Key techniques for evaluation of safety monitoring sensors in water conservancy and hydropower engineering 被引量:1
1
作者 Yan XIANG Lin WANG +2 位作者 Zhan-jun WANG Hui YUAN Yun-jie GUAN 《Water Science and Engineering》 EI CAS 2012年第4期440-449,共10页
For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitorin... For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high 展开更多
关键词 water conservancy and hydropower engineering safety monitoring sensor Xiaolangdi water Control project Xiaoxi hydropower project
下载PDF
Analysis on the Problems of Solutions of Water Conservancy & Hydropower Engineering Cost Management
2
作者 Bo Yao 《Frontiers Research of Architecture and Engineering》 2018年第3期84-86,共3页
With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into th... With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions. 展开更多
关键词 water conservancy & hydropower ENGINEERING COST management PROBLEM SOLUTIONS
下载PDF
The Application of 3D Visualization Technology in the Construction of Water Conservancy and Hydropower
3
作者 Xia Wei 《International Journal of Technology Management》 2014年第4期1-3,共3页
This paper put forward the structure and construction process of three-dimensional visualization of hydroelectric construction system model based on GIS and 3D visualization platform. The paper first describes the 3D ... This paper put forward the structure and construction process of three-dimensional visualization of hydroelectric construction system model based on GIS and 3D visualization platform. The paper first describes the 3D visualization based on GIS, then discusses the method of constructing 3D visual digital model, and then introduces the terrain digital technology, feature modeling technology. Finally, the technical route shows that this method has good practicability. 展开更多
关键词 water conservancy and hydropower Engineering 3D visualization process model spatial analysis
下载PDF
Joint optimization scheduling for water conservancy projects incomplex river networks 被引量:6
4
作者 Qin Liu Guo-hua Fang +1 位作者 Hong-bin Sun Xue-wen Wu 《Water Science and Engineering》 EI CAS CSCD 2017年第1期43-52,共10页
In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi... In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks. 展开更多
关键词 Complex river network water conservancy project Hydraulic structure Flow capacity simulation Scheduling model Optimal scheduling
下载PDF
Evaluation index system for positive operation of water conservancy projects 被引量:3
5
作者 Qing-yuan ZHU Guo-hua FANG 《Water Science and Engineering》 EI CAS 2009年第4期110-117,共8页
The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis... The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis, and expert consultation. This evaluation index system can be divided into six first-level indices: the degree to which facilities are intact and functionality standards are reached, the status of operation and management funds, the rationality and degree of advancement of the management team structure, the adaptability and rationality of the water conservancy project management system, the degree of automatization and informationization of the management techniques, and the conduciveness of the exterior environment. The weights for evaluation indices were obtained through the analytic hierarchy process method with consideration of the difference between public welfare and profit-oriented water conservancy projects. This study provides a scientific method for evaluating the positive operation of water conservancy projects. 展开更多
关键词 water conservancy project positive operation evaluation index system analytic hierarchy process WEIGHT
下载PDF
θ-improved limited tolerance relation model of incomplete information system for evaluation of water conservancy project management modernization 被引量:4
6
作者 Yu-qin GAO Guo-hua FANG Ya-qin LIU 《Water Science and Engineering》 EI CAS CSCD 2013年第4期469-477,共9页
The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological ... The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model. 展开更多
关键词 Key words: modernization of water conservancy project management O-improved limitedtolerance relation model upper and lower approximations threshold
下载PDF
Analysis on Regulation Effect of Water Conservancy Project in Upper Reaches of Wujiang River,Guizhou on Runoff
7
作者 Yang Dongfang Suo Hongmin +2 位作者 Zhang Rong Zhu Sixi Wang Lin 《Meteorological and Environmental Research》 CAS 2017年第3期24-29,共6页
