Rail transit plays a key role in mitigating transportation system carbon emissions.Accurate measurement of urban rail transit carbon emission can help quantify the contribution of urban rail transit towards urban tran...Rail transit plays a key role in mitigating transportation system carbon emissions.Accurate measurement of urban rail transit carbon emission can help quantify the contribution of urban rail transit towards urban transportation carbon emission reduction.Since the whole life cycle of urban rail transit carbon emission measurement involves a wide range of aspects,a systematic framework model is required for analysis.This research reviews the existing studies on carbon emission of urban rail transit.First,the characteristics of urban rail transit carbon emission were determined and the complexity of carbon emission measurement was analyzed.Then,the urban rail transit carbon emission measurement models were compared and analyzed in terms of the selection of research boundaries,the types of greenhouse gas(GHG)emissions calculation,and the accuracy of the measurement.Following that,an intelligent station was introduced to analyze the practical application of digital collaboration technology and energy-saving and carbon-reducing system platforms for rail transit.Finally,the urgent problems and future research directions at this stage were discussed.This research presents the necessity of establishing a dynamic carbon emission factor library and the important development trend of system integration of carbon emission measurement and digital system technology.展开更多
To realize a better automatic train driving operation control strategy for urban rail trains,an automatic train driving method with improved DQN algorithm(classical deep reinforcement learning algorithm)is proposed as...To realize a better automatic train driving operation control strategy for urban rail trains,an automatic train driving method with improved DQN algorithm(classical deep reinforcement learning algorithm)is proposed as a research object.Firstly,the train control model is established by considering the train operation requirements.Secondly,the dueling network and DDQN ideas are introduced to prevent the value function overestimation problem.Finally,the priority experience playback and“restricted speed arrival time”are used to reduce the useless experience utilization.The experiments are carried out to verify the train operation strategy method by simulating the actual line conditions.From the experimental results,the train operation meets the ATO requirements,the energy consumption is 15.75%more energy-efficient than the actual operation,and the algorithm convergence speed is improved by about 37%.The improved DQN method not only enhances the efficiency of the algorithm but also forms a more effective operation strategy than the actual operation,thereby contributing meaningfully to the advancement of automatic train operation intelligence.展开更多
Urban rail transit loops are essential in urban rail transit systems and transportation networks.However,precise requirements and reference standards for rail transit loop design have yet to be established.There are c...Urban rail transit loops are essential in urban rail transit systems and transportation networks.However,precise requirements and reference standards for rail transit loop design have yet to be established.There are certain areas for improvement in planning,construction,and operation.In the planning and design of urban rail transit loops,the scale of the city and the relationship between line operations should be considered to ensure that the line conforms to the city’s operating traffic conditions and can effectively cater to peak passenger flow requirements.This article presents strategies for planning,constructing,and operating urban rail transit loops,laying the foundation for the healthy operation of urban rail transit.展开更多
In order to make rail transit smart stations serve passengers better,the potential of smart stations should be optimized to reduce time cost,and relieve traffic congestion.In this paper,the construction of smart stati...In order to make rail transit smart stations serve passengers better,the potential of smart stations should be optimized to reduce time cost,and relieve traffic congestion.In this paper,the construction of smart stations based on the management experience of a subway station and the benefits of smart stations were analyzed and discussed.The construction of smart stations,as well as the key technologies for the construction of smart stations,will aid in the automation and intelligent management of subway stations.展开更多
With the rapid development of urban rail transit,the traditional operation and maintenance methods mainly rely on manpower,and the pressure on equipment operation and maintenance is increasing,and the low work efficie...With the rapid development of urban rail transit,the traditional operation and maintenance methods mainly rely on manpower,and the pressure on equipment operation and maintenance is increasing,and the low work efficiency,high intensity and high operating costs have always been the main problems at this stage.Through BIM visualization technology can effectively solve those problems,the operation and maintenance mode of urban rail signal equipment at this stage is discussed,the integration and visualization of BIM technology are used to make the judgments and early warnings on the maintenance of urban rail signal equipment,and play a positive and important role in operation and maintenance work,this research result can provide ideas and references for urban rail transit operation and maintenance in the new era.展开更多
As a development direction of urban rail transit system,the train autonomous circumambulate system(TACS)can operate in a safer,more efficient,and more economical mode.However,most urban rail transit systems transmit s...As a development direction of urban rail transit system,the train autonomous circumambulate system(TACS)can operate in a safer,more efficient,and more economical mode.However,most urban rail transit systems transmit signals through industrial,scientific,and medical(ISM)frequency bands or narrow frequency bands,which cannot meet the requirements of TACS.As a promising solution,the 5th generation(5G)mobile communication provides more services for the future urban rail transit systems,and covers the shortages of exiting communication technologies in terms of capacity and reliability.In this paper,we first briefly review the research status of current train control system and introduce its limitations.Next,we propose a novel network architecture,and present new technologies and requirements of the proposed architecture for TACS.Some potential challenges are then discussed to give insights for further research of TACS.展开更多
