《Electricity》 2000年第3期45-45,共1页
关键词 The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
下载PDF
Optimizing Combination of Units Commitment Based on Improved Genetic Algorithms
19
作者 LAI Yifei ZHANG Qianhua JIA Junping 《Wuhan University Journal of Natural Sciences》 CAS 2007年第6期1003-1007,共5页
GAs are general purpose optimization techniques based on principles inspired from the biological evolution using metaphors of mechanisms, such as natural selection, genetic recombination and survival of the fittest. B... GAs are general purpose optimization techniques based on principles inspired from the biological evolution using metaphors of mechanisms, such as natural selection, genetic recombination and survival of the fittest. By use of coding betterment, the dynamic changes of the mutation rate and the crossover probability, the dynamic choice of subsistence, the reservation of the optimal fitness value, a modified genetic algorithm for optimizing combination of units in thermal power plants is proposed. And through taking examples, test result are analyzed and compared with results of some different algorithms. Numerical results show available value for the unit commitment problem with examples. 展开更多
关键词 generating units unit commitment genetic algorithms
下载PDF
Economical operation of Baosteel's oxygen generating system
20
作者 ZHU Huizhong GAO Yuan GU Yunjie MA Yi 《Baosteel Technical Research》 CAS 2009年第3期27-31,共5页
Baosteel's 60000 m^3/h air separation unit (ASU) is the largest oxygen generating system in China. The operational cost of such a giant system is very high. How to reduce the operational cost is a critical issue. T... Baosteel's 60000 m^3/h air separation unit (ASU) is the largest oxygen generating system in China. The operational cost of such a giant system is very high. How to reduce the operational cost is a critical issue. This paper discusses the system's characteristics,the current operational status and the difficulties in reducing the cost,and analyzes relevant indicators, such as the technical and economical indicators of individual units and systems as well as the indicators concerning the costs. The relationship between the cost and each economical indicator and measures to optimize an economical operation of the oxygen generating system are also discussed in this paper. 展开更多
关键词 large-scale air separation unit oxygen generating system oxygen dispersion rate
下载PDF
上一页 1 2 238 下一页 到第
使用帮助 返回顶部