Based on monthly runoff data of Hongjiadu,Guizhou from October 2013 to June 2015 and monthly runoff data of Yachi River,Guizhou from April 2014 to May 2015,using REOF and multiple linear regression analysis,regulation... Based on monthly runoff data of Hongjiadu,Guizhou from October 2013 to June 2015 and monthly runoff data of Yachi River,Guizhou from April 2014 to May 2015,using REOF and multiple linear regression analysis,regulation effect of water conservancy project in upper reaches of Wujiang River on monthly runoff of the river was analyzed. Seasonal temporal-spatial change of monthly runoff in Hongjiadu and Yachi River mainly contained two kinds of modalities. The first modality was that of Yachi River,which was main component of seasonal change of monthly runoff,and peak appeared in July. Space load of Yachi River modality was larger than Hongjiadu,and manual control ability of monthly runoff in Hongjiadu was larger than Yachi River. The second modality was that of Hongjiadu,and peak appeared in December. Space load of Hongjiadu modality was larger than Yachi River,and manual control ability of monthly runoff in Yachi River was larger than Hongjiadu. Seasonal changes of time components of two modalities had significant inverse phase. Regulation effect of Hongjiadu modality advanced Yachi River modality,and regulation effect of water conservancy project in Hongjiadu modality was larger than that of Yachi River modality,and seasonal distribution characteristics of regional rainfall was basically eliminated in Hongjiadu modality. Some seasonal distribution characteristics of regional rainfall were maintained in Yachi River modality. Monthly runoff modality of Yachi River had water storage regulation effect on a smaller part of regional monthly rainfall modality. Monthly runoff modality of Hongjiadu mainly had water storage regulation effect on south-north type of component of regional monthly rainfall,while most components of regional monthly rainfall modality did not have significant impact on monthly runoff modality of Hongjiadu. 展开更多
关键词 Hongjiadu Yachi RIVER MONTHLY RUNOFF REOF ANALYSIS water conservancy project
下载PDF
A Study on Cost Control of Agricultural Water Conservancy Projects Based on Activity-based Costing
8
作者 Tiantian TANG 《Asian Agricultural Research》 2017年第7期11-14,共4页
Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through th... Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through the use of literature review,case analysis and statistical analysis and other methods,with agricultural water conservancy projects as the research object,and comparing activity-based costing with the traditional model of cost accounting,the writer carries out the corresponding value chain analysis,and comes to the following conclusion: the statistical calculation and analysis of the entire construction process based on activity-based costing can accurately and effectively control the costs of water conservancy projects. Through the use of activity-based costing,the cost data of agricultural water conservancy projects is more detailed and accurate,and cost management personnel can also find non-value-added activities,optimize the enterprise's value chain and achieve cost control objectives through the analysis of the activity chain and value chain of agricultural water conservancy projects. 展开更多
关键词 Activity-based costing Agricultural water conservancy projects Cost control
下载PDF
Research on performance evaluation of small water conservancy facilities construction project in Hebei Province
9
作者 Li Mingwei Wang Xiaoyan Wei Jinghong 《International Journal of Technology Management》 2014年第2期105-108,共4页
This paper takes Hebei province of small water conservancy facilities construction project as the research object, the performance evaluation purposes of construction of farmland water conservancy facilities project, ... This paper takes Hebei province of small water conservancy facilities construction project as the research object, the performance evaluation purposes of construction of farmland water conservancy facilities project, the data sources when carry out performance evaluation, performance evaluation procedures and limitations of farmland water conservancy facilities construction project performance evaluation were discussed. 展开更多
关键词 small water conservancy facilities project performance perfomaance evaluation Hebei Province
下载PDF
River Treatment and Measures in Water Conservancy Projects of Small Farmland
10
作者 Guilan Chen 《Journal of Architectural Research and Development》 2020年第4期22-25,共4页
China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role... China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role in water conservancy projects offarmland. Therefore, full attention should be paid toriver management of farmland. This thesis analyzes itand proposes countermeasures for governance. 展开更多
关键词 Small farmland water conservancy project River regulation
下载PDF
Discussion on Anti-seepage Wall and Anti-seepage Technology of Water Conservancy Project
11
作者 Jie Tao Qingpo Wang 《Journal of World Architecture》 2020年第5期14-17,共4页