The train plan of urban rail transit under multi-routing mode can be divided into three parts: train formation, train operation periods and corresponding train counts of each routing in each period. Based on the anal...The train plan of urban rail transit under multi-routing mode can be divided into three parts: train formation, train operation periods and corresponding train counts of each routing in each period. Based on the analysis of passen- ger's general travel expenses and operator's benefits, the constraints and objective functions are defined and the multiobjective optimization model for the train plan of urban rail transit is presented. Factors considered in the multi- objective optimization model include transport capacity, the requirements of traffic organization, corporation benefits, passenger demands, and passenger choice behavior under multi-train-routing mode. According to the characteristics of this model and practical planning experience, a three-phase solution was designed to gradually optimize the train formarion, train counts as well as operation periods. The instance of Changsha Metro Line 2 validates the feasibility and efficiency of this approach.展开更多
As an important traffic mode, urban rail transit is constantly developing toward improvement in service capacity and quality. When an urban rail transit system is evaluated in terms of its service capacity, the train ...As an important traffic mode, urban rail transit is constantly developing toward improvement in service capacity and quality. When an urban rail transit system is evaluated in terms of its service capacity, the train departure capacity is an important index that can objectively reflect the service level of an urban rail transit facility. In light of the existing cellular automaton models, this paper proposes a suitable cellular automaton model to analyze the train departure capacity of urban rail transit under different variable factors and conditions. The established model can demonstrate the train operating processes by implementing the proposed sound rules, including the rules of train departure at the origin and intermediate stations, and the velocity and position updating rules. The properties of train traffic are analyzed via numerical experiments. The numerical results show that the departure capacity is negatively affected by the train departure control manner. In addition, (i) the real-time signal control can offer a higher train service frequency; (ii) the departure capacity gradually rises with the decrease in the line design speed to a limited extent; (iii) the departure capacity decreases with extension in the train length; (iv) the number of departed trains decreases as the train stop time increases; (v) the departure capacity is not affected by the section length. However, the longer the length, the worse the service quality of the urban rail transit line. The experiments show that the proposed cellular automaton model can be used to analyze the train service capacity of an urban rail transit system by performing quantitative analysis under various considered factors, conditions, and management modes.展开更多
To avoid stray current and maintain the benefit of no phase-split in the DC traction power supply system, an AC traction power supply system was proposed for the urban public transport such as metro and light rail tra...To avoid stray current and maintain the benefit of no phase-split in the DC traction power supply system, an AC traction power supply system was proposed for the urban public transport such as metro and light rail transit. The proposed system consists of a main substation (MSS) and cable traction network (CTN). The MSS includes a single-phase main traction transformer and a negative-se- quence compensation device, while the CTN includes double-core cables, traction transformers, overhead catenary system, rails, etc. Several key techniques for the proposed system were put forward and discussed, which can be summarized as (1) the power supply principle, equivalent circuit and transmission ability of the CTN, the cable-catenary matching technique, and the selection of catenary voltage level; (2) the segmentation technology and status identification method for traction power supply network, distributed and centralized protection schemes, etc.; (3) a power supply scheme for single-line MSS and a power supply scheme of MSS shared by two or more lines. The proposed industrial frequency single-phase AC traction power supply system shows an excellent technical performance, good economy, and high reliability, hence provides a new alternative for metro and urban rail transit power supply systems.展开更多
On the basis of current development of urban rail transit complex in China,this paper proposed that it is necessary to build a complete landscape design system of urban traffic complex.Combined with the concept of sus...On the basis of current development of urban rail transit complex in China,this paper proposed that it is necessary to build a complete landscape design system of urban traffic complex.Combined with the concept of sustainable urban landscape design,this paper explored landscape design of urban rail transit complex from the macroscopic,mesocopic and microscopic perspective,and analyzed many design cases to provide references for the sustainable landscape design of urban rail transit complex in China.展开更多
