A 30 MHz voltage-mode controlled buck converter with fast transient responses is presented.An improved differential difference amplifier(DDA)-based Type-III compensator is proposed to reduce the settling times of the ...A 30 MHz voltage-mode controlled buck converter with fast transient responses is presented.An improved differential difference amplifier(DDA)-based Type-III compensator is proposed to reduce the settling times of the converter during load transients,and to achieve near-optimal transient responses with simple PWM control only.Moreover,a hybrid scheme using a digital linear regulator with automatic transient detection and seamless loop transition is proposed to further improve the transient responses.By monitoring the output voltage of the compensator instead of the output voltage of the converter,the proposed hybrid scheme can reduce undershoot and overshoot effectively with good noise immunity and without interrupting the PWM loop.The converter was fabricated in a 0.13μm standard CMOS process using 3.3 V devices.With an input voltage of 3.3 V,the measured peak efficiencies at the output voltages of 2.4,1.8,and 1.2 V are 90.7%,88%,and 83.6%,respectively.With a load step of 1.25 A and rise and fall times of 2 ns,the measured 1%settling times were 220 and 230 ns,with undershoot and overshoot with PWM control of 72 and 76 mV,respectively.They were further reduced to 36 and 38 mV by using the proposed hybrid scheme,and 1%settling times were also reduced to 125 ns.展开更多
In large loop transient electromagnetic method(TEM),the late time apparent resistivity formula cannot truly reflect the geoelectric model,thus it needs to define the all-time apparent resistivity with the position inf...In large loop transient electromagnetic method(TEM),the late time apparent resistivity formula cannot truly reflect the geoelectric model,thus it needs to define the all-time apparent resistivity with the position information of measuring point.Utilizing very fast simulated annealing(VFSA) to fit the theoretical electromagnetic force(EMF) and measured EMF could obtain the all-time apparent resistivity of the measuring points in rectangular transmitting loop.The selective cope of initial model of VFSA could be confirmed by taking the late time apparent resistivity of transient electromagnetic method as the prior information.For verifying the correctness,the all-time apparent resistivities of the geoelectric models were calculated by VFSA and dichotomy,respectively.The results indicate that the relative differences of apparent resistivities calculated by these two methods are within 3%.The change of measuring point position has little influence on the tracing pattern of all-time apparent resistivity.The first branch of the curve of all-time apparent resistivity is close to the resistivity of the first layer medium and the last branch is close to the resistivity of the last layer medium,which proves the correctness of the arithmetics proposed.展开更多
Thermal conductivity is an important material parameter of silicon when studying the performance and reliability of devices or for guiding circuit design when considering heat dissipation, especially when the self-hea...Thermal conductivity is an important material parameter of silicon when studying the performance and reliability of devices or for guiding circuit design when considering heat dissipation, especially when the self-heating effect becomes prominent in ultra-scaled MOSFETs.The cross-plane thermal conductivity of a thin silicon film is lacking due to the difficulty in sensing high thermal conductivity in the vertical direction.In this paper, a feasible method that utilizes an ultra-fast electrical pulse within 20 μs combined with the hot strip technique is adopted.To the best of our knowledge, this is the first work that shows how to extract the cross-plane thermal conductivity of sub-50 nm(30 nm, 17 nm, and 10 nm)silicon films on buried oxide.The ratio of the extracted cross-plane thermal conductivity of the silicon films over the bulk value is only about 6.9%, 4.3%, and 3.8% at 300 K, respectively.As the thickness of the films is smaller than the phonon mean free path, the classical heat transport theory fails to predict the heat dissipation in nanoscale transistors.Thus, in this study, a ballistic model, derived from the heat transport equation based on extended-irreversible-hydrodynamics(EIT), is used for further investigation, and the simulation results exhibit good consistence with the experimental data.The extracted effective thermal data could provide a good reference for precise device simulations and thermoelectric applications.展开更多
