期刊文献+
共找到1,187篇文章
< 1 2 60 >
每页显示 20 50 100
Prediction and safety analysis of additional vertical stress within a shaft wall in an extra-thick alluvium 被引量:7
1
作者 WANG Yansen ZHANG Chi +1 位作者 XUE Libing HUANG Xinggen 《Mining Science and Technology》 EI CAS 2010年第3期350-356,共7页
An alluvium with a sandy aquifer at the bottom,but lacking an effective impermeable layer between the sandy aquifer and bedrock is referred to as a special alluvial stratum.Impacted by the drainage of the aquifer due ... An alluvium with a sandy aquifer at the bottom,but lacking an effective impermeable layer between the sandy aquifer and bedrock is referred to as a special alluvial stratum.Impacted by the drainage of the aquifer due to mining activities,a shaft wall in this special alluvial stratum will be subject to a downward load by an additional vertical force which must be taken into consideration in the design of the shaft wall.The complexity of interaction between shaft wall and the surrounding walls makes it extremely difficult to determine this additional vertical force.For a particular shaft wall in an extra-thick alluvium and assuming that the friction coefficient between shaft wall and stratum does not change with depth,an analysis of a numerical simulation of the stress within the shaft wall has been carried out.Growth and size of the additional vertical stress have been obtained,based on specific values of the friction coefficient,the modulus of elasticity of the drainage layer and the thickness of the drainage layer.Subsequently, the safety of shaft walls with different structural types was studied and a more suitable structural design,providing an important basis for the design of shaft walls,is promoted. 展开更多
关键词 extra-thick alluvium shaft wall additional vertical stress additional vertical force numerical analysis
下载PDF
Study on optimal design of vertical-shaft mechanical mixer based on numerical simulation of flow field
2
作者 张海龙 伍悦滨 崔福义 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2010年第3期414-418,共5页
In the paper the three-dimensional flow fields are numerically simulated in the vertical-shaft mechanical mix tank of a water treatment plant by means of FLUENT software based on the method of Computational Fluid Dyna... In the paper the three-dimensional flow fields are numerically simulated in the vertical-shaft mechanical mix tank of a water treatment plant by means of FLUENT software based on the method of Computational Fluid Dynamics (CFD). The influences of design parameters on flow fields and the mixing effect are analyzed. Firstly,the prediction capability of the turbulence model adopted in simulations is evaluated. And then,the mesh independence is checked up. Finally,the flow fields in various dimensionless blade diameters and dimensionless shaft spans are numerically simulated respectively. The results have shown that the numerical simulation method based on CFD is a feasible assistance for the optimal designs of mixers. Moreover,the optimal design of the blade diameter should take into account both the flow field and the power consumption. The optimization of the shaft span is to achieve a relatively even distribution of the flow field without any rupture. With the consideration of an optimal design,the dimensionless blade diameter and dimensionless shaft span should be 0.45 and 0.57 respectively in the case. 展开更多
关键词 vertical-shaft mechanical mixer flow field numerical simulation optimal design
下载PDF
Theoretical Investigation on Vertical Additional Force on Shaft Lining in Special Stratum 被引量:3
3
作者 杨维好 付厚利 《International Journal of Mining Science and Technology》 SCIE EI 1999年第2期129-135,共7页
The model of skaft lining under force is developed on the basis of the special stratum condition led to sbart cracking- The model is broken into 3 sub-questions to solve separately. According to the principle of super... The model of skaft lining under force is developed on the basis of the special stratum condition led to sbart cracking- The model is broken into 3 sub-questions to solve separately. According to the principle of superposition and strain compatibility, a second kind Fredholm integral equation is generated.A theoretical solution to vertical additional force on shaft lining is obtained by numerical method to the integral equation. 展开更多
关键词 shaft LINING vertical additional force SPECIAL STRATA
下载PDF
700m深级公路隧道超大竖井掘进工法比选——以天山胜利隧道2-2竖井为例 被引量:1
4
作者 朱荣辉 裴宏宇 +4 位作者 于方正 黄登侠 李健 王知远 赵永祥 《隧道建设(中英文)》 CSCD 北大核心 2024年第S01期355-367,共13页
为解决700 m深级高寒高海拔地区高速公路大直径竖井施工前施工工法难以抉择的问题,考虑到新疆严苛的环保要求,天山复杂的工程地质,钻爆法与TBM法“3洞”组合洞内通风的迫切需求,以及施工条件、工期、成本控制等诸多因素,调研国内外不同... 为解决700 m深级高寒高海拔地区高速公路大直径竖井施工前施工工法难以抉择的问题,考虑到新疆严苛的环保要求,天山复杂的工程地质,钻爆法与TBM法“3洞”组合洞内通风的迫切需求,以及施工条件、工期、成本控制等诸多因素,调研国内外不同行业、不同级别井深的井筒正井法、反井法、竖井钻井法及竖向掘进机法等掘进工法,从地质适应性、工期要求、场地条件、技术成熟度、安全性、环保、成本等方面进行综合比选,结合天山胜利隧道2-2竖井工程的经验,得出主要结论如下:1)正井法、反井法、钻井法在煤矿等其他行业技术成熟,设备市场齐全,而在高速公路隧道700 m深级超大竖井施工尚属首次,施工难度极大,应引起项目决策者高度重视;2)高速公路隧道700 m深级超大竖井施工前,再次进行渗透系数、涌水量、围岩岩性、强度、破碎带位置及长度等的详勘或校核,是进行方案比选的重要前提;3)采用钻井法对应充分考虑坚硬地层导致的成本增加和工期延长等不利后果;4)超大竖井掘进机掘进设备、技术尚处在探索阶段,会因设备制造周期长以及泥浆泵更换、垂直度纠偏、刀盘漏油修复、频繁换刀等问题带来的工期不确定性和成本大幅增加,采用竖向掘进机法应慎之又慎。 展开更多
