In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the di...In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the distribution of remaining oil horizontal wells have been given full play to stabilizing oil production and controlling water cut, reducing the producing pressure drop, improving well productivity and other advantages, and the development and deployment has been optimized; horizontal wells have been applied to solve problems such as old well casing damages, shutting down wells, low-productivity and low- efficiency wells, and high water cut wells to improve the utilization rate of old wells; through separate layer system improved injection production pattern, adjustment wells have been optimized and deployed, and part measures wells have been preferably selected to tap the residual oil improve the degree of reserves control realize the stabilization of oil production and control of water cut in an old oilfield, and further improve the development effects.展开更多
Water cut is a key evaluation parameter for reservoir development evaluation. Relative permeability curve reflects reservoir characteristics and fluid characteristics. It is important to figure out the influence law o...Water cut is a key evaluation parameter for reservoir development evaluation. Relative permeability curve reflects reservoir characteristics and fluid characteristics. It is important to figure out the influence law of oil relative permeability on water cut. Based on the 269 relative permeability curves of Bohai oilfields, the distribution of oil index of Bohai oilfields were studied. On the basis, combined with Corey expression of relative permeability and fractional flow equation, the theoretical relationship between oil index and water cut increasing rate was established. Three end points of water cut increasing rate curve were proposed and the influence law between three end points and oil index was studied. The results show that the oil index has a linear relationship with three end points. When the value of water oil mobile ratio is large than 1, with the increase of oil index, maximum value of water cut increasing rate gradually increase. When the value of water oil mobile ratio is less than 10, oil index has great effect on recovery percent when water cut increasing rate reaches to the maximum value as well as water cut when water cut increasing rate reaches to the maximum value. The application of SS field shows that the theoretical value is consistent with the field data.展开更多
Based on oil development costs, the application research in the technical and economic limits calculation of oil development and the production optimal allocation to all the oilfields, was finished. At the same time, ...Based on oil development costs, the application research in the technical and economic limits calculation of oil development and the production optimal allocation to all the oilfields, was finished. At the same time, according to the regression of real development costs, a new method for oil well economic water cut and oil well economic rate are set up, the production optimal allocation is developed with satisfactory results.展开更多
X oilfield is an offshore strong bottom water reservoir with water cut up to 96% at present, and liquid extraction has become one of the main ways to increase oil production. However, the current liquid production of ...X oilfield is an offshore strong bottom water reservoir with water cut up to 96% at present, and liquid extraction has become one of the main ways to increase oil production. However, the current liquid production of the oilfield reaches 60,000 m</span><sup><span style="font-family:Verdana;">3</span></sup><span style="font-family:Verdana;">/d due to the limitation of offshore platform, well trough and equipment, the oilfield is unable to continue liquid extraction. In order to maximize the oil production of the oilfield, it is necessary to study the strategy of shut in and cone pressure. Through numerical simulation, this paper analyzes the influence of different factors, such as crude oil density, viscosity, reservoir thickness, interlayer, permeability and so on, on the drop height of water cone and the effect of precipitation and oil increase after well shut in. At the same time, the weight of each factor is analyzed by combining the actual dynamic data with the fuzzy mathematics method, and the strategy of well shut in and cone pressure is formulated for the offshore strong bottom water reservoir. It provides the basis and guidance for the reasonable use of shut in pressure cone when the reservoir with strong bottom water meets the bottleneck of liquid volume.展开更多
Water injection can compensate for pressure depletion of production.This paper firstly investigated into the equilibrium issue among water influx,water injection and production.Equilibrium principle was elaborated thr...Water injection can compensate for pressure depletion of production.This paper firstly investigated into the equilibrium issue among water influx,water injection and production.Equilibrium principle was elaborated through deduction of equilibrium equation and presentation of equilibrium curves with an“equilibrium point”.Influences of artificial controllable factors(e.g.well ratio of injection to production and total well number)on equilibrium were particularly analyzed using field data.It was found that the influences were mainly reflected as the location move of equilibrium point with factor change.Then reservoir pressure maintenance level was especially introduced to reveal the variation law of liquid rate and oil rate with the rising of water cut.It was also found that,even if reservoir pressure kept constant,oil rate still inevitably declined.However,in the field,a stabilized oil rate was always pursued for development efficiency.Therefore,the equilibrium issue of stabilized oil production was studied deeply through probing into some effective measures to realize oil rate stability after the increase of water cut for the example reservoir.Successful example application indicated that the integrated approach was very practical and feasible,and hence could be used to the other similar reservoir.展开更多
文摘In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the distribution of remaining oil horizontal wells have been given full play to stabilizing oil production and controlling water cut, reducing the producing pressure drop, improving well productivity and other advantages, and the development and deployment has been optimized; horizontal wells have been applied to solve problems such as old well casing damages, shutting down wells, low-productivity and low- efficiency wells, and high water cut wells to improve the utilization rate of old wells; through separate layer system improved injection production pattern, adjustment wells have been optimized and deployed, and part measures wells have been preferably selected to tap the residual oil improve the degree of reserves control realize the stabilization of oil production and control of water cut in an old oilfield, and further improve the development effects.
