The Peking University neutron imaging facility (PKUNIFTY), an RFQ-based neutron source, aims at developing industrial applications. During the past 3 y operation, some problems have appeared, such as RF sparking for t...The Peking University neutron imaging facility (PKUNIFTY), an RFQ-based neutron source, aims at developing industrial applications. During the past 3 y operation, some problems have appeared, such as RF sparking for the RFQ high power operation, full power level instability of RF transmitter, and the misalignment of RFQ electrodes assembling and deformation. The PKUNIFTY upgrade endeavors to adopt a modest inter-voltage beam dynamics design. The new beam dynamics design of 201.5MHz RFQ of PKUNIFTY, which accelerates 35mA of D+ from 50 keV to 2.0MeV at 10% duty factor, is performed. The averaged D+ beam will be about 3 mA. The source will deliver a fast neutron yield of 2.5x10(12) n/s via the deuteron-beryllium reaction, which is about 10 times higher than the current status.展开更多
This paper focuses on the route and roadbed pavement design in highway reconstruction and upgrading projects.It discusses the importance of project design for highway reconstruction and upgrading,highlighting key aspe...This paper focuses on the route and roadbed pavement design in highway reconstruction and upgrading projects.It discusses the importance of project design for highway reconstruction and upgrading,highlighting key aspects of route design and roadbed pavement design.The analysis reveals that the main design considerations in these projects include controlling factors of route reconstruction,expansion,and upgrading,as well as route plan design and longitudinal section design combined with roadbed pavement.In roadbed pavement design,it is crucial for designers to thoroughly collect existing data and make reasonable use of the current roadbed and pavement to develop a comprehensive design scheme.This analysis aims to provide a reference for the reasonable design of such projects.展开更多
基金Supported by the National Basic Research Program of China under Grant No 2014CB845503
文摘The Peking University neutron imaging facility (PKUNIFTY), an RFQ-based neutron source, aims at developing industrial applications. During the past 3 y operation, some problems have appeared, such as RF sparking for the RFQ high power operation, full power level instability of RF transmitter, and the misalignment of RFQ electrodes assembling and deformation. The PKUNIFTY upgrade endeavors to adopt a modest inter-voltage beam dynamics design. The new beam dynamics design of 201.5MHz RFQ of PKUNIFTY, which accelerates 35mA of D+ from 50 keV to 2.0MeV at 10% duty factor, is performed. The averaged D+ beam will be about 3 mA. The source will deliver a fast neutron yield of 2.5x10(12) n/s via the deuteron-beryllium reaction, which is about 10 times higher than the current status.
文摘This paper focuses on the route and roadbed pavement design in highway reconstruction and upgrading projects.It discusses the importance of project design for highway reconstruction and upgrading,highlighting key aspects of route design and roadbed pavement design.The analysis reveals that the main design considerations in these projects include controlling factors of route reconstruction,expansion,and upgrading,as well as route plan design and longitudinal section design combined with roadbed pavement.In roadbed pavement design,it is crucial for designers to thoroughly collect existing data and make reasonable use of the current roadbed and pavement to develop a comprehensive design scheme.This analysis aims to provide a reference for the reasonable design of such projects.