In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi...In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.展开更多
The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis...The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis, and expert consultation. This evaluation index system can be divided into six first-level indices: the degree to which facilities are intact and functionality standards are reached, the status of operation and management funds, the rationality and degree of advancement of the management team structure, the adaptability and rationality of the water conservancy project management system, the degree of automatization and informationization of the management techniques, and the conduciveness of the exterior environment. The weights for evaluation indices were obtained through the analytic hierarchy process method with consideration of the difference between public welfare and profit-oriented water conservancy projects. This study provides a scientific method for evaluating the positive operation of water conservancy projects.展开更多
The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological ...The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.展开更多
Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through th...Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through the use of literature review,case analysis and statistical analysis and other methods,with agricultural water conservancy projects as the research object,and comparing activity-based costing with the traditional model of cost accounting,the writer carries out the corresponding value chain analysis,and comes to the following conclusion: the statistical calculation and analysis of the entire construction process based on activity-based costing can accurately and effectively control the costs of water conservancy projects. Through the use of activity-based costing,the cost data of agricultural water conservancy projects is more detailed and accurate,and cost management personnel can also find non-value-added activities,optimize the enterprise's value chain and achieve cost control objectives through the analysis of the activity chain and value chain of agricultural water conservancy projects.展开更多
China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role...China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role in water conservancy projects offarmland. Therefore, full attention should be paid toriver management of farmland. This thesis analyzes itand proposes countermeasures for governance.展开更多
The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of ...The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of water conservancy projects.This article studies the causes of water infiltration in water conservancy projects and introduces related antiseepage technologies,hoping to be a reference for the implementation of anti-seepage projects.Through research,it is found that the factors that cause water infiltration in water conservancy projects include water conservancy project structural changes,environmental factors and construction factors.Relevant personnel can use concrete anti-seepage wall construction technology and high-pressure jet grouting technology to do the relevant anti-seepage work of water conservancy projects.展开更多
In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy e...In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.展开更多
In order to ensure the sustainable growth of rural economy,it is necessary to carry out further research on small-scale water conservancy projects and solve the seepage issue in rural areas.Based on the application si...In order to ensure the sustainable growth of rural economy,it is necessary to carry out further research on small-scale water conservancy projects and solve the seepage issue in rural areas.Based on the application significance of small-scale rural water conservancy projects and the analysis of anti-seepage technologies,along with specific examples,this paper specifically discusses the application of high-pressure jet technology,so as to provide reference for the development of engineering construction.展开更多
Water regulation of the Xiaolangdi Reservoir of the Yellow River was chosen as a case to investigate variations in concentrations and bioavailability of heavy metals caused by water conservancy projects in rivers. Wat...Water regulation of the Xiaolangdi Reservoir of the Yellow River was chosen as a case to investigate variations in concentrations and bioavailability of heavy metals caused by water conservancy projects in rivers. Water and suspended sediment(SPS) samples were collected at downstream sampling sites along the river during this period. Concentrations and speciation of Zn, Cr, Cu, Ni, and Pb in water and SPS samples were analyzed, and their bioaccumulation was studied with Daphnia magna. This study indicated that the exchangeable and carbonatebound fractions of heavy metals in SPS decreased along the studied stretch, and the dissolved heavy metal concentrations increased along the river with 1.6–15 folds. This is because sediment resuspension increased along the river during water regulation, giving rise to the increase of heavy metal release from SPS. The dissolved Zn, Cu, Ni, and Pb concentrations were significantly positively correlated with SPS concentrations, and their increase along the river was greater than Cr. The body burdens of heavy metals in D. magna exposed into samples collected from the reservoir outlet were 1.3–3.0 times lower than those from downstream stations, suggesting that the heavy metal bioavailability increased during water regulation.This should be considered in the reservoir operation.展开更多
This paper introduces a grey classifica- tion method forevaluating the stability of dangerous rock- block masses according tothe Grey System Theory. This method is applied to the stability ofthe V~# dangerous rock- bl...This paper introduces a grey classifica- tion method forevaluating the stability of dangerous rock- block masses according tothe Grey System Theory. This method is applied to the stability ofthe V~# dangerous rock- block masses of Qingjiang water conservancyproject, and better results are abtained. The method which isadvanced in the article is very single and practical, and it can meetall kinds of project's demands.展开更多