关键词 公路隧道 井筒 正井法 反井法 钻井法 竖向掘进机法
下载PDF
Application of vertically integrated sampling approach to study of new production via ^(234)Th -^(238)U disequilibria 被引量:1
5
作者 Chen Feizhou1 Huang Yipu2 Chen Min2 (1. College of Fishery Science, Shanghai Fisheries University, Shanghai 200090, China 2. Department of Oceanography, Xiamen University, Xiamen 361005, China) 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2000年第2期37-44,共8页
The spatial and temporal distributions of new production vary largely in different sea areas. To understand the level of new production in the sea area studied better, an estimate of new production must be obtained in... The spatial and temporal distributions of new production vary largely in different sea areas. To understand the level of new production in the sea area studied better, an estimate of new production must be obtained in large spatial and temporal scales. The ~234Th/ ~238U disequilibrium is an effective method for the study of new production. Two sampling strategies, vertically integrated sampling ap proach based on trapezoidal integration principle and discrete layer sampling approach, were compared in the studies of the xiamen Bay and the northern South China Sea. The scavenging fluxes and removal fluxes of ~234Th and the residence times for dissolved and particulate ~234Th were calculated. The coinci dent results from two Sampling approach suggest that vertically integrated sampling approach is not only effective and reliable, but also significantly reduces the number and volume of samples. It allows us to study new production by ba ^(234)Th - ^(238)U disequilibria in large spatial scale. 展开更多
关键词 New production vertically integrated Sampling approach ^(234)Th - ^(238)U disequilibria Xia men Bay northern South China Sea
下载PDF
THE MINED NONLIEAR STUDY OF MEASURING METHOD AND CALCULATION ABOUT STRESS AND STRAIN IN THE VERTICAL SHAFT AND SURROUNDING ROCK
6
作者 于广明 苏仲杰 +1 位作者 杨伦 邵军 《Journal of Coal Science & Engineering(China)》 1998年第2期17-22,共6页
