期刊文献+
共找到27篇文章
< 1 2 >
每页显示 20 50 100
Money and Marriage——The matrimonial value orientation in Pride and Prejudic 被引量:1
1
作者 于欣 《科教文汇》 2006年第6X期132-133,共2页
Pride and prejudice is a very popular novel written by Jane Austen and it is read widely all over the world. It was written in 1813. That specific history time decided that people at that time took money much more ser... Pride and prejudice is a very popular novel written by Jane Austen and it is read widely all over the world. It was written in 1813. That specific history time decided that people at that time took money much more seriously, even on their marriage. In this paper, the marriage cases of most characters in the book were taken as typical to analyze how money influenced their matrimonial value orientation. 展开更多
关键词 PRIDE and PREJUDICE money matrimonial value ORIENT
下载PDF
TIBETAN PAPER MONEY WITH THE LARGEST FACE VALUE
2
《China's Tibet》 2001年第6期36-36,共1页
关键词 TIBETAN PAPER money WITH THE LARGEST FACE value
下载PDF
Plato’s Dialectic and Marx’s Value-Form Analysis
3
作者 Thomas Noutsopoulos 《学术界》 CSSCI 北大核心 2019年第5期185-190,共6页
The comparison of Plato's description of the dialectic in his Republic with Marx's analysis of the value form in The Capital reveals certain common features striking to the reader.How is this possible?The pape... The comparison of Plato's description of the dialectic in his Republic with Marx's analysis of the value form in The Capital reveals certain common features striking to the reader.How is this possible?The paper discusses the grounds of possibility of such a comparison focusing on two levels:firstly,a ground of historical comparability and,secondly,a ground of systematic comparability.Based on these two grounds,the argument highlights two of the common features that can be found in both thinkers,namely the dialectic as a process of complete separation of the intellect from sense perception and as a process that supersedes the form of hypothesis of scientific thinking. 展开更多
关键词 real/ideal ABSTRACTION hoarder money value form understanding/reason
下载PDF
物有所值视角下工程招投标评定分离定标办法
4
作者 祁神军 陈晶晶 +1 位作者 汪丫 詹朝曦 《华侨大学学报(自然科学版)》 CAS 2024年第1期22-28,共7页