With the rapid development of urban rail transit,passenger traffic is increasing,and obstacle violations are more frequent,and the safety of train operation under high-density traffic conditions is becoming more and m...With the rapid development of urban rail transit,passenger traffic is increasing,and obstacle violations are more frequent,and the safety of train operation under high-density traffic conditions is becoming more and more thought provoking.In order to monitor the train operating environment in real time,this paper first adopts multisensing technology based on machine vision and lidar,which is used to collect video images and ranging data of the track area in real time,and then it performs image preprocessing and division of regions of interest on the collected video.Then,the obstacles in the region of interest are detected to obtain the geometric characteristics and position information of the obstacles.Finally,according to the danger degree of obstacles,determine the degree of impact on the train operation,and use the signal system automatic response ormanual response mode to transmit the detection results to the corresponding train,so as to control the train operation.Through simulation analysis and experimental verification,the detection accuracy and control performance of the detection method are confirmed,which provides safety guarantee for the train operation.展开更多
This paper is engaged in the research of urban rail transit hub integration and transfer.Firstly,this paper focuses on the space division,the aggregation form of hub subsystems,the spatial layout of hub subsystems,and...This paper is engaged in the research of urban rail transit hub integration and transfer.Firstly,this paper focuses on the space division,the aggregation form of hub subsystems,the spatial layout of hub subsystems,and the design of integrated functions to achieve an integrated layout.In addition,this study also conducted a selection of transfer classification and transfer station layout of urban rail transit hubs,with the aims to promote the improvement of the functions of urban rail transit hubs,the rationality of transfers,and to improve the service quality of the hub system which meet the demand of the public travel.展开更多
Urban rail transit has the advantages of large traffic capacity,high punctuality and zero congestion,and it plays an increasingly important role in modern urban life.Braking system is an important system of urban rail...Urban rail transit has the advantages of large traffic capacity,high punctuality and zero congestion,and it plays an increasingly important role in modern urban life.Braking system is an important system of urban rail train,which directly affects the performance and safety of train operation and impacts passenger comfort.The braking performance of urban rail trains is directly related to the improvement of train speed and transportation capacity.Also,urban rail transit has the characteristics of high speed,short station distance,frequent starting,and frequent braking.This makes the braking control system constitute a time-varying,time-delaying and nonlinear control system,especially the braking force changes directly disturb the parking accuracy and comfort.To solve these issues,a predictive control algorithm based on T-S fuzzy model was proposed and applied to the train braking control system.Compared with the traditional PID control algorithm and self-adaptive fuzzy PID control algorithm,the braking capacity of urban rail train was improved by 8%.The algorithm can achieve fast and accurate synchronous braking,thereby overcoming the dynamic influence of the uncertainty,hysteresis and time-varying factors of the controlled object.Finally,the desired control objectives can be achieved,the system will have superior robustness,stability and comfort.展开更多
The energy consumption of train operation occupies a large proportion of the total consumption of railway transportation.In order to improve the oper-ating energy utilization rate of trains,a multi-objective particle ...The energy consumption of train operation occupies a large proportion of the total consumption of railway transportation.In order to improve the oper-ating energy utilization rate of trains,a multi-objective particle swarm optimiza-tion(MPSO)algorithm with energy consumption,punctuality and parking accuracy as the objective and safety as the constraint is built.To accelerate its the convergence process,the train operation progression is divided into several modes according to the train speed-distance curve.A human-computer interactive particle swarm optimization algorithm is proposed,which presents the optimized results after a certain number of iterations to the decision maker,and the satisfac-tory outcomes can be obtained after a limited number of adjustments.The multi-objective particle swarm optimization(MPSO)algorithm is used to optimize the train operation process.An algorithm based on the important relationship between the objective and the preference information of the given reference points is sug-gested to overcome the shortcomings of the existing algorithms.These methods significantly increase the computational complexity and convergence of the algo-rithm.An adaptive fuzzy logic system that can simultaneously utilize experience information andfield data information is proposed to adjust the consequences of off-line optimization in real time,thereby eliminating the influence of uncertainty on train operation.After optimization and adjustment,the whole running time has been increased by 0.5 s,the energy consumption has been reduced by 12%,the parking accuracy has been increased by 8%,and the comprehensive performance has been enhanced.展开更多
The high peak hour demand in Urban Rail Transport (URT) is usually met by supply side measures such as pushing more number of trains/cars in peak hour by the operator. This additional capacity generates more demand du...The high peak hour demand in Urban Rail Transport (URT) is usually met by supply side measures such as pushing more number of trains/cars in peak hour by the operator. This additional capacity generates more demand due to a positive elasticity of demand with respect to services. Delhi Metro Rail Corporation (DMRC), India has converted its fleet from 4 cars per train to 6 cars per train and finally to 8 cars per train on its Broad Gauge section. The ridership of the system has also witnessed double digit growth during this conversion period. The demand elasticity w.r.t services for the passengers of DMRC has been estimated as 0.512 on the basis of growth of demand and increase in capacity after adjusting for natural growth. So a 10% increase in supply results into 5% increase in capacity. A simple service elasticity model has been developed to estimate demand with increase in supply. The model has been applied to Line 2 (yellow line), the busiest line of DMRC, to estimate the demand for different level of services (trains/hour). The efficacy of supply side measures is limited by the design capacity of the system beyond which any increase in supply would require disproportionate investment. An optimum combination of supply and demand side measures would perhaps be the best way to address peak hour congestion in Urban Rail Transport.展开更多