The Monument for Building Qarqi Canal was inscribed in the sixth year of Guangxu s reign in the Qing Dynasty(1880).This inscription made a detailed record of the event when the Qing army expelled the invading army of ...The Monument for Building Qarqi Canal was inscribed in the sixth year of Guangxu s reign in the Qing Dynasty(1880).This inscription made a detailed record of the event when the Qing army expelled the invading army of Mohammad Yaqub Beg,whenever the Qing army regained a place,it immediately started recruiting exiled people,restoring agriculture,building water conservancy and did other rehabilitation works.The army of the Qing Dynasty successively established rehabilitation bureaus in various parts of southern Xinjiang to be responsible for the rehabilitation works.These once again set off a climax in the development of water conservancy in multi-ethnic areas in Xinjiang,and laid the foundation for the rapid development of agricultural development and water conservancy in Xinjiang during the Guangxu s reign in the Qing Dynasty.展开更多
Background:Snail control is an important component in the national schistosomiasis control programme in China,by application of chemical molluscicides,forestry projects,agriculture projects and water conservancy proje...Background:Snail control is an important component in the national schistosomiasis control programme in China,by application of chemical molluscicides,forestry projects,agriculture projects and water conservancy projects in recent decades.However,there are still wide areas of snail inhabited in China which remains a great challenge to achieve the goal of schistosomiasis elimination by 2025.Therefore,a SWOT(strengths,weaknesses,opportunities and threats)analysis on snail control measures is required for precision schistosomiasis control.Methods:The SWOT approach,which is a well-known structured analysis tool,was used to identify and evaluate the specific characteristics of four types of snail control measures in China,including chemical mollusciciding,forestry,agriculture,and water conservancy projects.The analysis were carried out based on the information collection from literature review,of research papers,books,annual report database of national schistosomiasis control programme in China,reports from the academic forums,and so on.Results:For chemical mollusciciding,application strategy needs to focus on specific local settings,such as stage of schistosomiasis control,environmental factors,and limitations from external policies and internal deficiencies.Regarding forestry projects,the optimal strategies are to cooperate with other national forestry programmes to share the investment costs and pay attention on wetland protection.In agriculture projects,it is necessary to develop related cash crop industries and combine with national farmland consolidation projects simultaneously to increase the total economic benefits.Concerning water conservancy projects,the main purpose is to control snail migration from snail area to snail-free areas nationwide.Conclusions:Integrated strategies for various measures application and a top-level designed cooperation mechanism will be the necessary to eliminate snail and schistosomiasis in China.展开更多
On the basis of the theories of grey system correlation degree and analytic hierarchy process,this paper studies the problem of plan decision for the exploitation of water conservancy project.According to the data arm...On the basis of the theories of grey system correlation degree and analytic hierarchy process,this paper studies the problem of plan decision for the exploitation of water conservancy project.According to the data army of correlation degree,the optimized plan can be selected objectively and scientifically.Practical example given in this paper have proved the validity of the method.展开更多
基金supported by the Water Conservancy Science and Technology Project of Jiangsu Province(Grant No.2012041)the Jiangsu Province Ordinary University Graduate Student Research Innovation Project(Grant No.CXZZ13_0256)
文摘In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.
文摘The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis, and expert consultation. This evaluation index system can be divided into six first-level indices: the degree to which facilities are intact and functionality standards are reached, the status of operation and management funds, the rationality and degree of advancement of the management team structure, the adaptability and rationality of the water conservancy project management system, the degree of automatization and informationization of the management techniques, and the conduciveness of the exterior environment. The weights for evaluation indices were obtained through the analytic hierarchy process method with consideration of the difference between public welfare and profit-oriented water conservancy projects. This study provides a scientific method for evaluating the positive operation of water conservancy projects.
基金supported by the Fundamental Research Funds for the Central Universities(Grant No.2013B102008)the Open Fund of the Yellow River Committee(Grant No.2011535012)
文摘The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.
文摘Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through the use of literature review,case analysis and statistical analysis and other methods,with agricultural water conservancy projects as the research object,and comparing activity-based costing with the traditional model of cost accounting,the writer carries out the corresponding value chain analysis,and comes to the following conclusion: the statistical calculation and analysis of the entire construction process based on activity-based costing can accurately and effectively control the costs of water conservancy projects. Through the use of activity-based costing,the cost data of agricultural water conservancy projects is more detailed and accurate,and cost management personnel can also find non-value-added activities,optimize the enterprise's value chain and achieve cost control objectives through the analysis of the activity chain and value chain of agricultural water conservancy projects.
文摘China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role in water conservancy projects offarmland. Therefore, full attention should be paid toriver management of farmland. This thesis analyzes itand proposes countermeasures for governance.
文摘The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of water conservancy projects.This article studies the causes of water infiltration in water conservancy projects and introduces related antiseepage technologies,hoping to be a reference for the implementation of anti-seepage projects.Through research,it is found that the factors that cause water infiltration in water conservancy projects include water conservancy project structural changes,environmental factors and construction factors.Relevant personnel can use concrete anti-seepage wall construction technology and high-pressure jet grouting technology to do the relevant anti-seepage work of water conservancy projects.