In this paper,an NMOS output-capacitorless low-dropout regulator(OCL-LDO)featuring dual-loop regulation has been proposed,achieving fast transient response with low power consumption.An event-driven charge pump(CP)loo...In this paper,an NMOS output-capacitorless low-dropout regulator(OCL-LDO)featuring dual-loop regulation has been proposed,achieving fast transient response with low power consumption.An event-driven charge pump(CP)loop with the dynamic strength control(DSC),is proposed in this paper,which overcomes trade-offs inherent in conventional structures.The presented design addresses and resolves the large signal stability issue,which has been previously overlooked in the event-driven charge pump structure.This breakthrough allows for the full exploitation of the charge-pump structure's poten-tial,particularly in enhancing transient recovery.Moreover,a dynamic error amplifier is utilized to attain precise regulation of the steady-state output voltage,leading to favorable static characteristics.A prototype chip has been fabricated in 65 nm CMOS technology.The measurement results show that the proposed OCL-LDO achieves a 410 nA low quiescent current(IQ)and can recover within 30 ns under 200 mA/10 ns loading change.展开更多
Distribution transformers operating in modern system grids or in industrial networks are subjected to many switching transients,which may occur due to routine operations,network reconfigurations or as reaction on prot...Distribution transformers operating in modern system grids or in industrial networks are subjected to many switching transients,which may occur due to routine operations,network reconfigurations or as reaction on protection signals.Depending on the network configuration and parameters,such events may lead to external overvoltages and result in additional stresses on the insulation system.This paper presents the influence of a series choke on damping of switching transients in distribution transformers.The impact of the choke is assessed by both amplitude and rise time reduction.The suppression of the transient rise time is shown for a test configuration involving distribution transformers connected to low loss cable lines and a medium voltage breaker.Such phenomena are especially typical for industrial networks where switching operations are very frequent.Both simulation and experiment results are given.Simulation results as well as measurement results confirmed that switching events can lead to high dU/dt and in consequence,can have adverse impacts on insulation system.Voltage escalation during switching event is strongly related with system conditions.The results obtained for presented mitigation method are promising and indicate significant dU/dt reduction as well as number of ignitions and voltage peak value.The protection of distribution transformers with a series choke is a new approach dedicated to environments prone to the occurrence of transients with high steepness.Experimental results show that the application of serial choke with suitable parameters realizes the reduction of dU/dt at the machines terminal from 24 kV/μs to 5 kV/μs,as well as the reduction of voltage peak value from 10 kV to 5 kV.The number of ignitions is also reduced.展开更多
To aim at the distribution parameter characteristics of UHV transmission line, this paper presents a fast extraction method (FE) to extract the accurate fundamentals of current and voltage from the UHV transmission li...To aim at the distribution parameter characteristics of UHV transmission line, this paper presents a fast extraction method (FE) to extract the accurate fundamentals of current and voltage from the UHV transmission line transient process, and locates the fault by utilizing two-end unsynchronized algorithm. The simulation result shows that this method has good performance of accuracy and stability, and has better location precision by comparing with results of one cycle Fourier algorithm. Therefore the method can efficiently improve the precision of fault location during the transient process, and makes the error of location results less than 0.5%.展开更多
In nuclear fusion power supply systems, the thyristors often need to be connected in parallel for sustaining large current. However, research on the reverse recovery transient of parallel thyristors has not been repor...In nuclear fusion power supply systems, the thyristors often need to be connected in parallel for sustaining large current. However, research on the reverse recovery transient of parallel thyristors has not been reported yet. When several thyristors are connected in parallel,they cannot turn-off at the same moment, and thus the turn-off model based on a single thyristor is no longer suitable. In this paper, an analysis is presented for the reverse recovery transient of parallel thyristors. Parallel thyristors can be assumed as one virtual thyristor so that the reverse recovery current can be modeled by an exponential function. Through equivalent transformation of the rectifier circuit, the commutating over-voltage can be calculated based on Kirchhoff’s equation. The reverse recovery current and commutation over-voltage waveforms are measured on an experiment platform for a high power rectifier supply. From the measurement results, it is concluded that the modeling method is acceptable.展开更多