A multi-objective improved genetic algorithm is constructed to solve the train operation simulation model of urban rail train and find the optimal operation curve.In the train control system,the conversion point of op...A multi-objective improved genetic algorithm is constructed to solve the train operation simulation model of urban rail train and find the optimal operation curve.In the train control system,the conversion point of operating mode is the basic of gene encoding and the chromosome composed of multiple genes represents a control scheme,and the initial population can be formed by the way.The fitness function can be designed by the design requirements of the train control stop error,time error and energy consumption.the effectiveness of new individual can be ensured by checking the validity of the original individual when its in the process of selection,crossover and mutation,and the optimal algorithm will be joined all the operators to make the new group not eliminate on the best individual of the last generation.The simulation result shows that the proposed genetic algorithm comparing with the optimized multi-particle simulation model can reduce more than 10%energy consumption,it can provide a large amount of sub-optimal solution and has obvious optimization effect.展开更多
Purpose–Under the constraints of given passenger service level and coupling travel demand with train departure time,this study optimizes the train operational plan in an urban rail corridor to minimize the numbers of...Purpose–Under the constraints of given passenger service level and coupling travel demand with train departure time,this study optimizes the train operational plan in an urban rail corridor to minimize the numbers of train trips and rolling stocks considering the time-varying demand of urban rail passenger flow.Design/methodology/approach–The authors optimize the train operational plan in a special network layout,i.e.an urban rail corridor with dead-end terminal yard,by decomposing it into two sub-problems:train timetable optimization and rolling stock circulation optimization.As for train timetable optimization,the authors propose a schedule-based passenger flow assignment method,construct the corresponding timetabling optimization model and design the bi-directional coordinated sequential optimization algorithm.For the optimization of rolling stock circulation,the authors construct the corresponding optimization assignment model and adopt the Hungary algorithm for solving the model.Findings–The case study shows that the train operational plan developed by the study’s approach meets requirements on the passenger service quality and reduces the operational cost to the maximum by minimizing the numbers of train trips and rolling stocks.Originality/value–The example verifies the efficiency of the model and algorithm.展开更多
Current urban rail transit has become a major mode of transportation, and passenger is an important factor of urban rail transport, so this article is based on passenger and the degree of the road network structure, c...Current urban rail transit has become a major mode of transportation, and passenger is an important factor of urban rail transport, so this article is based on passenger and the degree of the road network structure, calculating the point intensity of stations of urban rail transit, and then reaching a station importance by integrating many point intensities in a survey cycle time, and getting the station importance of urban rail transit network through concrete examples.展开更多
The monitoring and warning of urban rail transit is the core of operation management, and the breadth and depth of the monitoring range directly affect the quality of urban rail transit operation. For the current dome...The monitoring and warning of urban rail transit is the core of operation management, and the breadth and depth of the monitoring range directly affect the quality of urban rail transit operation. For the current domestic monitoring system, most of the critical equipments and technologies are introduced from abroad;it is diseconomy, and also causes hidden danger. Realizing the localization of monitoring and early warning system is imperative. Based on the analysis of the present situation of urban rail transit operation safety at home and abroad, the paper proposes to use integrated technology to design basic framework of monitoring and warning system of urban rail train, and puts forward the critical technologies to realize the system. Compared with the existing monitoring system, the integrated monitoring system has the characteristics of wide monitoring range, clear division of labor, centralized management, coordination and integration operation and intelligent management, and embodies the concept of people-oriented. It has scientific significance for future construction of domestic Integrated Monitoring and Early Warning System (IMEWS) of urban rail transit.展开更多
This paper studies the short-term prediction methods of sectional passenger flow, and selects BP neural network combined with the characteristics of sectional passenger flow itself. With a case study, we design three ...This paper studies the short-term prediction methods of sectional passenger flow, and selects BP neural network combined with the characteristics of sectional passenger flow itself. With a case study, we design three different schemes. We use Matlab to realize the prediction of the sectional passenger flow of the Beijing subway Line 2 and make comparative analysis. The empirical research shows that combining data characteristics of sectional passenger flow with the BP neural network have good prediction accuracy.展开更多
基金supported by Beijing Natural Science Foundation(J210001)Natural Science Foundation of Hebei Province(E2021210142)Tianjin Natural Science Foundation(21JCZXJC00160).