The damage of the overburden is a complex nonliear mechanical problem. To immediately master the stress state of the vertical shaft in process of the damage of overburden, and protect the shaft, in this paper, a serie... The damage of the overburden is a complex nonliear mechanical problem. To immediately master the stress state of the vertical shaft in process of the damage of overburden, and protect the shaft, in this paper, a series of new type of rock mass stress and strain compatible sensors are used. The vertical shaft wall mechanical parameter and surrounding mechanical parameter are calculated by the result of the measurement. A set of the calculation method of the vertical shaft and surrounding rock parameter are defined. 展开更多
关键词 compatible sensor vertical shaft surrounding rock calculation method
下载PDF
THE MEASUREMENT AND STUDY OF BLASTING VIBRATION AFFECTING IN SITU CAST CONCRETE LINING OF VERTICAL SHAFT
7
作者 黄琦 李玉民 《Journal of Coal Science & Engineering(China)》 1997年第2期62-67,共6页
Vertical shaft is main form of drivage in deep mineral depoist. They also serve as the entrance into and the exit from the underground mine. The main problems in shaft and tunnel engineering is to solve the contradict... Vertical shaft is main form of drivage in deep mineral depoist. They also serve as the entrance into and the exit from the underground mine. The main problems in shaft and tunnel engineering is to solve the contradiction between drivage and lining. The measurement of blasting vibration affecting concrete lining strength of vertical shaft is carried out in experiment and theory in this paper. 展开更多
关键词 vertical shaft concrete strength simulation experiment of vibration
下载PDF
黄土-古土壤地层深竖井受力变形特征研究
8
作者 罗章波 亢佳伟 +1 位作者 李仑 邓国华 《铁道工程学报》 EI CSCD 北大核心 2024年第3期1-6,16,共7页
研究目的:为准确认识黄土-古土壤地层条件下的深竖井受力变形特征,以53.5 m深圆形竖井工程为依托,开展竖井侧向土压力、变形、结构内力及周边地层的竖直和水平向变形的系统监测。研究结论:(1)黄土-古土壤地层深竖井开挖过程中,井壁结构... 研究目的:为准确认识黄土-古土壤地层条件下的深竖井受力变形特征,以53.5 m深圆形竖井工程为依托,开展竖井侧向土压力、变形、结构内力及周边地层的竖直和水平向变形的系统监测。研究结论:(1)黄土-古土壤地层深竖井开挖过程中,井壁结构整体变形较小,水平变形“先挤出后收敛”,竖向变形“先下沉后隆起”,竖井开挖至设计深度后,15~30 d进入结构受力变形稳定阶段;(2)竖井井壁收敛变形、侧向土压力和结构内力在深度方向上存在拐点,出现在0.5~0.7倍竖井设计深度处,其受力变形指标和土层性质存在良好的对应关系,在古土壤范围内,井壁变形量和土压力明显减小,约为邻近深度处黄土层的40%~50%,古土壤的存在,限制了竖井变形和土压力的发展;(3)黄土-古土壤地层深竖井井壁结构侧向土压力与静止土压力和主动土压力有显著差异,在0~12 m深度范围内,侧向土压力接近静止土压力;12~28 m范围内,侧向土压力接近主动土压力;28~48 m范围内,侧向土压力均小于主动土压力,为其35%~65%;(4)本研究成果可为相近地层条件下深竖井的土压力计算和支护结构设计提供参考依据。 展开更多
关键词 深竖井 黄土-古土壤结构剖面 现场原位监测 受力变形特征
下载PDF
基于DEMATEL-ISM-MICMAC的斜(竖)井施工事故致因研究 被引量:1
9
作者 康小龙 李兆宇 +2 位作者 刘如萍 张胜平 侯晓斌 《安全》 2024年第4期57-63,共7页
为深入分析抽水蓄能电站斜(竖)井事故致因因素的属性特征,提高抽水蓄能电站斜(竖)井施工的安全性和可靠性,运用扎根理论对98起斜(竖)井事故进行编码,提取出91个致因因素;采用决策实验室分析法(DEMATEL)定量分析各个致因因素之间的相互关... 为深入分析抽水蓄能电站斜(竖)井事故致因因素的属性特征,提高抽水蓄能电站斜(竖)井施工的安全性和可靠性,运用扎根理论对98起斜(竖)井事故进行编码,提取出91个致因因素;采用决策实验室分析法(DEMATEL)定量分析各个致因因素之间的相互关系;运用解释结构模型(ISM)对风险因素开展层级特征分析,并构建多层递阶结构模型;通过交叉影响矩阵相乘(MICMAC)的方法,进一步分析风险因素的属性特征。结果表明:A14安全风险辨识不到位等11个因素的中心度值相对较高,需重视,且土体滑落需进一步加强管控;致因因素可划分为自治、依赖、关联和独立4类要素,7个层级,并明确各层级致因因素的属性特征,其中,管理原因属于关联因素,是斜(竖)井施工事故发生的高发因素。研究结果可为预防斜(竖)井事故的发生提供理论参考。 展开更多
关键词 斜(竖)井 事故致因 扎根理论 决策实验室分析法(DEMATEL) 解释结构模型(ISM) 交叉影响矩阵相乘法(MICMAC)
下载PDF
XY-8DB立轴钻机绳索绞车排绳机构改进与应用
10
作者 杨宽才 曾石友 +5 位作者 杨雨濛 孔二伟 张锋 薛善忠 高杉 张雅秋 《地质装备》 2023年第3期5-8,共4页
随着国家深部找矿战略的实施,国内矿产勘查工作正向寻找隐伏矿、深部矿的方向转变。XY-8DB型电传动立轴钻机具备电液比例控制钻进参数,长行程送钻以及打捞和泥浆循环的DTC直接转矩控制等特点,使其相比传统立轴钻机在2000~3000 m的钻探... 随着国家深部找矿战略的实施,国内矿产勘查工作正向寻找隐伏矿、深部矿的方向转变。XY-8DB型电传动立轴钻机具备电液比例控制钻进参数,长行程送钻以及打捞和泥浆循环的DTC直接转矩控制等特点,使其相比传统立轴钻机在2000~3000 m的钻探施工中发挥更大的优势。随着钻孔深度的增加,原设计的绳索绞车的排绳机构出现了月牙滑块和丝杠异常磨损以及滚轮卡绳等问题,通过受力及结构分析,设计了新的排绳机构,改善了丝杠及滑块的受力状况,并通过表面处理增加了耐磨性,提升了该类设备在施工中的可靠性和安全性。 展开更多
关键词 立轴钻机 绳索绞车 排绳机构 往复丝杠
下载PDF
Effect of temperature difference load of 32 m simply supported box beam bridge on track vertical irregularity 被引量:5
11
作者 Kaize Xie Jun Xing +3 位作者 Li Wang Chunxiang Tian Rong Chen Ping Wang 《Journal of Modern Transportation》 2015年第4期262-271,共10页
In order to study the effect of temperature difference load (TDL) along the vertical direction of a simply supported beam bridge section on the vertical irregularity, a rail-bridge-piers calculation model was establ... In order to study the effect of temperature difference load (TDL) along the vertical direction of a simply supported beam bridge section on the vertical irregularity, a rail-bridge-piers calculation model was established. Taking 32 m simply supported box beam bridge which is widely used in the construction of pas- senger dedicated line in China as an example, influences of the temperature variation between the bottom and top of the bridge, temperature curve index, type of temperature gradient, and beam height on track vertical irregularity were analyzed with the model. The results show that TDL has more effects on long wave track irregularity than on short one, and the wavelength mainly affected is approxi- mately equal to the beam span. The amplitude of irregu- larity caused by TDL is largely affected by the temperature variation, temperature curve index, and type of temperature gradient, so it is necessary to monitor the temperaturedistribution of bridges in different regions to provide accurate calculation parameters. In order to avoid the irregularity exceeding the limit values, the height of 32, 48, and 64 m simply supported box beam bridges must not be less than 2.15, 3.2, and 4.05 m, respectively. 展开更多