直接抽签定标法、票决定标法及票决低价定标法等定标办法均没有综合考虑定标候选人报价和综合得分,择优竞价性相对较差.基于物有所值(VFM)理论创新性地提出了票决指数法。对我国评定分离办法试点情况进行梳理,基于VFM理论构建票决指数... 直接抽签定标法、票决定标法及票决低价定标法等定标办法均没有综合考虑定标候选人报价和综合得分,择优竞价性相对较差.基于物有所值(VFM)理论创新性地提出了票决指数法。对我国评定分离办法试点情况进行梳理,基于VFM理论构建票决指数法的初步模型和最合适区域模型,对比分析票决指数法与其他票决办法。结果表明:票决指数法是一种科学有效的评定分离定标办法,可为招标人更科学择优竞价定标提供一定的理论指导。 展开更多
关键词 工程招标 物有所值(vfm) 评定分离 定标办法 票决指数法 择优竞价
下载PDF
海绵城市项目应用PPP模式的VFM评价 被引量:11
5
作者 桑培东 张鹏 《工程管理学报》 2017年第6期61-65,共5页
为解决海绵城市项目因投资大导致融资难的问题,将PPP模式运用到海绵城市项目。论述了PPP模式在海绵城市建设中的可行性和必要性,利用"物有所值"的原则来判断海绵城市项目是否适合运用PPP模式,简要总结了关于VFM评价理论的研... 为解决海绵城市项目因投资大导致融资难的问题,将PPP模式运用到海绵城市项目。论述了PPP模式在海绵城市建设中的可行性和必要性,利用"物有所值"的原则来判断海绵城市项目是否适合运用PPP模式,简要总结了关于VFM评价理论的研究与国内外发展情况,并根据海绵城市项目选择合适的评价方法。建立PPP模式下海绵城市项目的 VFM评价模型,分别计算海绵城市项目的 PSC值与PPP模式下的LCC值,比较两者得出VFM。并以济南大明湖兴隆片区建设为例,计算VFM来验证评价模型在海绵城市项目中应用的可行性。 展开更多
关键词 物有所值(vfm) 海绵城市 PPP模式 评价模型
下载PDF
城市轨道交通PPP项目VFM定性评价分析——以济青铁路为例 被引量:12
6
作者 杜静 吴洪樾 《工程管理学报》 2016年第3期66-71,共6页
物有所值(VFM)评价作为PPP项目的三项基本评价之一,是操作流程中不可缺少的内容,分为定性和定量两部分,我国目前以定性评价为主。城市轨道交通项目是我国重点发展的公共交通基础设施,对城市规划、经济发展和公众生活都有重要影响,一旦... 物有所值(VFM)评价作为PPP项目的三项基本评价之一,是操作流程中不可缺少的内容,分为定性和定量两部分,我国目前以定性评价为主。城市轨道交通项目是我国重点发展的公共交通基础设施,对城市规划、经济发展和公众生活都有重要影响,一旦决策失误将会带来巨大损失,因此在项目决策中强调VFM定性评价是非常必要的。VFM定性评价以一系列指标、权重和评分标准为基础,通过评分结果判断PPP模式是否优于传统采购模式。城市轨道交通PPP项目VFM定性评价体系以财政部物有所值指引为基础构建了12项评价指标,利用专家打分法确定了指标权重,并以济青铁路项目为例,应用评价体系对项目进行分析和讨论,验证了评价体系的可操作性和适用性。 展开更多
关键词 物有所值(vfm) 定性分析 城市轨道交通 济青铁路
下载PDF
基于城市环保基础设施PPP项目的VFM定性评价研究 被引量:13
7
作者 韩立红 徐一元 +1 位作者 宋文浩 张俊杰 《价值工程》 2018年第2期17-20,共4页
近年来我国重视环保问题,采取措施不断完善环保基础设施。PPP模式是新型的融资模式,有利于政府吸引社会资本进行环保基础设施建设。文章以财政部物有所值指引为基础,结合物有所值(VFM)评价体系,以日照市第一生活垃圾焚烧发电厂为例进行... 近年来我国重视环保问题,采取措施不断完善环保基础设施。PPP模式是新型的融资模式,有利于政府吸引社会资本进行环保基础设施建设。文章以财政部物有所值指引为基础,结合物有所值(VFM)评价体系,以日照市第一生活垃圾焚烧发电厂为例进行相关的指标、权重、评分标准的确定,来定性的分析PPP模式比传统模式是否优越,同时经过评价体系对项目分析,对该体系的可行性进行了验证。 展开更多
关键词 PPP 物有所值(vfm) 定性分析 城市环保基础设施
下载PDF
判别PPP模式在廉租房项目建设中的适用性——基于VFM评价方法 被引量:2
8
作者 张锋 王莹 《土木工程与管理学报》 北大核心 2016年第3期111-117,共7页
PPP模式参与廉租房项目建设中能有效解决政府资金短缺,转移风险及提高管理效率。然而对于PPP模式是否适合在廉租房项目建设中使用,国内并没有具体的定量化指导方针。文章比较分析了三种PPP模式在廉租房建设运营中的差异,基于物有所值(V... PPP模式参与廉租房项目建设中能有效解决政府资金短缺,转移风险及提高管理效率。然而对于PPP模式是否适合在廉租房项目建设中使用,国内并没有具体的定量化指导方针。文章比较分析了三种PPP模式在廉租房建设运营中的差异,基于物有所值(VFM)评价方法,以BOT模式为例研究了廉租房建设中的VFM两要素公共部门参照标准(PSC)和全寿命周期成本(LCC)的构成。通过建立廉租房项目建设中的PPP适用判别流程,得到了有效的VFM值,根据VFM值判断廉租房项目建设是否适合采用PPP模式以及采用的具体模式。最后以案例进行说明分析,为政府部门选择采购模式提供了科学依据。 展开更多