文摘Rail transit plays a key role in mitigating transportation system carbon emissions.Accurate measurement of urban rail transit carbon emission can help quantify the contribution of urban rail transit towards urban transportation carbon emission reduction.Since the whole life cycle of urban rail transit carbon emission measurement involves a wide range of aspects,a systematic framework model is required for analysis.This research reviews the existing studies on carbon emission of urban rail transit.First,the characteristics of urban rail transit carbon emission were determined and the complexity of carbon emission measurement was analyzed.Then,the urban rail transit carbon emission measurement models were compared and analyzed in terms of the selection of research boundaries,the types of greenhouse gas(GHG)emissions calculation,and the accuracy of the measurement.Following that,an intelligent station was introduced to analyze the practical application of digital collaboration technology and energy-saving and carbon-reducing system platforms for rail transit.Finally,the urgent problems and future research directions at this stage were discussed.This research presents the necessity of establishing a dynamic carbon emission factor library and the important development trend of system integration of carbon emission measurement and digital system technology.
文摘To realize a better automatic train driving operation control strategy for urban rail trains,an automatic train driving method with improved DQN algorithm(classical deep reinforcement learning algorithm)is proposed as a research object.Firstly,the train control model is established by considering the train operation requirements.Secondly,the dueling network and DDQN ideas are introduced to prevent the value function overestimation problem.Finally,the priority experience playback and“restricted speed arrival time”are used to reduce the useless experience utilization.The experiments are carried out to verify the train operation strategy method by simulating the actual line conditions.From the experimental results,the train operation meets the ATO requirements,the energy consumption is 15.75%more energy-efficient than the actual operation,and the algorithm convergence speed is improved by about 37%.The improved DQN method not only enhances the efficiency of the algorithm but also forms a more effective operation strategy than the actual operation,thereby contributing meaningfully to the advancement of automatic train operation intelligence.
文摘Urban rail transit loops are essential in urban rail transit systems and transportation networks.However,precise requirements and reference standards for rail transit loop design have yet to be established.There are certain areas for improvement in planning,construction,and operation.In the planning and design of urban rail transit loops,the scale of the city and the relationship between line operations should be considered to ensure that the line conforms to the city’s operating traffic conditions and can effectively cater to peak passenger flow requirements.This article presents strategies for planning,constructing,and operating urban rail transit loops,laying the foundation for the healthy operation of urban rail transit.
文摘In order to make rail transit smart stations serve passengers better,the potential of smart stations should be optimized to reduce time cost,and relieve traffic congestion.In this paper,the construction of smart stations based on the management experience of a subway station and the benefits of smart stations were analyzed and discussed.The construction of smart stations,as well as the key technologies for the construction of smart stations,will aid in the automation and intelligent management of subway stations.
文摘With the rapid development of urban rail transit,the traditional operation and maintenance methods mainly rely on manpower,and the pressure on equipment operation and maintenance is increasing,and the low work efficiency,high intensity and high operating costs have always been the main problems at this stage.Through BIM visualization technology can effectively solve those problems,the operation and maintenance mode of urban rail signal equipment at this stage is discussed,the integration and visualization of BIM technology are used to make the judgments and early warnings on the maintenance of urban rail signal equipment,and play a positive and important role in operation and maintenance work,this research result can provide ideas and references for urban rail transit operation and maintenance in the new era.
基金This work was supported in part by the National Natural Science Foundation of China(U2001213,61971191 and 61661021)in part by the Beijing Natural Science Foundation under Grant L182018 and L201011,in part by National Key Research and Development Project(2020YFB1807204)+1 种基金in part by the open project of Shanghai Institute of Microsystem and Information Technology(20190910)in part by the Key project of Natural Science Foundation of Jiangxi Province(20202ACBL202006).