关键词 Simply supported beam bridge Temperaturegradient vertical irregularity - Beam height
下载PDF
基于DEM-FEM的立轴冲击式破碎机抛料头变形分析与优化研究 被引量:1
12
作者 龙启涛 赵丽梅 +2 位作者 孙可 吴灿辉 李松 《有色金属(选矿部分)》 CAS 北大核心 2023年第6期39-48,共10页
立轴冲击式破碎机在工作过程中,抛料头受到物料颗粒剧烈地冲击碰撞,受力特性十分复杂。如果采用传统的有限元分析方法,不能准确反映抛料头的受力情况。为了减小立轴冲击式破碎机抛料头在工作过程中的最大变形量,延长抛料头使用寿命,同... 立轴冲击式破碎机在工作过程中,抛料头受到物料颗粒剧烈地冲击碰撞,受力特性十分复杂。如果采用传统的有限元分析方法,不能准确反映抛料头的受力情况。为了减小立轴冲击式破碎机抛料头在工作过程中的最大变形量,延长抛料头使用寿命,同时保证破碎机的破碎效果,提出利用离散元软件EDEM建立立轴冲击式破碎机的离散元仿真模型并结合DEM-FEM耦合分析、正交试验、多元回归分析以及多目标优化等方法对转子结构参数进行优化。首先,运用三维建模软件SolidWorks建立立轴冲击式破碎机三维模型并导入离散元软件EDEM中进行离散元仿真试验,得到抛料头的受力数据,然后利用DEM-FEM耦合分析的方法,将抛料头的受力数据加载到有限元环境中对应工作位置的抛料头FEM模型上,求解得到直观的抛料头变形云图;然后,采用正交试验和极差分析方法,揭示转子结构参数对抛料头最大变形量的影响规律;最后,运用MATLAB软件编写程序,对正交试验数据进行多元回归分析,然后建立以减小抛料头最大变形量和提升抛料速度为优化目标的多目标优化数学模型并进行求解。研究结果表明,当转子直径为890 mm、转子高度为260 mm、导料板安装角度为37°、分料锥倾角为20°时抛料头的最大变形量较小,同时破碎机的破碎效果也得到了保证,为立轴冲击式破碎机关键部件的改进设计提供了理论依据。 展开更多
关键词 立轴冲击式破碎机 离散元 有限元 耦合 优化
下载PDF
基于LS-SVM的金属矿山千米竖井工程造价控制方法 被引量:3
13
作者 肖瑶 金照雨 《黄金》 CAS 2023年第6期1-3,10,共4页
金属矿山千米竖井工程造价控制结构多设定为单层级,控制效率较低,导致最终工程造价价差增加。根据实际控制需求及标准,设定等效造价控制目标,采用多阶控制形式,提升整体的造价控制效率,完成造价控制结构的构建,建立基于LS-SVM的金属矿... 金属矿山千米竖井工程造价控制结构多设定为单层级,控制效率较低,导致最终工程造价价差增加。根据实际控制需求及标准,设定等效造价控制目标,采用多阶控制形式,提升整体的造价控制效率,完成造价控制结构的构建,建立基于LS-SVM的金属矿山千米竖井工程造价控制模型,采用竖井工程动态化监测及LS-SVM修正实现造价控制。测试结果表明:经过5次测定,与传统模糊自适应BP工程造价控制组、传统BIM工程造价控制组相比,LS-SVM工程造价控制组最终得出的可控价差控制在3万元以内,说明该造价控制方法的针对性与稳定性较高,控制效果更佳,具有实际的应用价值。 展开更多
关键词 LS-SVM 金属矿山 千米竖井工程 造价控制 控制方法 造价调整
下载PDF
基于XY-6型立轴钻机的数字化升级改造
14
作者 高明帅 孙军盈 +5 位作者 臧臣坤 薛善忠 宋志亮 韩菲 高帅军 黄江 《钻探工程》 2023年第S01期471-475,共5页
XY系列立轴式岩心钻机作为我国小口径找矿施工的主力机型,其中市场保有量较大的XY-6型立轴钻机可满足2000 m以内的固体矿产勘探,由于其主要为机械传动、人工手动操作制带、匮乏的钻参数据等缺点很难高效支撑新一轮找矿突破行动,所以对... XY系列立轴式岩心钻机作为我国小口径找矿施工的主力机型,其中市场保有量较大的XY-6型立轴钻机可满足2000 m以内的固体矿产勘探,由于其主要为机械传动、人工手动操作制带、匮乏的钻参数据等缺点很难高效支撑新一轮找矿突破行动,所以对于XY系列机械立轴钻机的数字化升级改造迫在眉睫。本文重点介绍在机械式XY-6型立轴钻机基础上对其进行变频电传动和数字化控制的升级改造,相比于原型机,XY-6DB新型电传动立轴钻机实现了回转动力单元变频改造、提升制动系统电液控制升级、手-自一体式换挡方式以及整机的数字化控制方式的升级改造,最终可实现整机的节能、增效、降低劳动强度和提高安全性的目的。 展开更多
关键词 立轴钻机 变频电传动 XY-6DB型钻机 数字化控制
下载PDF
城市浅埋隧道自然排烟竖井临界间距研究
15
作者 王洁 王璐 姜学鹏 《消防科学与技术》 CAS 北大核心 2024年第1期65-69,共5页
竖井间距会改变竖井内外压差,当竖井内外压差为0时,隧道火灾烟气将无法排出,此时竖井对应位置为竖井临界间距。由竖井内外口压差理论分析,给出竖井临界间距理论模型,再采用FDS模拟进行仿真验证。结果表明:设置竖井可明显降低隧道温度,... 竖井间距会改变竖井内外压差,当竖井内外压差为0时,隧道火灾烟气将无法排出,此时竖井对应位置为竖井临界间距。由竖井内外口压差理论分析,给出竖井临界间距理论模型,再采用FDS模拟进行仿真验证。结果表明:设置竖井可明显降低隧道温度,竖井间距为临界间距时,温度下降幅度接近150℃,人员疏散路径温度低于60℃,竖井排烟效率在55%~80%,可有效进行竖井排烟;当竖井间距大于竖井临界间距时,隧道内烟气压强小于竖井出口处风压,竖井排烟效率低于50%。 展开更多