The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of ... The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of water conservancy projects.This article studies the causes of water infiltration in water conservancy projects and introduces related antiseepage technologies,hoping to be a reference for the implementation of anti-seepage projects.Through research,it is found that the factors that cause water infiltration in water conservancy projects include water conservancy project structural changes,environmental factors and construction factors.Relevant personnel can use concrete anti-seepage wall construction technology and high-pressure jet grouting technology to do the relevant anti-seepage work of water conservancy projects. 展开更多
关键词 water conservancy project Anti-seepage technology Anti-seepage wall
下载PDF
Research on the Present Situation and Improvement Strategy of Water Conservancy Project Construction Quality Management based on the Quality Efficiency Equilibrium Theory
12
作者 Ren Jianfei 《International Journal of Technology Management》 2015年第12期13-16,共4页
In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy e... In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality. 展开更多
关键词 water conservancy project Quality Management Quality Efficiency Equilibrium
下载PDF
Discussion on Anti-Seepage Technologies in the Construction of Small-Scale Rural Water Conservancy Projects
13
作者 Suxiang Yuan 《Journal of World Architecture》 2022年第2期19-24,共6页
In order to ensure the sustainable growth of rural economy,it is necessary to carry out further research on small-scale water conservancy projects and solve the seepage issue in rural areas.Based on the application si... In order to ensure the sustainable growth of rural economy,it is necessary to carry out further research on small-scale water conservancy projects and solve the seepage issue in rural areas.Based on the application significance of small-scale rural water conservancy projects and the analysis of anti-seepage technologies,along with specific examples,this paper specifically discusses the application of high-pressure jet technology,so as to provide reference for the development of engineering construction. 展开更多
关键词 Small-scale water conservancy projects Rural areas Anti-seepage technology High-pressure jet
下载PDF
Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects 被引量:2
14
作者 Chhatra Bahadur Basnet Krishna Kanta Panthi 《Journal of Rock Mechanics and Geotechnical Engineering》 CSCD 2018年第3期486-512,共27页
Norwegian hydropower industry has more than 100 years of experiences in constructing more than4000 km-long unlined pressure shafts and tunnels with maximum static head of 1047 m(equivalent to almost 10.5 MPa) reache... Norwegian hydropower industry has more than 100 years of experiences in constructing more than4000 km-long unlined pressure shafts and tunnels with maximum static head of 1047 m(equivalent to almost 10.5 MPa) reached at unlined pressure tunnel of Nye Tyin project. Experiences gained from construction and operation of these unlined pressure shafts and tunnels were the foundation to develop design criteria and principles applied in Norway and some other countries. In addition to the confinement criteria, Norwegian state-of-the-art design principle for unlined pressure shaft and tunnel is that the minor principal stress at the location of unlined pressure shaft or tunnel should be more than the water pressure in the shaft or tunnel. This condition of the minor principal stress is prerequisite for the hydraulic jacking/splitting not to occur through joints and fractures in rock mass. Another common problem in unlined pressure shafts and tunnels is water leakage through hydraulically splitted joints or pre-existing open joints. This article reviews some of the first attempts of the use of unlined pressure shaft and tunnel concepts in Norway, highlights major failure cases and two successful cases of significance, applies Norwegian criteria to the cases and reviews and evaluates triggering factors for failure.This article further evaluates detailed engineering geology of failure cases and also assesses common geological features that could have aggravated the failure. The minor principal stress is investigated and quantified along unlined shaft and tunnel alignment of six selected project cases by using threedimensional numerical model. Furthermore, conditions of failure through pre-existing open joints by hydraulic jacking and leakage are assessed by using two-dimensional fluid flow analysis. Finally, both favorable and unfavorable ground conditions required for the applicability of Norwegian confinement criteria in locating the unlined pressure shafts and tunnels for geotectonic environment different from that of Norway are highlighted. 展开更多
关键词 hydropower projects Unlined pressure shafts and tunnels Minor principal stress Hydraulic jacking water leakage
下载PDF