文摘As a development direction of urban rail transit system,the train autonomous circumambulate system(TACS)can operate in a safer,more efficient,and more economical mode.However,most urban rail transit systems transmit signals through industrial,scientific,and medical(ISM)frequency bands or narrow frequency bands,which cannot meet the requirements of TACS.As a promising solution,the 5th generation(5G)mobile communication provides more services for the future urban rail transit systems,and covers the shortages of exiting communication technologies in terms of capacity and reliability.In this paper,we first briefly review the research status of current train control system and introduce its limitations.Next,we propose a novel network architecture,and present new technologies and requirements of the proposed architecture for TACS.Some potential challenges are then discussed to give insights for further research of TACS.
基金supported by the National Natural Science Foundation of China (No. 70901076)Research Fund for the Doctoral Program of Higher Education of China (No. 20090162120021)Natural Science Foundation of Hunan Province (No. 10JJ4046)
文摘The train plan of urban rail transit under multi-routing mode can be divided into three parts: train formation, train operation periods and corresponding train counts of each routing in each period. Based on the analysis of passen- ger's general travel expenses and operator's benefits, the constraints and objective functions are defined and the multiobjective optimization model for the train plan of urban rail transit is presented. Factors considered in the multi- objective optimization model include transport capacity, the requirements of traffic organization, corporation benefits, passenger demands, and passenger choice behavior under multi-train-routing mode. According to the characteristics of this model and practical planning experience, a three-phase solution was designed to gradually optimize the train formarion, train counts as well as operation periods. The instance of Changsha Metro Line 2 validates the feasibility and efficiency of this approach.
基金Project supported by the National Natural Science Foundation of China(Grant No.U1434207)
文摘As an important traffic mode, urban rail transit is constantly developing toward improvement in service capacity and quality. When an urban rail transit system is evaluated in terms of its service capacity, the train departure capacity is an important index that can objectively reflect the service level of an urban rail transit facility. In light of the existing cellular automaton models, this paper proposes a suitable cellular automaton model to analyze the train departure capacity of urban rail transit under different variable factors and conditions. The established model can demonstrate the train operating processes by implementing the proposed sound rules, including the rules of train departure at the origin and intermediate stations, and the velocity and position updating rules. The properties of train traffic are analyzed via numerical experiments. The numerical results show that the departure capacity is negatively affected by the train departure control manner. In addition, (i) the real-time signal control can offer a higher train service frequency; (ii) the departure capacity gradually rises with the decrease in the line design speed to a limited extent; (iii) the departure capacity decreases with extension in the train length; (iv) the number of departed trains decreases as the train stop time increases; (v) the departure capacity is not affected by the section length. However, the longer the length, the worse the service quality of the urban rail transit line. The experiments show that the proposed cellular automaton model can be used to analyze the train service capacity of an urban rail transit system by performing quantitative analysis under various considered factors, conditions, and management modes.
文摘To avoid stray current and maintain the benefit of no phase-split in the DC traction power supply system, an AC traction power supply system was proposed for the urban public transport such as metro and light rail transit. The proposed system consists of a main substation (MSS) and cable traction network (CTN). The MSS includes a single-phase main traction transformer and a negative-se- quence compensation device, while the CTN includes double-core cables, traction transformers, overhead catenary system, rails, etc. Several key techniques for the proposed system were put forward and discussed, which can be summarized as (1) the power supply principle, equivalent circuit and transmission ability of the CTN, the cable-catenary matching technique, and the selection of catenary voltage level; (2) the segmentation technology and status identification method for traction power supply network, distributed and centralized protection schemes, etc.; (3) a power supply scheme for single-line MSS and a power supply scheme of MSS shared by two or more lines. The proposed industrial frequency single-phase AC traction power supply system shows an excellent technical performance, good economy, and high reliability, hence provides a new alternative for metro and urban rail transit power supply systems.
文摘On the basis of current development of urban rail transit complex in China,this paper proposed that it is necessary to build a complete landscape design system of urban traffic complex.Combined with the concept of sustainable urban landscape design,this paper explored landscape design of urban rail transit complex from the macroscopic,mesocopic and microscopic perspective,and analyzed many design cases to provide references for the sustainable landscape design of urban rail transit complex in China.