Fast radio bursts(FRBs)are radio transients that are bright and have short duration,with their physical mechanism not being fully understood.We conducted a targeted search for bursts from FRB 20201124A between 2021 Ju...Fast radio bursts(FRBs)are radio transients that are bright and have short duration,with their physical mechanism not being fully understood.We conducted a targeted search for bursts from FRB 20201124A between 2021 June 2and July 20.High time-resolution data were collected for 104.5 hr using the ROACH2-based digital backend.We introduce the details of our FRB search pipeline which is based on HEIMDALL and FETCH.Testing of the injected mock FRBs search could help us better understand the performance of the pipelines,and improve the search algorithms and classifiers.To study the efficiency of our pipeline,5000 mock FRBs were injected into the data and searched using the pipeline.The results of the mock FRB search show that our pipeline can recover almost all(?90%)the injected mock FRBs above a signal-to-noise ratio(S/N)threshold of 15,and the performance is still acceptable(?80%)for injected S/Ns from 10 to 15.The recovery fraction displays relations with S/N,dispersion measure and pulse width.No bursts were detected from FRB 20201124A in the middle of 2021.The non-detection of FRB 20201124A may be due to its quiet phase window or no emission above the threshold of the Nanshan telescope.展开更多
Fast radio bursts(FRBs) are extremely strong radio flares lasting several milliseconds,most of which come from unidentified objects at a cosmological distance.They can be apparently repeating or not.In this paper,we a...Fast radio bursts(FRBs) are extremely strong radio flares lasting several milliseconds,most of which come from unidentified objects at a cosmological distance.They can be apparently repeating or not.In this paper,we analyzed 18 repeaters and 12 non-repeating FRBs observed in the frequency bands of 400–800 MHz from Canadian Hydrogen Intensity Mapping Experiment(CHIME).We investigated the distributions of FRB isotropic-equivalent radio luminosity,considering the K correction.Statistically,the luminosity distribution can be better fitted by Gaussian form than by power-law.Based on the above results,together with the observed FRB event rate,pulse duration,and radio luminosity,FRB origin models are evaluated and constrained such that the gamma-ray bursts(GRBs) may be excluded for the non-repeaters while magnetars or neutron stars(NSs) emitting the supergiant pulses are preferred for the repeaters.We also found the necessity of a small FRB emission beaming solid angle(about 0.1 sr) from magnetars that should be considered,and/or the FRB association with soft gamma-ray repeaters(SGRs) may lie at a low probability of about 10%.Finally,we discussed the uncertainty of FRB luminosity caused by the estimation of the distance that is inferred by the simple relation between the redshift and dispersion measure(DM).展开更多
文摘A 30 MHz voltage-mode controlled buck converter with fast transient responses is presented.An improved differential difference amplifier(DDA)-based Type-III compensator is proposed to reduce the settling times of the converter during load transients,and to achieve near-optimal transient responses with simple PWM control only.Moreover,a hybrid scheme using a digital linear regulator with automatic transient detection and seamless loop transition is proposed to further improve the transient responses.By monitoring the output voltage of the compensator instead of the output voltage of the converter,the proposed hybrid scheme can reduce undershoot and overshoot effectively with good noise immunity and without interrupting the PWM loop.The converter was fabricated in a 0.13μm standard CMOS process using 3.3 V devices.With an input voltage of 3.3 V,the measured peak efficiencies at the output voltages of 2.4,1.8,and 1.2 V are 90.7%,88%,and 83.6%,respectively.With a load step of 1.25 A and rise and fall times of 2 ns,the measured 1%settling times were 220 and 230 ns,with undershoot and overshoot with PWM control of 72 and 76 mV,respectively.They were further reduced to 36 and 38 mV by using the proposed hybrid scheme,and 1%settling times were also reduced to 125 ns.
基金Projects(40804027,41074085) supported by the National Natural Science Foundation of ChinaProject(09JJ3048) supported by the Natural Science Foundation of Hunan Province,ChinaProject(200805331082) supported by the Research Fund for the Doctoral Program of Higher Education,China
文摘In large loop transient electromagnetic method(TEM),the late time apparent resistivity formula cannot truly reflect the geoelectric model,thus it needs to define the all-time apparent resistivity with the position information of measuring point.Utilizing very fast simulated annealing(VFSA) to fit the theoretical electromagnetic force(EMF) and measured EMF could obtain the all-time apparent resistivity of the measuring points in rectangular transmitting loop.The selective cope of initial model of VFSA could be confirmed by taking the late time apparent resistivity of transient electromagnetic method as the prior information.For verifying the correctness,the all-time apparent resistivities of the geoelectric models were calculated by VFSA and dichotomy,respectively.The results indicate that the relative differences of apparent resistivities calculated by these two methods are within 3%.The change of measuring point position has little influence on the tracing pattern of all-time apparent resistivity.The first branch of the curve of all-time apparent resistivity is close to the resistivity of the first layer medium and the last branch is close to the resistivity of the last layer medium,which proves the correctness of the arithmetics proposed.
基金Project supported by the Zhejiang Provincial Natural Science Foundation of China(Grant No.LZ19F040001)the National Natural Science Foundation of China(Grant No.61473287)the NSFC–Zhejiang Joint Fund for the Integration of Industrialization Informatization,China(Grant No.U1609213)
文摘Thermal conductivity is an important material parameter of silicon when studying the performance and reliability of devices or for guiding circuit design when considering heat dissipation, especially when the self-heating effect becomes prominent in ultra-scaled MOSFETs.The cross-plane thermal conductivity of a thin silicon film is lacking due to the difficulty in sensing high thermal conductivity in the vertical direction.In this paper, a feasible method that utilizes an ultra-fast electrical pulse within 20 μs combined with the hot strip technique is adopted.To the best of our knowledge, this is the first work that shows how to extract the cross-plane thermal conductivity of sub-50 nm(30 nm, 17 nm, and 10 nm)silicon films on buried oxide.The ratio of the extracted cross-plane thermal conductivity of the silicon films over the bulk value is only about 6.9%, 4.3%, and 3.8% at 300 K, respectively.As the thickness of the films is smaller than the phonon mean free path, the classical heat transport theory fails to predict the heat dissipation in nanoscale transistors.Thus, in this study, a ballistic model, derived from the heat transport equation based on extended-irreversible-hydrodynamics(EIT), is used for further investigation, and the simulation results exhibit good consistence with the experimental data.The extracted effective thermal data could provide a good reference for precise device simulations and thermoelectric applications.
基金supported by the National Natural Science Foundation of China under Grant 62274189the Natural Science Foundation of Guangdong Province,China,under Grant 2022A1515011054the Key Area R&D Program of Guangdong Province under Grant 2022B0701180001.
文摘In this paper,an NMOS output-capacitorless low-dropout regulator(OCL-LDO)featuring dual-loop regulation has been proposed,achieving fast transient response with low power consumption.An event-driven charge pump(CP)loop with the dynamic strength control(DSC),is proposed in this paper,which overcomes trade-offs inherent in conventional structures.The presented design addresses and resolves the large signal stability issue,which has been previously overlooked in the event-driven charge pump structure.This breakthrough allows for the full exploitation of the charge-pump structure's poten-tial,particularly in enhancing transient recovery.Moreover,a dynamic error amplifier is utilized to attain precise regulation of the steady-state output voltage,leading to favorable static characteristics.A prototype chip has been fabricated in 65 nm CMOS technology.The measurement results show that the proposed OCL-LDO achieves a 410 nA low quiescent current(IQ)and can recover within 30 ns under 200 mA/10 ns loading change.
文摘Distribution transformers operating in modern system grids or in industrial networks are subjected to many switching transients,which may occur due to routine operations,network reconfigurations or as reaction on protection signals.Depending on the network configuration and parameters,such events may lead to external overvoltages and result in additional stresses on the insulation system.This paper presents the influence of a series choke on damping of switching transients in distribution transformers.The impact of the choke is assessed by both amplitude and rise time reduction.The suppression of the transient rise time is shown for a test configuration involving distribution transformers connected to low loss cable lines and a medium voltage breaker.Such phenomena are especially typical for industrial networks where switching operations are very frequent.Both simulation and experiment results are given.Simulation results as well as measurement results confirmed that switching events can lead to high dU/dt and in consequence,can have adverse impacts on insulation system.Voltage escalation during switching event is strongly related with system conditions.The results obtained for presented mitigation method are promising and indicate significant dU/dt reduction as well as number of ignitions and voltage peak value.The protection of distribution transformers with a series choke is a new approach dedicated to environments prone to the occurrence of transients with high steepness.Experimental results show that the application of serial choke with suitable parameters realizes the reduction of dU/dt at the machines terminal from 24 kV/μs to 5 kV/μs,as well as the reduction of voltage peak value from 10 kV to 5 kV.The number of ignitions is also reduced.
文摘To aim at the distribution parameter characteristics of UHV transmission line, this paper presents a fast extraction method (FE) to extract the accurate fundamentals of current and voltage from the UHV transmission line transient process, and locates the fault by utilizing two-end unsynchronized algorithm. The simulation result shows that this method has good performance of accuracy and stability, and has better location precision by comparing with results of one cycle Fourier algorithm. Therefore the method can efficiently improve the precision of fault location during the transient process, and makes the error of location results less than 0.5%.