关键词 城市浅埋隧道 竖井排烟 竖井临界间距模型 自然排烟
下载PDF
地下工程竖井定向连接四边形法最优图形分析
16
作者 郑佳荣 张丽丽 +5 位作者 喻静 张胜利 郑阔 桂维振 郑俊刚 赵小平 《煤炭工程》 北大核心 2024年第8期65-68,共4页
为了提高地下工程竖井定向精度,阐释了连接四边形法竖井定向方法,用一个角和一条边为参数确定对称四边形,构建了连接四边形严密平差模型,采用间接平差进行网形精度评估。编写程序遍历条件角和条件边计算定向边精度,绘制等值线,定量分析... 为了提高地下工程竖井定向精度,阐释了连接四边形法竖井定向方法,用一个角和一条边为参数确定对称四边形,构建了连接四边形严密平差模型,采用间接平差进行网形精度评估。编写程序遍历条件角和条件边计算定向边精度,绘制等值线,定量分析连接四边形法最优图形。该研究对于地下工程竖井定向具有实际应用价值。 展开更多
关键词 地下工程 竖井定向 连接四边形法 间接平差 最优图形
下载PDF
黄金矿山深井开采研究进展与发展趋势 被引量:1
17
作者 赵兴东 《黄金》 CAS 2024年第8期1-18,共18页
详细阐述了黄金矿山深井开采国内外研究现状及所面临的技术难题,围绕采动岩石力学理论、岩体结构识别与岩体质量分级、矿山三维工程灾害建模、深部采矿设计方法研究、深部采场爆破落矿技术、采动地压调控、采动地压监测、自承载主动释... 详细阐述了黄金矿山深井开采国内外研究现状及所面临的技术难题,围绕采动岩石力学理论、岩体结构识别与岩体质量分级、矿山三维工程灾害建模、深部采矿设计方法研究、深部采场爆破落矿技术、采动地压调控、采动地压监测、自承载主动释压支护技术、深部采动对地表岩移影响、通风降温技术、智能开采技术、超深竖井建设等展开了详细的讨论与分析;对于黄金矿山非爆采矿机器人研制、采动岩石力学、深部采动地压灾害防控、深井降温技术、超深竖井建设、基于采动地压均衡的深部连续智能化开采技术等方面的未来发展趋势提出了展望,为黄金矿山深井开采的系统研究提供参考依据。 展开更多
关键词 黄金矿山 深井开采 采动岩石力学 采矿方法 通风降温 智能开采 地压调控 超深竖井
下载PDF
考虑松动圈影响的公路隧道大直径竖井围岩压力计算方法
18
作者 任兆丹 冀成 +3 位作者 史育峰 邱军领 邹祯祥 赖金星 《科学技术与工程》 北大核心 2024年第15期6448-6458,共11页
为研究公路隧道大直径竖井围岩压力计算方法,基于极限平衡法推导,并与官田竖井实测数据进行了对比验证,最后分析了竖井直径、侧压力系数、围岩等级对竖井围岩压力的影响规律。结果表明:①与实测数据对比结果显示,本文公式的平均误差度在... 为研究公路隧道大直径竖井围岩压力计算方法,基于极限平衡法推导,并与官田竖井实测数据进行了对比验证,最后分析了竖井直径、侧压力系数、围岩等级对竖井围岩压力的影响规律。结果表明:①与实测数据对比结果显示,本文公式的平均误差度在12.85以内,相比其他公式的误差度在180以上,使相对误差减小了167.15以上,可指导工程人员进行竖井的施工设计;②竖井开挖直径越大,竖井井壁围岩压力越大,但是围岩压力的增长幅度随直径增大而逐渐减弱;③在未达到极限深度之前,侧压力系数越大,竖井井壁围岩压力越大;达到极限深度以后,不同侧压力系数下井壁的围岩压力一样大。侧压力系数越大,井壁围岩压力随竖井深度的增长越大,更快达到最大井壁围岩压力,即极限深度越小;④围岩等级越高,竖井的井壁围岩压力越小,在达到极限深度之后的围岩压力也越小。 展开更多
关键词 围岩压力 公路隧道 大直径竖井 松动圈
下载PDF
便携式全液压钻机与立轴式钻机在袁广-良畈矿区的应用探讨
19
作者 张云 吴丹 +1 位作者 王润伦 吴明 《价值工程》 2023年第23期120-122,共3页
随着便携式全液压钻机在地质岩心钻探项目中的应用越来越广泛,但其与传统立轴式钻机缺少对比与分析,无法更好地指引地质岩心钻探项目的钻机选型与实施。本文通过对比总结便携式全液压钻机与立轴式钻机在袁广-良畈矿区非金属勘查项目中... 随着便携式全液压钻机在地质岩心钻探项目中的应用越来越广泛,但其与传统立轴式钻机缺少对比与分析,无法更好地指引地质岩心钻探项目的钻机选型与实施。本文通过对比总结便携式全液压钻机与立轴式钻机在袁广-良畈矿区非金属勘查项目中的施工应用,系统分析了两种类型的钻机在350m以内浅-中深钻孔为主的非金属勘查项目中施工表现,总结了两类钻机各自的优缺点,为后续开展类似项目提供参考依据。 展开更多
关键词 便携式全液压钻机 立轴式钻机 地质岩心钻探 台月效率
下载PDF
新疆S3-1竖井与TBM主洞段贯通施工技术研究
20
作者 梁志铭 余祥杰 《云南水力发电》 2023年第9期216-222,共7页
简述新疆某引水工程竖井与TBM主洞段贯通施工处理措施,包括竖井爆破施工,主洞TBM附属系统安全防护,主洞贯通部位防护平台搭设,施工现场安全布置等方法,确保了施工安全,最终使竖井实现精准贯通,施工进度较计划提前5d,为竖井与TBM主洞段... 简述新疆某引水工程竖井与TBM主洞段贯通施工处理措施,包括竖井爆破施工,主洞TBM附属系统安全防护,主洞贯通部位防护平台搭设,施工现场安全布置等方法,确保了施工安全,最终使竖井实现精准贯通,施工进度较计划提前5d,为竖井与TBM主洞段贯通施工提供一种解决方案和思路。 展开更多
关键词 竖井爆破施工 主洞TBM附属系统安全防护 防护平台 安全管理
下载PDF
上一页 1 2 60 下一页 到第
使用帮助 返回顶部