文摘Water cut is a key evaluation parameter for reservoir development evaluation. Relative permeability curve reflects reservoir characteristics and fluid characteristics. It is important to figure out the influence law of oil relative permeability on water cut. Based on the 269 relative permeability curves of Bohai oilfields, the distribution of oil index of Bohai oilfields were studied. On the basis, combined with Corey expression of relative permeability and fractional flow equation, the theoretical relationship between oil index and water cut increasing rate was established. Three end points of water cut increasing rate curve were proposed and the influence law between three end points and oil index was studied. The results show that the oil index has a linear relationship with three end points. When the value of water oil mobile ratio is large than 1, with the increase of oil index, maximum value of water cut increasing rate gradually increase. When the value of water oil mobile ratio is less than 10, oil index has great effect on recovery percent when water cut increasing rate reaches to the maximum value as well as water cut when water cut increasing rate reaches to the maximum value. The application of SS field shows that the theoretical value is consistent with the field data.
文摘Based on oil development costs, the application research in the technical and economic limits calculation of oil development and the production optimal allocation to all the oilfields, was finished. At the same time, according to the regression of real development costs, a new method for oil well economic water cut and oil well economic rate are set up, the production optimal allocation is developed with satisfactory results.
文摘X oilfield is an offshore strong bottom water reservoir with water cut up to 96% at present, and liquid extraction has become one of the main ways to increase oil production. However, the current liquid production of the oilfield reaches 60,000 m</span><sup><span style="font-family:Verdana;">3</span></sup><span style="font-family:Verdana;">/d due to the limitation of offshore platform, well trough and equipment, the oilfield is unable to continue liquid extraction. In order to maximize the oil production of the oilfield, it is necessary to study the strategy of shut in and cone pressure. Through numerical simulation, this paper analyzes the influence of different factors, such as crude oil density, viscosity, reservoir thickness, interlayer, permeability and so on, on the drop height of water cone and the effect of precipitation and oil increase after well shut in. At the same time, the weight of each factor is analyzed by combining the actual dynamic data with the fuzzy mathematics method, and the strategy of well shut in and cone pressure is formulated for the offshore strong bottom water reservoir. It provides the basis and guidance for the reasonable use of shut in pressure cone when the reservoir with strong bottom water meets the bottleneck of liquid volume.
基金the NSFC(National Natural Science Foundation of China)for supporting this article through two projects:the National Science Fund for Young Scholars of China(Grant No.51304164)“Research on the pressure dynamics of multiple-acidized-fractured horizontal wells in fractured-vuggy carbonate formations”+2 种基金the National Science Fund for Distinguished Young Scholars of China(Grant No.51525404),“Fracturing and acidizing in low permeability and tight reservoirs”financially supported by the Fok Ying Tung Education Foundation for Young Teachers in the Higher Education Institutions of China(Grant No.151050)financially supported by a basic research project under Grant No.2015JY0132 from the Science and Technology Department of Sichuan Province.
文摘Water injection can compensate for pressure depletion of production.This paper firstly investigated into the equilibrium issue among water influx,water injection and production.Equilibrium principle was elaborated through deduction of equilibrium equation and presentation of equilibrium curves with an“equilibrium point”.Influences of artificial controllable factors(e.g.well ratio of injection to production and total well number)on equilibrium were particularly analyzed using field data.It was found that the influences were mainly reflected as the location move of equilibrium point with factor change.Then reservoir pressure maintenance level was especially introduced to reveal the variation law of liquid rate and oil rate with the rising of water cut.It was also found that,even if reservoir pressure kept constant,oil rate still inevitably declined.However,in the field,a stabilized oil rate was always pursued for development efficiency.Therefore,the equilibrium issue of stabilized oil production was studied deeply through probing into some effective measures to realize oil rate stability after the increase of water cut for the example reservoir.Successful example application indicated that the integrated approach was very practical and feasible,and hence could be used to the other similar reservoir.