基金supported by The National Natural Science Foundation of China(52072214)the Independent Research Fund for the Central Universities(XJ2020004701)。
文摘With the rapid development of urban rail transit,passenger traffic is increasing,and obstacle violations are more frequent,and the safety of train operation under high-density traffic conditions is becoming more and more thought provoking.In order to monitor the train operating environment in real time,this paper first adopts multisensing technology based on machine vision and lidar,which is used to collect video images and ranging data of the track area in real time,and then it performs image preprocessing and division of regions of interest on the collected video.Then,the obstacles in the region of interest are detected to obtain the geometric characteristics and position information of the obstacles.Finally,according to the danger degree of obstacles,determine the degree of impact on the train operation,and use the signal system automatic response ormanual response mode to transmit the detection results to the corresponding train,so as to control the train operation.Through simulation analysis and experimental verification,the detection accuracy and control performance of the detection method are confirmed,which provides safety guarantee for the train operation.
文摘This paper is engaged in the research of urban rail transit hub integration and transfer.Firstly,this paper focuses on the space division,the aggregation form of hub subsystems,the spatial layout of hub subsystems,and the design of integrated functions to achieve an integrated layout.In addition,this study also conducted a selection of transfer classification and transfer station layout of urban rail transit hubs,with the aims to promote the improvement of the functions of urban rail transit hubs,the rationality of transfers,and to improve the service quality of the hub system which meet the demand of the public travel.
基金This work was supported by the Youth Backbone Teachers Training Program of Henan colleges and universities under Grant No.2016ggjs-287(W.X.K.,http://jyt.henan.gov.cn/)the Project of Science and Technology of Henan province under Grant Nos.172102210124 and 202102210269(W.X.K.,http://www.hnkjt.gov.cn/)the Key Scientific Research Projects in Colleges and Universities in Henan Grant No.18B460003(W.X.K.,http://jyt.henan.gov.cn/)
文摘Urban rail transit has the advantages of large traffic capacity,high punctuality and zero congestion,and it plays an increasingly important role in modern urban life.Braking system is an important system of urban rail train,which directly affects the performance and safety of train operation and impacts passenger comfort.The braking performance of urban rail trains is directly related to the improvement of train speed and transportation capacity.Also,urban rail transit has the characteristics of high speed,short station distance,frequent starting,and frequent braking.This makes the braking control system constitute a time-varying,time-delaying and nonlinear control system,especially the braking force changes directly disturb the parking accuracy and comfort.To solve these issues,a predictive control algorithm based on T-S fuzzy model was proposed and applied to the train braking control system.Compared with the traditional PID control algorithm and self-adaptive fuzzy PID control algorithm,the braking capacity of urban rail train was improved by 8%.The algorithm can achieve fast and accurate synchronous braking,thereby overcoming the dynamic influence of the uncertainty,hysteresis and time-varying factors of the controlled object.Finally,the desired control objectives can be achieved,the system will have superior robustness,stability and comfort.
基金supported by the project of science and technology of Henan province under Grant No.202102210134.
文摘The energy consumption of train operation occupies a large proportion of the total consumption of railway transportation.In order to improve the oper-ating energy utilization rate of trains,a multi-objective particle swarm optimiza-tion(MPSO)algorithm with energy consumption,punctuality and parking accuracy as the objective and safety as the constraint is built.To accelerate its the convergence process,the train operation progression is divided into several modes according to the train speed-distance curve.A human-computer interactive particle swarm optimization algorithm is proposed,which presents the optimized results after a certain number of iterations to the decision maker,and the satisfac-tory outcomes can be obtained after a limited number of adjustments.The multi-objective particle swarm optimization(MPSO)algorithm is used to optimize the train operation process.An algorithm based on the important relationship between the objective and the preference information of the given reference points is sug-gested to overcome the shortcomings of the existing algorithms.These methods significantly increase the computational complexity and convergence of the algo-rithm.An adaptive fuzzy logic system that can simultaneously utilize experience information andfield data information is proposed to adjust the consequences of off-line optimization in real time,thereby eliminating the influence of uncertainty on train operation.After optimization and adjustment,the whole running time has been increased by 0.5 s,the energy consumption has been reduced by 12%,the parking accuracy has been increased by 8%,and the comprehensive performance has been enhanced.