关键词 廉租房 公私合营(PPP) 物有所值(vfm) 适用性分析
下载PDF
轨道交通PPP项目VFM定性评价研究——基于物元分析法的尝试 被引量:2
9
作者 姜泳 李爱春 鲍学英 《工程管理学报》 2018年第3期69-74,共6页
物有所值(Value of Money,VFM)是在评定一个项目是否应该采用公私合营(Public Private Partnership,PPP)模式时的一个重要评判标准。为了解决我国轨道交通PPP项目的 VFM定性评价理论还不完全成熟、评价方法不够完善的问题,以相关资料为... 物有所值(Value of Money,VFM)是在评定一个项目是否应该采用公私合营(Public Private Partnership,PPP)模式时的一个重要评判标准。为了解决我国轨道交通PPP项目的 VFM定性评价理论还不完全成熟、评价方法不够完善的问题,以相关资料为基础,尝试将物元分析法应用于VFM定性评价中,结合故障树理论、区间层次分析法、集对分析理论针对轨道交通项目的特殊性构建了轨道交通项目PPP模式VFM定性评价指标体系。结合北京地铁四号线进行实例验证,结果表明该评价方法具有科学合理性,达到完善轨道交通PPP项目VFM定性评价理论的目的,对我国PPP项目VFM定性评价研究具有一定参考价值。 展开更多
关键词 物有所值 物元分析法 区间层次分析法 轨道交通PPP项目 定性评价
下载PDF
城市地下综合管廊PPP项目VFM定量评价研究
10
作者 王建波 杨迪瀛 +2 位作者 有维宝 刘芳梦 张薇 《工程经济》 2019年第2期32-35,共4页
分析物有所值(VFM)国内外研究方法,提出VFM定量评价流程框架。然后建立综合管廊VFM评价模型,分析综合管廊公共部门比较值以及城市地下综合管廊PPP项目影子报价的构成算法。最后结合Y市地下综合管廊PPP项目案例中,验证VFM评价城市地下综... 分析物有所值(VFM)国内外研究方法,提出VFM定量评价流程框架。然后建立综合管廊VFM评价模型,分析综合管廊公共部门比较值以及城市地下综合管廊PPP项目影子报价的构成算法。最后结合Y市地下综合管廊PPP项目案例中,验证VFM评价城市地下综合管廊PPP项目的可行性,以期为同类工程评价提供参考。 展开更多
关键词 地下综合管廊 PPP模式 物有所值 影子报价 公共部门比较值
下载PDF
城市轨道交通PPP模式的VFM评价研究
11
作者 罗辉 李刚 石若川 《价值工程》 2017年第18期65-67,共3页
近年来,财政部就推广运用PPP模式进行了一系列工作部署,经过两年多时间的探索与实践,推广运用PPP模式工作取得一定成效,城市轨道交通PPP项目的采购流程等也得到了进一步的规范。然而,PPP模式在何种情况下适用却一直是我国基础设施项目... 近年来,财政部就推广运用PPP模式进行了一系列工作部署,经过两年多时间的探索与实践,推广运用PPP模式工作取得一定成效,城市轨道交通PPP项目的采购流程等也得到了进一步的规范。然而,PPP模式在何种情况下适用却一直是我国基础设施项目采购过程中相对薄弱的环节。本文在VFM评价相关理论的基础上,结合现有城市轨道交通PPP项目的实际情况和实践经验,设计了相关的评价方法,初步建立了城市轨道交通PPP模式的VFM评价流程和体系,对建立和完善我国城市轨道交通PPP模式物有所值评价机制具有重要的现实意义。 展开更多
关键词 物有所值(vfm) 公共部门比较值(PSC) 全生命周期成本(LCC) 定性评价 定量评价
下载PDF
Uncertainty Analysis of Value for Money Assessment for Public-Private Partnership Projects
12
作者 梁晴雪 胡昊 《Journal of Shanghai Jiaotong university(Science)》 EI 2017年第6期672-681,共10页
In recent years, private sectors are encouraged to take an active part in franchising of urban infrastructure investments and operations, which promotes the rapid development of public-private partnership(PPP)in infra... In recent years, private sectors are encouraged to take an active part in franchising of urban infrastructure investments and operations, which promotes the rapid development of public-private