Spatiotemporal evolution of water conservation function and its driving factors in the Huangshui River Basin, China
15
作者 YUAN Ximin SU Zhiwei +1 位作者 TIAN Fuchang WANG Pengquan 《Journal of Arid Land》 SCIE CSCD 2024年第11期1484-1504,共21页
The Grain for Green project has had a substantial influence on water conservation in the Huangshui River Basin,China through afforestation and grassland restoration over the past two decades.However,a comprehensive un... The Grain for Green project has had a substantial influence on water conservation in the Huangshui River Basin,China through afforestation and grassland restoration over the past two decades.However,a comprehensive understanding of the spatiotemporal evolution of water conservation function and its driving factors remains incomplete in this basin.In this study,we utilized the Integrated Valuation of Ecosystem Services and Tradeoffs(InVEST)model to examine the spatiotemporal evolution of water conservation function in the Huangshui River Basin from 2000 to 2020.Additionally,we employed the random forest model,Pearson correlation analysis,and geographical detector(Geodetector)techniques to investigate the primary factors and factor interactions affecting the spatial differentiation of water conservation function.The findings revealed several key points.First,the high-latitude northern region of the study area experienced a significant increase in water conservation over the 21-a period.Second,the Grain for Green project has played a substantial role in improving water conservation function.Third,precipitation,plant available water content(PAWC),grassland,gross domestic product(GDP),and forest land were primary factors influencing the water conservation function.Finally,the spatial differentiation of water conservation function was determined by the interactions among geographical conditions,climatic factors,vegetation biophysical factors,and socio-economic factors.The findings have significant implications for advancing ecological protection and restoration initiatives,enhancing regional water supply capabilities,and safeguarding ecosystem health and stability in the Huangshui River Basin. 展开更多
关键词 water conservation function Grain for Green project climate change Integrated Valuation of Ecosystem Services and Tradeoffs(InVEST)model random forest geographical detector(Geodetector) Huangshui River Basin
下载PDF
Water Consumption by Hydropower, Does It Worth Allocation under Ethiopian Context
16
作者 Mebruk Mohammed Nurhusein 《Journal of Water Resource and Protection》 2020年第3期183-202,共20页
The Ethiopian water policy strictly follows water allocation as a principle in setting out water consumption problems and demand projection. Hydroelectric power plants supply the larger share (88%) of the electricity ... The Ethiopian water policy strictly follows water allocation as a principle in setting out water consumption problems and demand projection. Hydroelectric power plants supply the larger share (88%) of the electricity in Ethiopia. 86% of Ethiopia’s plan to 2020 energy supply is expected to be from hydropower. This paper defines water consumption in hydropower production as the quantity of water that leaves the analyzed projects (reservoir regulated hydropower projects) through evaporation. Water consumed by hydropower development has never been studied at a country scale. Thus, in attempting to understand water consumption by the hydropower development, this study will be the first to acknowledge the water consumption by all storage regulated hydropower plants developed in Ethiopia. While studying and designing reservoir regulated hydropower production, the overall effect of water consumption by the projects is assumed to be minimal;thus ignoring water allocation to hydropower projects is a common procedure in Ethiopia. In this study, for multipurpose projects, to identify the water consumption by hydropower against the other purpose (irrigation) consumption, water consumption factors based on economic benefits were used. The study has shown that the 14 existing and under construction reservoir regulated hydropower projects will consume 1.881 billion m3 of water annually. This will make hydropower the second most water consuming water resource development next to Irrigation in the country. Together with the 22 upcoming projects the water consumption will be 3.756 billion m3/year. The results also show that hydropower consumption in the country will take an average of 2.41% of the total water stored in a reservoir. This value is in the range of nearly zero for power projects that use natural lakes as their reservoir (Tana Beles, Tis Abay I & II) and GERD to 10.64%. The total reservoir volume that will be created in the country after completion of the 22 planned projects is larger than 233 BCM, which is greater than the surface water volume the country possesses. This indicates that the future water consumption by hydropower plants shall be revised in accordance with changes made in the final design of each planned projects. Nonetheless, this research provides scientific support for the argument that the production of hydroelectricity by reservoir regulated hydropower schemes, in countries like Ethiopia, is a water consumer. Thus, water allocation shall not ignore its demand. 展开更多