文摘The high peak hour demand in Urban Rail Transport (URT) is usually met by supply side measures such as pushing more number of trains/cars in peak hour by the operator. This additional capacity generates more demand due to a positive elasticity of demand with respect to services. Delhi Metro Rail Corporation (DMRC), India has converted its fleet from 4 cars per train to 6 cars per train and finally to 8 cars per train on its Broad Gauge section. The ridership of the system has also witnessed double digit growth during this conversion period. The demand elasticity w.r.t services for the passengers of DMRC has been estimated as 0.512 on the basis of growth of demand and increase in capacity after adjusting for natural growth. So a 10% increase in supply results into 5% increase in capacity. A simple service elasticity model has been developed to estimate demand with increase in supply. The model has been applied to Line 2 (yellow line), the busiest line of DMRC, to estimate the demand for different level of services (trains/hour). The efficacy of supply side measures is limited by the design capacity of the system beyond which any increase in supply would require disproportionate investment. An optimum combination of supply and demand side measures would perhaps be the best way to address peak hour congestion in Urban Rail Transport.
基金This work was supported by the Youth Backbone Teachers Training Program of Henan Colleges and Universities under Grant No.2016ggjs-287the Project of Science and Technology of Henan Province under Grant Nos.172102210124 and 202102210269.
文摘A multi-objective improved genetic algorithm is constructed to solve the train operation simulation model of urban rail train and find the optimal operation curve.In the train control system,the conversion point of operating mode is the basic of gene encoding and the chromosome composed of multiple genes represents a control scheme,and the initial population can be formed by the way.The fitness function can be designed by the design requirements of the train control stop error,time error and energy consumption.the effectiveness of new individual can be ensured by checking the validity of the original individual when its in the process of selection,crossover and mutation,and the optimal algorithm will be joined all the operators to make the new group not eliminate on the best individual of the last generation.The simulation result shows that the proposed genetic algorithm comparing with the optimized multi-particle simulation model can reduce more than 10%energy consumption,it can provide a large amount of sub-optimal solution and has obvious optimization effect.
基金funded by the National Natural Science Foundation of China(71701216,71171200).
文摘Purpose–Under the constraints of given passenger service level and coupling travel demand with train departure time,this study optimizes the train operational plan in an urban rail corridor to minimize the numbers of train trips and rolling stocks considering the time-varying demand of urban rail passenger flow.Design/methodology/approach–The authors optimize the train operational plan in a special network layout,i.e.an urban rail corridor with dead-end terminal yard,by decomposing it into two sub-problems:train timetable optimization and rolling stock circulation optimization.As for train timetable optimization,the authors propose a schedule-based passenger flow assignment method,construct the corresponding timetabling optimization model and design the bi-directional coordinated sequential optimization algorithm.For the optimization of rolling stock circulation,the authors construct the corresponding optimization assignment model and adopt the Hungary algorithm for solving the model.Findings–The case study shows that the train operational plan developed by the study’s approach meets requirements on the passenger service quality and reduces the operational cost to the maximum by minimizing the numbers of train trips and rolling stocks.Originality/value–The example verifies the efficiency of the model and algorithm.
文摘Current urban rail transit has become a major mode of transportation, and passenger is an important factor of urban rail transport, so this article is based on passenger and the degree of the road network structure, calculating the point intensity of stations of urban rail transit, and then reaching a station importance by integrating many point intensities in a survey cycle time, and getting the station importance of urban rail transit network through concrete examples.
文摘The monitoring and warning of urban rail transit is the core of operation management, and the breadth and depth of the monitoring range directly affect the quality of urban rail transit operation. For the current domestic monitoring system, most of the critical equipments and technologies are introduced from abroad;it is diseconomy, and also causes hidden danger. Realizing the localization of monitoring and early warning system is imperative. Based on the analysis of the present situation of urban rail transit operation safety at home and abroad, the paper proposes to use integrated technology to design basic framework of monitoring and warning system of urban rail train, and puts forward the critical technologies to realize the system. Compared with the existing monitoring system, the integrated monitoring system has the characteristics of wide monitoring range, clear division of labor, centralized management, coordination and integration operation and intelligent management, and embodies the concept of people-oriented. It has scientific significance for future construction of domestic Integrated Monitoring and Early Warning System (IMEWS) of urban rail transit.
文摘This paper studies the short-term prediction methods of sectional passenger flow, and selects BP neural network combined with the characteristics of sectional passenger flow itself. With a case study, we design three different schemes. We use Matlab to realize the prediction of the sectional passenger flow of the Beijing subway Line 2 and make comparative analysis. The empirical research shows that combining data characteristics of sectional passenger flow with the BP neural network have good prediction accuracy.