partnership(PPP)in infrastructure and public service supply. Value for money(VFM) assessment has been officially proposed to provide a reference for selection of projects planning to adopt PPP. Based on the bottlenecks of VFM application in China and the uncertainties for urban infrastructure PPP projects, a discounted cash flow(DCF) model is established for VFM of infrastructure PPP projects. Then, a Monte Carlo simulation model is established on the basis of uncertainty factors for VFM. Through the analysis of Huai'an trams PPP project, coping strategies of uncertainties for VFM are put forward. Findings of the research may propel the establishment of a complete VFM evaluation system for PPP projects. Key instructional functions of VFM during the process of decision-making can be brought into full play and PPP may develop orderly. 展开更多
关键词 public-private partnership(PPP) value for money(vfm) UNCERTAINTY Monte Carlo simulation model discounted cash flow(DCF) model
原文传递
公私合作项目物有所值评估比较与分析 被引量:36
13
作者 彭为 陈建国 +1 位作者 Cui Qingbin 穆诗煜 《软科学》 CSSCI 北大核心 2014年第5期28-32,42,共6页
全面解析了公私合作项目物有所值评估(VfM)实践,包括评估流程、执行时间、公共部门比较值、贴现率选择、风险计量等多方面,以澳大利亚、英国、加拿大、美国为案例进行了横向比较研究。首次对物有所值评估所包含的项目回报、社会福利、... 全面解析了公私合作项目物有所值评估(VfM)实践,包括评估流程、执行时间、公共部门比较值、贴现率选择、风险计量等多方面,以澳大利亚、英国、加拿大、美国为案例进行了横向比较研究。首次对物有所值评估所包含的项目回报、社会福利、外部性、风险转移四项假设进行了定量和定性分析。研究结果显示VfM评估在综合评测PPP项目可行性上存在不足。提出了设计我国PPP项目决策体系的启示和发展策略。 展开更多
关键词 公私合作伙伴关系 物有所值 物有所值评估 案例分析
下载PDF
服务购买型BOT项目特许经营期的计算模型 被引量:2
14
作者 胡振 刘华 金维兴 《预测》 CSSCI 北大核心 2010年第6期43-47,共5页
针对服务购买型BOT项目,本文在分析特许经营期影响因素的基础上,修正文献[1]和文献[2]提出的决策准则,以预期VFM效果和民间实体收益为决策目标,构建特许经营期的计算模型,并分析存在建设期缩短和开发时点提前这两个因素的情况下特许经... 针对服务购买型BOT项目,本文在分析特许经营期影响因素的基础上,修正文献[1]和文献[2]提出的决策准则,以预期VFM效果和民间实体收益为决策目标,构建特许经营期的计算模型,并分析存在建设期缩短和开发时点提前这两个因素的情况下特许经营期计算模型的演变。最后,通过算例验证所得模型,证明其具有较强的科学性和有效性。 展开更多
关键词 服务购买型BOT项目 特许经营期 vfm 财政补偿
下载PDF
物有所值视角下的PPP项目绩效评价指标研究 被引量:2
15
作者 李海波 任午煜 张立娟 《河北建筑工程学院学报》 CAS 2020年第1期150-156,共7页
PPP模式及物有所值评价方法在我国基础设施建设领域日益被重视与运用,但物有所值评价方法不仅用于项目识别或采购阶段,还是PPP项目全生命周期绩效评估的重要依据。本文基于物有所值评价视角,以利益相关者的绩效目标为导向,选取财务、控... PPP模式及物有所值评价方法在我国基础设施建设领域日益被重视与运用,但物有所值评价方法不仅用于项目识别或采购阶段,还是PPP项目全生命周期绩效评估的重要依据。本文基于物有所值评价视角,以利益相关者的绩效目标为导向,选取财务、控制管理、利益相关者满意度、创新与成长四个维度,运用熵值法确定各项指标权重,构建PPP项目绩效评价体系。 展开更多
