Considering the CRTS-II track slab,which is commonly used in the Chinese high-speed railway system,a vehicle-track-bridge dynamic analysis method is proposed in which the vehicle subsystem equations are established by...Considering the CRTS-II track slab,which is commonly used in the Chinese high-speed railway system,a vehicle-track-bridge dynamic analysis method is proposed in which the vehicle subsystem equations are established by the rigid body dynamics method,the track subsystem and the bridge subsystem equations are established by the FEM,the wheel-rail contact relation is defined by the corresponding assumption in vertical direction and the Kalker linear creep theory in lateral direction.The in-span spring element is derived to model the track-bridge interaction;the equal-band-width storage is adopted to fit the track structure with multilayer uniform section beam;and the dynamic equilibrium equations are solved by the inter-history iteration method.As a case study,the response of a CRH2 high-speed train transverses a simply-supported bridge with successive 31.5m double bound pre-stress beams is simulated.The result shows that using the vehicle-track-bridge interaction model instead of the vehicle-bridge interaction model helps predict the rotation angle at beam ends and choose an economic beam vertical stiffness.展开更多
基金supported by the National Basic Research Program of China("973"Project)(Grant No.2013CB036203)the National Natural Science Foundation of China(Grant No.U1134206)+1 种基金the 111 project(Grant No.B13002)the Doctoral Fund of Ministry of Education of China(Grant No.20130009110036)
文摘Considering the CRTS-II track slab,which is commonly used in the Chinese high-speed railway system,a vehicle-track-bridge dynamic analysis method is proposed in which the vehicle subsystem equations are established by the rigid body dynamics method,the track subsystem and the bridge subsystem equations are established by the FEM,the wheel-rail contact relation is defined by the corresponding assumption in vertical direction and the Kalker linear creep theory in lateral direction.The in-span spring element is derived to model the track-bridge interaction;the equal-band-width storage is adopted to fit the track structure with multilayer uniform section beam;and the dynamic equilibrium equations are solved by the inter-history iteration method.As a case study,the response of a CRH2 high-speed train transverses a simply-supported bridge with successive 31.5m double bound pre-stress beams is simulated.The result shows that using the vehicle-track-bridge interaction model instead of the vehicle-bridge interaction model helps predict the rotation angle at beam ends and choose an economic beam vertical stiffness.