文摘In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.
文摘In order to ensure the sustainable growth of rural economy,it is necessary to carry out further research on small-scale water conservancy projects and solve the seepage issue in rural areas.Based on the application significance of small-scale rural water conservancy projects and the analysis of anti-seepage technologies,along with specific examples,this paper specifically discusses the application of high-pressure jet technology,so as to provide reference for the development of engineering construction.
基金supported by the National Key R&D Program of China(No.2017YFA0605001)the National Natural Science Foundation of China(No.91547207)the Fund for Innovative Research Group of the National Natural Science Foundation of China(No.51721093)
文摘Water regulation of the Xiaolangdi Reservoir of the Yellow River was chosen as a case to investigate variations in concentrations and bioavailability of heavy metals caused by water conservancy projects in rivers. Water and suspended sediment(SPS) samples were collected at downstream sampling sites along the river during this period. Concentrations and speciation of Zn, Cr, Cu, Ni, and Pb in water and SPS samples were analyzed, and their bioaccumulation was studied with Daphnia magna. This study indicated that the exchangeable and carbonatebound fractions of heavy metals in SPS decreased along the studied stretch, and the dissolved heavy metal concentrations increased along the river with 1.6–15 folds. This is because sediment resuspension increased along the river during water regulation, giving rise to the increase of heavy metal release from SPS. The dissolved Zn, Cu, Ni, and Pb concentrations were significantly positively correlated with SPS concentrations, and their increase along the river was greater than Cr. The body burdens of heavy metals in D. magna exposed into samples collected from the reservoir outlet were 1.3–3.0 times lower than those from downstream stations, suggesting that the heavy metal bioavailability increased during water regulation.This should be considered in the reservoir operation.
文摘This paper introduces a grey classifica- tion method forevaluating the stability of dangerous rock- block masses according tothe Grey System Theory. This method is applied to the stability ofthe V~# dangerous rock- block masses of Qingjiang water conservancyproject, and better results are abtained. The method which isadvanced in the article is very single and practical, and it can meetall kinds of project's demands.
文摘The Monument for Building Qarqi Canal was inscribed in the sixth year of Guangxu s reign in the Qing Dynasty(1880).This inscription made a detailed record of the event when the Qing army expelled the invading army of Mohammad Yaqub Beg,whenever the Qing army regained a place,it immediately started recruiting exiled people,restoring agriculture,building water conservancy and did other rehabilitation works.The army of the Qing Dynasty successively established rehabilitation bureaus in various parts of southern Xinjiang to be responsible for the rehabilitation works.These once again set off a climax in the development of water conservancy in multi-ethnic areas in Xinjiang,and laid the foundation for the rapid development of agricultural development and water conservancy in Xinjiang during the Guangxu s reign in the Qing Dynasty.
基金The National Science and Technology Support Program of China(grant No.2015BAD07B07)the National Natural Science Foundation of China(NSFC)(grant No.41071334)supported this research.
文摘Background:Snail control is an important component in the national schistosomiasis control programme in China,by application of chemical molluscicides,forestry projects,agriculture projects and water conservancy projects in recent decades.However,there are still wide areas of snail inhabited in China which remains a great challenge to achieve the goal of schistosomiasis elimination by 2025.Therefore,a SWOT(strengths,weaknesses,opportunities and threats)analysis on snail control measures is required for precision schistosomiasis control.Methods:The SWOT approach,which is a well-known structured analysis tool,was used to identify and evaluate the specific characteristics of four types of snail control measures in China,including chemical mollusciciding,forestry,agriculture,and water conservancy projects.The analysis were carried out based on the information collection from literature review,of research papers,books,annual report database of national schistosomiasis control programme in China,reports from the academic forums,and so on.Results:For chemical mollusciciding,application strategy needs to focus on specific local settings,such as stage of schistosomiasis control,environmental factors,and limitations from external policies and internal deficiencies.Regarding forestry projects,the optimal strategies are to cooperate with other national forestry programmes to share the investment costs and pay attention on wetland protection.In agriculture projects,it is necessary to develop related cash crop industries and combine with national farmland consolidation projects simultaneously to increase the total economic benefits.Concerning water conservancy projects,the main purpose is to control snail migration from snail area to snail-free areas nationwide.Conclusions:Integrated strategies for various measures application and a top-level designed cooperation mechanism will be the necessary to eliminate snail and schistosomiasis in China.
文摘On the basis of the theories of grey system correlation degree and analytic hierarchy process,this paper studies the problem of plan decision for the exploitation of water conservancy project.According to the data army of correlation degree,the optimized plan can be selected objectively and scientifically.Practical example given in this paper have proved the validity of the method.