基金supported by the International Thermonuclear Experimental Reactor Project of China(No.2008 GB104000)
文摘In nuclear fusion power supply systems, the thyristors often need to be connected in parallel for sustaining large current. However, research on the reverse recovery transient of parallel thyristors has not been reported yet. When several thyristors are connected in parallel,they cannot turn-off at the same moment, and thus the turn-off model based on a single thyristor is no longer suitable. In this paper, an analysis is presented for the reverse recovery transient of parallel thyristors. Parallel thyristors can be assumed as one virtual thyristor so that the reverse recovery current can be modeled by an exponential function. Through equivalent transformation of the rectifier circuit, the commutating over-voltage can be calculated based on Kirchhoff’s equation. The reverse recovery current and commutation over-voltage waveforms are measured on an experiment platform for a high power rectifier supply. From the measurement results, it is concluded that the modeling method is acceptable.
基金supported by the National Natural Science Foundation of China(NSFC,Grant Nos.11873080,12041304,U1838109 and 12041301)the CAS Jianzhihua project+3 种基金supported by the Key Laboratory of Xinjiang Uygur Autonomous Region No.2020D04049the National SKA Program of China No.2020SKA0120200the 2018 Project of Xinjiang Uygur Autonomous Region of China for Flexibly Fetching Upscale Talentspartly supported by the Operation,Maintenance and Upgrading Fund for Astronomical Telescopes and Facility Instruments,budgeted from the Ministry of Finance of China(MOF)。
文摘Fast radio bursts(FRBs)are radio transients that are bright and have short duration,with their physical mechanism not being fully understood.We conducted a targeted search for bursts from FRB 20201124A between 2021 June 2and July 20.High time-resolution data were collected for 104.5 hr using the ROACH2-based digital backend.We introduce the details of our FRB search pipeline which is based on HEIMDALL and FETCH.Testing of the injected mock FRBs search could help us better understand the performance of the pipelines,and improve the search algorithms and classifiers.To study the efficiency of our pipeline,5000 mock FRBs were injected into the data and searched using the pipeline.The results of the mock FRB search show that our pipeline can recover almost all(?90%)the injected mock FRBs above a signal-to-noise ratio(S/N)threshold of 15,and the performance is still acceptable(?80%)for injected S/Ns from 10 to 15.The recovery fraction displays relations with S/N,dispersion measure and pulse width.No bursts were detected from FRB 20201124A in the middle of 2021.The non-detection of FRB 20201124A may be due to its quiet phase window or no emission above the threshold of the Nanshan telescope.
基金supported by the National Natural Science Foundation of China (Grant Nos.11988101,U1938117,U1731238,11703003 and 11725313)the International Partnership Program of Chinese Academy of Sciences (Grant No.114A11KYSB20160008)+1 种基金the National Key R&D Program of China (No.2016YFA0400702)the Guizhou Provincial Science and Technology Foundation (Grant No.[2020]1Y019)。
文摘Fast radio bursts(FRBs) are extremely strong radio flares lasting several milliseconds,most of which come from unidentified objects at a cosmological distance.They can be apparently repeating or not.In this paper,we analyzed 18 repeaters and 12 non-repeating FRBs observed in the frequency bands of 400–800 MHz from Canadian Hydrogen Intensity Mapping Experiment(CHIME).We investigated the distributions of FRB isotropic-equivalent radio luminosity,considering the K correction.Statistically,the luminosity distribution can be better fitted by Gaussian form than by power-law.Based on the above results,together with the observed FRB event rate,pulse duration,and radio luminosity,FRB origin models are evaluated and constrained such that the gamma-ray bursts(GRBs) may be excluded for the non-repeaters while magnetars or neutron stars(NSs) emitting the supergiant pulses are preferred for the repeaters.We also found the necessity of a small FRB emission beaming solid angle(about 0.1 sr) from magnetars that should be considered,and/or the FRB association with soft gamma-ray repeaters(SGRs) may lie at a low probability of about 10%.Finally,we discussed the uncertainty of FRB luminosity caused by the estimation of the distance that is inferred by the simple relation between the redshift and dispersion measure(DM).