关键词 PPP模式 物有所值 绩效评价 熵值法
下载PDF
PPP项目物有所值评价与国民经济评价比较分析 被引量:1
16
作者 程峰 李娜 《价值工程》 2020年第10期25-27,共3页
PPP项目VFM定量评价目前尚无体系完整的理论、方法和指标,《PPP物有所值评价指引(试行)》仅仅是给出了部分原则性规定。本文主要基于评价目的、评价范围和评价方法等方面初步比较了VFM定量评价和政府投资项目国民经济评价的区别与联系,... PPP项目VFM定量评价目前尚无体系完整的理论、方法和指标,《PPP物有所值评价指引(试行)》仅仅是给出了部分原则性规定。本文主要基于评价目的、评价范围和评价方法等方面初步比较了VFM定量评价和政府投资项目国民经济评价的区别与联系,为今后开展VFM定量评价和进一步深入开展VFM定量评价的理论方法研究提供参考。 展开更多
关键词 PPP vfm PPP值 国民经济评价
下载PDF
物有所值评价法在PPP模式中的应用研究——基于文献综述的视角
17
作者 贾宏俊 张树懿 《建筑经济》 北大核心 2019年第2期46-50,共5页
VFM评价在评价政府与社会资本合作模式的过程中暴露出了大量的问题。针对如何科学合理的应用VFM评价的问题,通过文献综述与分析的方法,归纳出VFM评价在国内应用过程中的4个方面的22个应用障碍。通过应用障碍的分析,有针对性地提出有效提... VFM评价在评价政府与社会资本合作模式的过程中暴露出了大量的问题。针对如何科学合理的应用VFM评价的问题,通过文献综述与分析的方法,归纳出VFM评价在国内应用过程中的4个方面的22个应用障碍。通过应用障碍的分析,有针对性地提出有效提升VFM评价应用水平的对策建议,为VFM评价方法在PPP项目中的推广应用提供借鉴。 展开更多
关键词 PPP模式 文献综述 物有所值(vfm) 应用障碍
下载PDF
国际PPP项目物有所值定性评价及对我国的启示 被引量:28
18
作者 吴洪樾 袁竞峰 杜静 《建筑经济》 2017年第3期38-42,共5页
物有所值(Value for Money,VFM)评价,可为PPP项目前期立项决策提供有力支持。首先分析各国VFM定性评价相关政策,对比英国、美国、加拿大、澳大利亚的VFM定性评价,然后总结我国VFM定性评价现状及问题,最后阐述各国VFM定性评价对我国的启... 物有所值(Value for Money,VFM)评价,可为PPP项目前期立项决策提供有力支持。首先分析各国VFM定性评价相关政策,对比英国、美国、加拿大、澳大利亚的VFM定性评价,然后总结我国VFM定性评价现状及问题,最后阐述各国VFM定性评价对我国的启示,为我国完善VFM定性评价提供参考。 展开更多
关键词 物有所值(vfm) 定性评价 PPP 建设管理
下载PDF
PPP模式下物有所值评价实证研究--以C市产业新城建设BOT项目为例 被引量:2
19
作者 谢瀚鹏 许家伟 《安徽行政学院学报》 2016年第4期47-52,共6页
文章基于C市产业新城建设BOT项目,通过了VFM定性和定量评价,准确计算PSC值和PPPs值,并对PPP项目识别阶段的物有所值评价进行了实证研究。结果表明:有稳定现金流入,回报机制为使用者付费加政府可行性缺口补助的项目,适宜采用动态定价机制... 文章基于C市产业新城建设BOT项目,通过了VFM定性和定量评价,准确计算PSC值和PPPs值,并对PPP项目识别阶段的物有所值评价进行了实证研究。结果表明:有稳定现金流入,回报机制为使用者付费加政府可行性缺口补助的项目,适宜采用动态定价机制的PPP运营模式,并实现社会资本"盈利而不暴利"。同时,提出重新界定BOT模式中"运营"的适用范围,尽快出台物有所值评价的操作细则和发挥中介机构的咨询服务功能等政策建议。 展开更多
关键词 PPP模式 物有所值 BOT项目 vfm评价
下载PDF
考虑级差贡献的航道PPP项目投融资决策方法
20
作者 符雪剑 周红梅 +1 位作者 肖浩 石圣雅 《武汉理工大学学报(交通科学与工程版)》 2021年第3期435-440,447,共7页
文中运用VFM(物有所值)评价法构建航道工程PPP项目评价指标体系,考虑航道等级不同对区域经济贡献和影响的差异性,分三级航道分析了项目决策评价指标体系权重的差异性.运用前景理论确定各评价指标的具体权重值,选取两种最优及最差情形下... 文中运用VFM(物有所值)评价法构建航道工程PPP项目评价指标体系,考虑航道等级不同对区域经济贡献和影响的差异性,分三级航道分析了项目决策评价指标体系权重的差异性.运用前景理论确定各评价指标的具体权重值,选取两种最优及最差情形下的参考点,结合区间直觉模糊集距离公式测度各方案综合评价值偏离度,以此构建方案综合前景值最大化目标函数,求得各评价指标的全局最优权重,运用区间直觉模糊集的集成算子确定各投融资方案综合得分对应的区间直觉模糊数,进而对方案进行排序.案例分析表明,针对各等级航道,该投融资决策方法均具有合理性及有效性. 展开更多
关键词 投融资决策 区间直觉模糊数 物有所值 PPP项目 前景理论
下载PDF
上一页 1 2 下一页 到第
使用帮助 返回顶部