关键词 Ethiopia Reservoir Regulated hydropower projects water ALLOCATION water CONSUMPTION
下载PDF
Analysis of Winter Concrete Construction in Water Conservation Project
17
作者 Sun Wenzhong 《Journal of Architectural Research and Development》 2018年第3期6-10,共5页
The construction of water conservancy projects should commence during optimal atmospheric conditions and non-flood period to ensure completion before the flood season begin in summer.In most areas of Northern China,th... The construction of water conservancy projects should commence during optimal atmospheric conditions and non-flood period to ensure completion before the flood season begin in summer.In most areas of Northern China,the temperature during winter remain at lower level,in which environmental factors play the most important role in the construction of water conservancy projects.In particular,low temperature directly affects the strength of concrete and delays its solidification,this highly affects the quality and progress of concrete construction.In order to overcome this barrier,better planning,for reasonable and effective construction techniques and targeted control measures should be adopted to reduce the adverse effects of low temperature to assure a strong and safe architecture. 展开更多
关键词 water conservancy projectS CONCRETE WINTER CONSTRUCTION
下载PDF
Influences of Water Conservancy and Hydropower Projects on Runoff in Qingjiang River Upstream Basin
18
作者 Yi Sun Junwei Wan +2 位作者 Songyuan Yang Xinghua Xue Kun Huang 《Journal of Earth Science》 SCIE CAS CSCD 2016年第1期110-116,共7页
Hydrological data on the Upper Qingjiang River from 1960 to 2012 document trends of runoff caused by hydropower engineering projects and long-term changes in rainfall. Annual runoff correlates strongly with annual pre... Hydrological data on the Upper Qingjiang River from 1960 to 2012 document trends of runoff caused by hydropower engineering projects and long-term changes in rainfall. Annual runoff correlates strongly with annual precipitation, but is significantly reduced after reservoir construction compared to earlier values. Comparisons of intense, pre- and post-construction rainfall events suggest that the Chebahe and Dalongtan reservoir projects respectively clips the magnitude of the flood peaks and delays runoff delivery. 展开更多
关键词 Qingjiang River water conservancy hydropower project runoff characteristics hydrological response rainfall intensity.
原文传递
Study on Safety and Stability Evaluation of Waste Disposal Field of a Hydropower Station Based on <i>In Situ</i>Monitoring
19
作者 Kun Sun Houcai Sun +1 位作者 Yang Lu Qianzhu Zhang 《Journal of Geoscience and Environment Protection》 2020年第5期221-230,共10页
Reasonable site selection, blocking to meet design standards, interception and drainage and other protective measures are the basic conditions for not causing disaster in slag disposal site. A hydropower station is lo... Reasonable site selection, blocking to meet design standards, interception and drainage and other protective measures are the basic conditions for not causing disaster in slag disposal site. A hydropower station is located in mountainous area, the amount of slag abandoned is large, the grade of slag disposal field is high, and the site selection is difficult. On the basis of in Situ deformation monitoring, the slope stability of slag disposal site is calculated by Swedish arc method through the analysis of the scale, grade, site selection, surrounding environment, cut and discharge, blocking and protection design standards of slag disposal site. Under normal and abnormal operating conditions, the slope stability of slag disposal site meets the requirements of the code, and the results of in Situ deformation monitoring verify the calculation results of slope stability of slag disposal site by Swedish circular arc method. 展开更多
关键词 Soil and water conservation hydropower Station Waste Disposal FIELD In Situ MONITORING Safety and Stability
下载PDF
软土地基上水利枢纽基础处理施工技术
20
作者 陈高臣 《山西建筑》 2025年第2期195-198,共4页
对于水利枢纽工程而言,基础处理的科学性、合理性直接关系到工程的安全运行和经济效益。软土地基因其低承载力、高压缩性和流变特性,为水利枢纽工程的设计与施工带来诸多挑战,这些地质条件要求采用特定的工程技术以确保结构的稳定性和... 对于水利枢纽工程而言,基础处理的科学性、合理性直接关系到工程的安全运行和经济效益。软土地基因其低承载力、高压缩性和流变特性,为水利枢纽工程的设计与施工带来诸多挑战,这些地质条件要求采用特定的工程技术以确保结构的稳定性和功能的可靠性。从搅拌桩的布置与施工、混凝土的浇筑与固化过程以及施工后的质量控制与验收等方面阐述了软土地基上水利枢纽基础处理的施工技术,最后对地基加固成效进行了评估,确保加固措施达到预期效果。 展开更多
关键词 水利枢纽工程 软土地基 防渗屏障 HDPE膜
下载PDF