According to the results of the water and sediment regulations of the Yellow River in year 2002—2007,the effect of erosion and deposition on the lower reaches,the amount and distribution of erosion and deposition in ...According to the results of the water and sediment regulations of the Yellow River in year 2002—2007,the effect of erosion and deposition on the lower reaches,the amount and distribution of erosion and deposition in the river mouth area,the adjustment of river regime,the effect of river regulation projects and changes of flowing capacity of the channel are analyzed.It is revealed that the water and sediment regulation is efficient to reduce deposition and improve the flowing capacity and the conditions of sediment transport.展开更多
In order to scientifically deal with the problems of less water and more sediment in the Yellow River and the uncoordinated relationship between water and sediment,it is necessary to establish a perfect water and sedi...In order to scientifically deal with the problems of less water and more sediment in the Yellow River and the uncoordinated relationship between water and sediment,it is necessary to establish a perfect water and sediment regulation system.Through the calculation of the sediment transport capacity of the Yellow River and the application of the water and sediment regulation system,it is found that the sediment transport efficiency of the Yellow River will increase with the increase of water flow,and there will be an obvious inflection point near the flat discharge.The joint regulation of the backbone reservoir group can discharge the large discharge close to the minimum flat discharge of the downstream river,which improves the sediment transport capacity of the river and alleviates the problem of sediment deposition.In this paper,through the introduction of the Yellow River water and sediment regulation project system,regulation indicators and mechanisms,the author discusses in detail the Yellow River water and sediment regulation scheme and its operation effect,hoping to provide help promote the improvement of the Yellow River governance effect.展开更多
The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments ...The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir. Within four days after the flood peak at 3 000 m3/s entered the distributary, the channel in the river mouth area was eroded quickly. Both the mean values of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3/s or more. Then, the river channel was silted anew in a very short time after completion of the WSDR. Favored by the WSDR project, the fiver status in April 2008 became better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10% at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the fiver mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored and replenished in balance. Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of "To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment".展开更多
基金Supported by National Natural Science Foundation of China(No.50679053)
文摘According to the results of the water and sediment regulations of the Yellow River in year 2002—2007,the effect of erosion and deposition on the lower reaches,the amount and distribution of erosion and deposition in the river mouth area,the adjustment of river regime,the effect of river regulation projects and changes of flowing capacity of the channel are analyzed.It is revealed that the water and sediment regulation is efficient to reduce deposition and improve the flowing capacity and the conditions of sediment transport.
文摘In order to scientifically deal with the problems of less water and more sediment in the Yellow River and the uncoordinated relationship between water and sediment,it is necessary to establish a perfect water and sediment regulation system.Through the calculation of the sediment transport capacity of the Yellow River and the application of the water and sediment regulation system,it is found that the sediment transport efficiency of the Yellow River will increase with the increase of water flow,and there will be an obvious inflection point near the flat discharge.The joint regulation of the backbone reservoir group can discharge the large discharge close to the minimum flat discharge of the downstream river,which improves the sediment transport capacity of the river and alleviates the problem of sediment deposition.In this paper,through the introduction of the Yellow River water and sediment regulation project system,regulation indicators and mechanisms,the author discusses in detail the Yellow River water and sediment regulation scheme and its operation effect,hoping to provide help promote the improvement of the Yellow River governance effect.
基金Supported by National Key Basic Research Program of China (No. 2005CB422304)National Natural Science Foundation of China (No.40872167)
文摘The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir. Within four days after the flood peak at 3 000 m3/s entered the distributary, the channel in the river mouth area was eroded quickly. Both the mean values of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3/s or more. Then, the river channel was silted anew in a very short time after completion of the WSDR. Favored by the WSDR project, the fiver status in April 2008 became better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10% at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the fiver mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored and replenished in balance. Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of "To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment".