For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention....For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention. In this study, a water hammer protection scheme combined with an overflow surge tank and a regulating valve was developed. A mathematical model of the overflow surge tank was developed, and an analytical formula for the height of the overflow surge tank was derived. Furthermore, a practical water supply project was used to evaluate the feasibility of the combined protection scheme and analyze the sensitivity of valve regulation rules. The results showed that the combined protection scheme effectively reduced the height of the surge tank, lessened the difficulties related to construction, and reduced the necessary financial investment for the project. The two-stage closing rule articulated as fast first and then slow could minimize the overflow volume of the surge tank when the power failure occurred, while the two-stage opening rule articulated as slow first and then fast could be more conducive to the safety of the water supply system when the pump started up.展开更多
In 2023,two consecutive earthquakes exceeding a magnitude of 7 occurred in Türkiye,causing severe casualties and economic losses.The damage to critical urban infrastructure and building structures,including highw...In 2023,two consecutive earthquakes exceeding a magnitude of 7 occurred in Türkiye,causing severe casualties and economic losses.The damage to critical urban infrastructure and building structures,including highways,railroads,and water supply pipelines,was particularly severe in areas where these structures intersected the seismogenic fault.Critical infrastructure projects that traverse active faults are susceptible to the influence of fault movement,pulse velocity,and ground motions.In this study,we used a unique approach to analyze the acceleration records obtained from the seismic station array(9 strong ground motion stations)located along the East Anatolian Fault(the seismogenic fault of the MW7.8 mainshock of the 2023 Türkiye earthquake doublet).The acceleration records were filtered and integrated to obtain the velocity and displacement time histories.We used the results of an on-site investigation,jointly conducted by China Earthquake Administration and Türkiye’s AFAD,to analyze the distribution of PGA,PGV,and PGD recorded by the strong motion array of the East Anatolian Fault.We found that the maximum horizontal PGA in this earthquake was 3.0 g,and the maximum co-seismic surface displacement caused by the East Anatolian Fault rupture was 6.50 m.As the fault rupture propagated southwest,the velocity pulse caused by the directional effect of the rupture increased gradually,with the maximum PGA reaching 162.3 cm/s.We also discussed the seismic safety of critical infrastructure projects traversing active faults,using two case studies of water supply pipelines in Türkiye that were damaged by earthquakes.We used a three-dimensional finite element model of the PE(polyethylene)water pipeline at the Islahiye State Hospital and fault displacement observations obtained through on-site investigation to analyze pipeline failure mechanisms.We further investigated the effect of the fault-crossing angle on seismic safety of a pipeline,based on our analysis and the failure performance of the large-diameter Thames Water pipeline during the 1999 Kocaeli earthquake.The seismic method of buried pipelines crossing the fault was summarized.展开更多
As an important part of nonstructural components,the seismic response of indoor water supply pipes deserves much attention.This paper presents shaking table test research on water supply pipes installed in a full-scal...As an important part of nonstructural components,the seismic response of indoor water supply pipes deserves much attention.This paper presents shaking table test research on water supply pipes installed in a full-scale reinforced concrete(RC)frame structure.Different material pipes and different methods for penetrating the reinforced concrete floors are combined to evaluate the difference in seismic performance.Floor response spectra and pipe acceleration amplification factors based on test data are discussed and compared with code provisions.A seismic fragility study of displacement demand is conducted based on numerical simulation.The acceleration response and displacement response of different combinations are compared.The results show that the combination of different pipe materials and different passing-through methods can cause obvious differences in the seismic response of indoor riser pipes.展开更多
This research project investigates the current status of water supply, sanitation, and hygiene practices in Munshiganj District, Bangladesh. Data collection involved a structured questionnaire and a reconnaissance sur...This research project investigates the current status of water supply, sanitation, and hygiene practices in Munshiganj District, Bangladesh. Data collection involved a structured questionnaire and a reconnaissance survey. Findings reveal that 30% of individuals rely on surface water (hand-tube wells, rivers, and ponds), prioritized as canal > river > pond, while 70% depend on groundwater (subterranean electric motor, deep tube-well). Drinking water is generally sufficient, with 95% reporting adequacy throughout the year. About 45% use hand tube-well water, 28% use deep tube-well water, and 11% use supply tap water for various purposes. Bathing trends include underground water through electric motor > pond > hand tube-well water > river, while for cooking, the order is underground water through electric motor > pond > hand tube-well water > river. Toilet water supply ranks as supply tap water > hand tube-well water > deep tube-well water. Although sanitation awareness is high, some lack knowledge of good hygiene practices. After defecating, handwashing methods include soap, ash, soil, or water. Children’s waste disposal varies, with some discarding it in open areas. Approximately 40% suffer from diseases like Diarrhoea due to unsafe water, primarily affecting children and elders. Training exists, but a significant portion lacks sanitation education. Dry skin or exposure to cold water may cause temporary irritation. Local government involvement in sanitation efforts is less active compared to non-governmental organizations. Results emphasize the need to enhance community awareness of safe water supplies and sanitation practices. .展开更多
The quality and safety of residents’water rely heavily on the design of municipal water supply and drainage pipes.Therefore,this paper aims to enhance the optimization of municipal water supply and drainage pipe desi...The quality and safety of residents’water rely heavily on the design of municipal water supply and drainage pipes.Therefore,this paper aims to enhance the optimization of municipal water supply and drainage pipe design by focusing on design requirements,principles,and key elements.Drawing from relevant design optimization experiences,technology advancements,and optimization measures,the research will analyze and consolidate the essential aspects of municipal water supply and drainage pipe design.The goal is to fundamentally elevate the quality standards of these designs,ensuring they meet the criteria for engineering project excellence.Through this comprehensive approach,we aim to contribute to the improvement and sustainability of water supply and drainage systems,safeguarding the well-being of residents.展开更多
With the acceleration of urbanization,the demand for water supply and drainage pipe networks has increased significantly.In the planning of urban construction,it is necessary to optimize the design of the water supply...With the acceleration of urbanization,the demand for water supply and drainage pipe networks has increased significantly.In the planning of urban construction,it is necessary to optimize the design of the water supply and drainage system pipe network to effectively save energy while providing residents with more accessible water resources.Therefore,the municipal water supply and drainage system and the water transmission methods should be designed according to the geographical conditions of the city.In this paper,we mainly analyze the design of municipal water supply and drainage systems and the selection of water transmission methods.Besides,the optimization of the water supply and drainage network zoning process and pipe network maintenance is also discussed,so as to provide a reference for municipal water supply and drainage work.展开更多
In this research, LINGO is used successfully to solve the water supply system′s optimal operation model. Firstly, the language of LINGO and the using method were studied intensively, on the basis of which the model w...In this research, LINGO is used successfully to solve the water supply system′s optimal operation model. Firstly, the language of LINGO and the using method were studied intensively, on the basis of which the model was transformed to LINGO form and solved successfully. Secondly, the research on the interface between LINGO and the popular office software was made. The optimization software was developed, which had Excel as the workspace and LINGO as the core of computation. Through practice, this software was found stable, easy to use and suitable for the application to the water supply corporations.展开更多
Due to pollution in second water supply system (SWSS),nine renovation alternative plans were proposed and com-prehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this...Due to pollution in second water supply system (SWSS),nine renovation alternative plans were proposed and com-prehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this paper. Comparisons of advantages and disadvantages among the plans of SWSS renovations provided solid foundation for selecting the most appro-priate plan for engineering projects. In addition,a mathematical model of the optimal combination of renovation plans has been set up and software Lingo was used to solve the model. As a case study,the paper analyzed 15 buildings in Tianjin City. After simulation of the SWSS renovation system,an optimal scheme was obtained,the result of which indicates that 10 out of those 15 buildings need be renovated in priority. The renovation plans selected for each building are the ones ranked higher in the com-prehensive analysis. The analysis revealed that the optimal scheme,compared with two other randomly calculated ones,increased the percentage of service population by 19.6% and 13.6% respectively,which significantly improved social and economical benefits.展开更多
In view of the poor water supply system’s network properties, the system’s complicated network hydraulic equations were replaced by macroscopic nodal pressure model and the model of relationship between supply flow ...In view of the poor water supply system’s network properties, the system’s complicated network hydraulic equations were replaced by macroscopic nodal pressure model and the model of relationship between supply flow and water source head. By using pump-station pressure head and initial tank water levels as decision variables, the model of optimal allocation of water supply between pump-sources was developed. Genetic algorithm was introduced to deal with the model of optimal allocation of water supply. Methods for handling each constraint condition were put forward, and overcome the shortcoming such as premature convergence of genetic algorithm; a solving method was brought forward in which genetic algorithm was combined with simulated annealing technology and self-adaptive crossover and mutation probabilities were adopted. An application example showed the feasibility of this algorithm.展开更多
The extensively built long-distance water transmission pipelines have become the main water sources for urban areas. To ensure the reliability and safety of the water supply, from the viewpoint of overall management, ...The extensively built long-distance water transmission pipelines have become the main water sources for urban areas. To ensure the reliability and safety of the water supply, from the viewpoint of overall management, it would be necessary to establish a system of information management for the pipeline. The monitoring, calculating and analyzing functions of the system serve to give controlling instructions and safe operating rules to the automatic equipment and technician, making sure the resistance coefficient distribution along the pipeline is reasonable; the hydraulic state transition is smooth when operating conditions change or water supply accidents occur, avoiding the damage of water hammer. This paper covered the composition structures of the information management system of long-distance water transmission pipelines and the functions of the subsystems, and finally elaborated on the approaches and steps of building a mathematics model for the analysis of dynamic hydraulic status.展开更多
This paper deals with the use of optimal control techniques in large-scale water distribution networks. According to the network characteristics and actual state of the water supply system in China, the implicit model...This paper deals with the use of optimal control techniques in large-scale water distribution networks. According to the network characteristics and actual state of the water supply system in China, the implicit model, which may be solved by utilizing the hierarchical optimization method, is established. In special, based on the analyses of the water supply system containing variable-speed pumps, a software tool has been developed successfully. The application of this model to the city of Shenyang (China) is compared to experiential strategy. The results of this study show that the developed model is a very promising optimization method to control the large-scale water supply systems.展开更多
It is very common to design water supply system to adjust runoff. Thus it will not meet the practical needs if only the hydrologic drought in natural basin is studied. In practice the natural water balance and water d...It is very common to design water supply system to adjust runoff. Thus it will not meet the practical needs if only the hydrologic drought in natural basin is studied. In practice the natural water balance and water deficits must be researched, i. e. . the adjusting effects of the water supply sys- tem such as a reservoir should be considered, and the drought event be distinguished according to the special system. The problem of drought identification under adjusted runoff was investigated in this study. By considering water transfer during different periods, a method to distinguish hydrologic drought for the water supply system was developed, and a standard drought severity index SWDSI was proposed. The method has been applied in Pan Jiakou water supply system in China. From 1953 to 1997,a total of 14 hydrologic droughts were identified in the water supply system, among which there were 3 severe droughts, 6 moderate droughts and 5 light droughts. The results are in good agreement with the historic drought records.展开更多
A district heating and hot water supply system is presented which synthetically utilizes geothermal energy,solar thermal energy and natural gas thermal energy.The multi-energy utilization system has been set at the ne...A district heating and hot water supply system is presented which synthetically utilizes geothermal energy,solar thermal energy and natural gas thermal energy.The multi-energy utilization system has been set at the new campus of Tianjin Polytechnic University(TPU),A couple of deep geothermal wells which are 2 300 m in depth were dug,Deep geothermal energy cascade utilization is achieved by two stages of plate heat exchangers(PHE) and two stages of water source heat pumps(WSHP).Shallow geothermal energy is used in assistant heating by two ground coupled heat pumps(GCHPs) with 580 vertical ground wells which are 120 m in depth.Solar thermal energy collected by vacuum tube arrays(VTAs) and geothermal energy are complementarily utilized to make domestic hot water.Superfluous solar energy can be stored in shallow soil for the GCHP utilization.The system can use fossil fuel thermal energy by two natural gas boilers(NGB) to assist in heating and making hot water.The heating energy efficiency was measured in the winter of 2010-2011.The coefficients of performance(COP) under different heating conditions are discussed.The performance of hot water production is tested in a local typical winter day and the solar thermal energy utilization factor is presented.The rusults show that the average system COP is 5.75 or 4.96 under different working conditions,and the typical solar energy utilization factor is 0.324.展开更多
This paper describes a household model of the rainwater harvesting system in residential development of Tlaquepaque Jalisco Mexico. Harvested rainwater is estimated for designing a rainwater catchment system which ref...This paper describes a household model of the rainwater harvesting system in residential development of Tlaquepaque Jalisco Mexico. Harvested rainwater is estimated for designing a rainwater catchment system which reflects the maximum water supply to a household.Based on the estimation of the harvested rainwater the total water demand is calculated in order to explore the possible uses of rainwater. Major components in the rainwater catchment system are as follows catchment area downspout roof drain pipe and first flush tank cistern infiltration well pumping station and filtering system and ultraviolet UV water treatment.The rainwater harvesting system is designed to operate as the part of the central water supply system.This paper exposes the process of design and construction and its cost.In this way it aims to establish a technical and conceptual reference which enables the citizens to design their rainwater systems and their construction. This model will produce an important experience that can help to improve the systems in a Mexican context.It can be also useful for the international community.展开更多
Dams for water supply usually represent an untapped hydroelectric potential. It is a small energetic potential, in most situations, usually requiring a particular solution to be viable. The use of pumps as power turbi...Dams for water supply usually represent an untapped hydroelectric potential. It is a small energetic potential, in most situations, usually requiring a particular solution to be viable. The use of pumps as power turbines often represents an alternative that enables the power generation in hydraulic structures already in operation, as is the case of dams in water supply systems. This potential can be exploited in conjunction with the implementation of PV modules on the water surface, installed on floating structures, both operating in a hydro PV hybrid system. The floating structure can also contribute to reducing the evaporation of water and providing a small increase in hydroelectric power available. This paper presents a pre-feasibility study for implementation of a hydroelectric power plant and PV modules on floating structures in the reservoir formed by the dam of Val de Serra, in southern Brazil. The dam is operated to provide drinking water to about 60% of the population of the city of Santa Maria, in the state of Rio Grande do Sul, in southern Brazil. The pre-feasibility study conducted with Homer software, version Legacy, indicated that the hydroelectric plant with a capacity of 227 kW can operate together with 60 kW of PV modules. This combination will result (in one of the configurations considered) in an initial cost of USD$ 1715.83 per kW installed and a cost of energy of USD$ 0.059/kWh.展开更多
Tailoring water supply to achieve confined heating has proven to be an effective strategy for boosting solar interfacial evaporation rates.However,because of salt clogging during desalination,a critical point of const...Tailoring water supply to achieve confined heating has proven to be an effective strategy for boosting solar interfacial evaporation rates.However,because of salt clogging during desalination,a critical point of constriction occurs when controlling the water rate for confined heating.In this study,we demonstrate a facile and scalable weaving technique for fabricating core-sheath photothermal yarns that facilitate controlled water supply for stable and efficient interracial solar desalination.The core-sheath yarn comprises modal fibers as the core and carbon fibers as the sheaths.Because of the core-sheath design,remarkable liquid pumping can be enabled in the carbon fiber bundle of the dispersed superhydrophilic modal fibers.Our woven fabrics absorb a high proportion(92%)of the electromagnetic radiation in the solar spectrum because of the weaving structure and the carbon fiber sheath.Under one-sun(1 kW·m^(-2))illumination,our woven fabric device can achieve the highest evaporation rate(of 2.12kg·m^(-2)·h^(-1) with energy conversion efficiency:93.7%)by regulating the number of core-sheath yarns.Practical application tests demonstrate that our device can maintain high and stable desalination performance in a 5 wt%NaCl solution.展开更多
At present,the leakage rate of the water distribution network in China is still high,and the waste of water resources caused by water distribution network leakage is quite serious every year.Therefore,the location of ...At present,the leakage rate of the water distribution network in China is still high,and the waste of water resources caused by water distribution network leakage is quite serious every year.Therefore,the location of pipeline leakage is of great significance for saving water resources and reducing economic losses.Acoustic emission technology is the most widely used pipeline leak location technology.The traditional non-stationary random signal de-noising method mainly relies on the estimation of noise parameters,ignoring periodic noise and components unrelated to pipeline leakage.Aiming at the above problems,this paper proposes a leak location method for water supply pipelines based on a multivariate variational mode decomposition algorithm.This method combines the two parameters of the energy loss coefficient and the correlation coefficient between adjacent modes,and adaptively determines the decomposition mode number K according to the characteristics of the signal itself.According to the correlation coefficient,the effective component is selected to reconstruct the signal and the cross-correlation time delay is estimated to determine the location of the pipeline leakage point.The experimental results show that this method has higher accuracy than the cross-correlation method based on VMD and the cross-correlation method based on EMD,and the average relative positioning error is less than 2.2%.展开更多
This paper introduces a non-iterative algorithmic procedure to design water utilization networks with multiple contaminants in process plants. According to the water pinch analysis rules, the processes in water utiliz...This paper introduces a non-iterative algorithmic procedure to design water utilization networks with multiple contaminants in process plants. According to the water pinch analysis rules, the processes in water utilization systems were first divided into three groups, then water-supply priority algorithm was proposed. The results of case studies showed that the water networks designed by this method gave water consumption lower than that estimated by other approaches. In addition, the procedure was subject to no limitation on the problem scale.展开更多
基金supported by the National Natural Science Foundation of China(Grants No.52179062 and 51879087).
文摘For a water supply system with long-distance diversion pipelines, in addition to the water hammer problems that occur beyond pumps, the safety of the water diversion pipeline in front of pumps also deserves attention. In this study, a water hammer protection scheme combined with an overflow surge tank and a regulating valve was developed. A mathematical model of the overflow surge tank was developed, and an analytical formula for the height of the overflow surge tank was derived. Furthermore, a practical water supply project was used to evaluate the feasibility of the combined protection scheme and analyze the sensitivity of valve regulation rules. The results showed that the combined protection scheme effectively reduced the height of the surge tank, lessened the difficulties related to construction, and reduced the necessary financial investment for the project. The two-stage closing rule articulated as fast first and then slow could minimize the overflow volume of the surge tank when the power failure occurred, while the two-stage opening rule articulated as slow first and then fast could be more conducive to the safety of the water supply system when the pump started up.
基金funded by the China National Key Research and Development Program(No.2022YFC3003505)the Fundamental Research Fund for the Central Public-interest Scientific Institutes(No.DQJB23Y01)+1 种基金the National Natural Science Foundation of China(No.52278540)the Fundamental Research Fund for the Central Public-interest Scientific Institutes(No.DQJB22B28).
文摘In 2023,two consecutive earthquakes exceeding a magnitude of 7 occurred in Türkiye,causing severe casualties and economic losses.The damage to critical urban infrastructure and building structures,including highways,railroads,and water supply pipelines,was particularly severe in areas where these structures intersected the seismogenic fault.Critical infrastructure projects that traverse active faults are susceptible to the influence of fault movement,pulse velocity,and ground motions.In this study,we used a unique approach to analyze the acceleration records obtained from the seismic station array(9 strong ground motion stations)located along the East Anatolian Fault(the seismogenic fault of the MW7.8 mainshock of the 2023 Türkiye earthquake doublet).The acceleration records were filtered and integrated to obtain the velocity and displacement time histories.We used the results of an on-site investigation,jointly conducted by China Earthquake Administration and Türkiye’s AFAD,to analyze the distribution of PGA,PGV,and PGD recorded by the strong motion array of the East Anatolian Fault.We found that the maximum horizontal PGA in this earthquake was 3.0 g,and the maximum co-seismic surface displacement caused by the East Anatolian Fault rupture was 6.50 m.As the fault rupture propagated southwest,the velocity pulse caused by the directional effect of the rupture increased gradually,with the maximum PGA reaching 162.3 cm/s.We also discussed the seismic safety of critical infrastructure projects traversing active faults,using two case studies of water supply pipelines in Türkiye that were damaged by earthquakes.We used a three-dimensional finite element model of the PE(polyethylene)water pipeline at the Islahiye State Hospital and fault displacement observations obtained through on-site investigation to analyze pipeline failure mechanisms.We further investigated the effect of the fault-crossing angle on seismic safety of a pipeline,based on our analysis and the failure performance of the large-diameter Thames Water pipeline during the 1999 Kocaeli earthquake.The seismic method of buried pipelines crossing the fault was summarized.
基金Scientific Research Fund of Institute of Engineering Mechanics,China Earthquake Administration under Grant Nos.2021EEEVL0204 and 2018A02。
文摘As an important part of nonstructural components,the seismic response of indoor water supply pipes deserves much attention.This paper presents shaking table test research on water supply pipes installed in a full-scale reinforced concrete(RC)frame structure.Different material pipes and different methods for penetrating the reinforced concrete floors are combined to evaluate the difference in seismic performance.Floor response spectra and pipe acceleration amplification factors based on test data are discussed and compared with code provisions.A seismic fragility study of displacement demand is conducted based on numerical simulation.The acceleration response and displacement response of different combinations are compared.The results show that the combination of different pipe materials and different passing-through methods can cause obvious differences in the seismic response of indoor riser pipes.
文摘This research project investigates the current status of water supply, sanitation, and hygiene practices in Munshiganj District, Bangladesh. Data collection involved a structured questionnaire and a reconnaissance survey. Findings reveal that 30% of individuals rely on surface water (hand-tube wells, rivers, and ponds), prioritized as canal > river > pond, while 70% depend on groundwater (subterranean electric motor, deep tube-well). Drinking water is generally sufficient, with 95% reporting adequacy throughout the year. About 45% use hand tube-well water, 28% use deep tube-well water, and 11% use supply tap water for various purposes. Bathing trends include underground water through electric motor > pond > hand tube-well water > river, while for cooking, the order is underground water through electric motor > pond > hand tube-well water > river. Toilet water supply ranks as supply tap water > hand tube-well water > deep tube-well water. Although sanitation awareness is high, some lack knowledge of good hygiene practices. After defecating, handwashing methods include soap, ash, soil, or water. Children’s waste disposal varies, with some discarding it in open areas. Approximately 40% suffer from diseases like Diarrhoea due to unsafe water, primarily affecting children and elders. Training exists, but a significant portion lacks sanitation education. Dry skin or exposure to cold water may cause temporary irritation. Local government involvement in sanitation efforts is less active compared to non-governmental organizations. Results emphasize the need to enhance community awareness of safe water supplies and sanitation practices. .
文摘The quality and safety of residents’water rely heavily on the design of municipal water supply and drainage pipes.Therefore,this paper aims to enhance the optimization of municipal water supply and drainage pipe design by focusing on design requirements,principles,and key elements.Drawing from relevant design optimization experiences,technology advancements,and optimization measures,the research will analyze and consolidate the essential aspects of municipal water supply and drainage pipe design.The goal is to fundamentally elevate the quality standards of these designs,ensuring they meet the criteria for engineering project excellence.Through this comprehensive approach,we aim to contribute to the improvement and sustainability of water supply and drainage systems,safeguarding the well-being of residents.
文摘With the acceleration of urbanization,the demand for water supply and drainage pipe networks has increased significantly.In the planning of urban construction,it is necessary to optimize the design of the water supply and drainage system pipe network to effectively save energy while providing residents with more accessible water resources.Therefore,the municipal water supply and drainage system and the water transmission methods should be designed according to the geographical conditions of the city.In this paper,we mainly analyze the design of municipal water supply and drainage systems and the selection of water transmission methods.Besides,the optimization of the water supply and drainage network zoning process and pipe network maintenance is also discussed,so as to provide a reference for municipal water supply and drainage work.
文摘In this research, LINGO is used successfully to solve the water supply system′s optimal operation model. Firstly, the language of LINGO and the using method were studied intensively, on the basis of which the model was transformed to LINGO form and solved successfully. Secondly, the research on the interface between LINGO and the popular office software was made. The optimization software was developed, which had Excel as the workspace and LINGO as the core of computation. Through practice, this software was found stable, easy to use and suitable for the application to the water supply corporations.
基金supported by National Natural Science Foundation of China(61233004,61221003,61374109,61104091,61304078,61473184)National Basic Research Program of China(973 Program)(2013CB035500)+2 种基金the International Cooperation Program of Shanghai Science and Technology Commission(12230709600)the Higher Education Research Fund for the Doctoral Program of China(20120073130006,20110073110018)the China Postdoctoral Science Foundation(2013M540364)
基金Project (No.033113111) supported by Tianjin Science Association Key Project,China
文摘Due to pollution in second water supply system (SWSS),nine renovation alternative plans were proposed and com-prehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this paper. Comparisons of advantages and disadvantages among the plans of SWSS renovations provided solid foundation for selecting the most appro-priate plan for engineering projects. In addition,a mathematical model of the optimal combination of renovation plans has been set up and software Lingo was used to solve the model. As a case study,the paper analyzed 15 buildings in Tianjin City. After simulation of the SWSS renovation system,an optimal scheme was obtained,the result of which indicates that 10 out of those 15 buildings need be renovated in priority. The renovation plans selected for each building are the ones ranked higher in the com-prehensive analysis. The analysis revealed that the optimal scheme,compared with two other randomly calculated ones,increased the percentage of service population by 19.6% and 13.6% respectively,which significantly improved social and economical benefits.
基金Project (No. 50078048) supported by the National Natural Science Foundation of China
文摘In view of the poor water supply system’s network properties, the system’s complicated network hydraulic equations were replaced by macroscopic nodal pressure model and the model of relationship between supply flow and water source head. By using pump-station pressure head and initial tank water levels as decision variables, the model of optimal allocation of water supply between pump-sources was developed. Genetic algorithm was introduced to deal with the model of optimal allocation of water supply. Methods for handling each constraint condition were put forward, and overcome the shortcoming such as premature convergence of genetic algorithm; a solving method was brought forward in which genetic algorithm was combined with simulated annealing technology and self-adaptive crossover and mutation probabilities were adopted. An application example showed the feasibility of this algorithm.
基金Hi-Tech Research and Development Program of China (863 Program)(2002AA601140)
文摘The extensively built long-distance water transmission pipelines have become the main water sources for urban areas. To ensure the reliability and safety of the water supply, from the viewpoint of overall management, it would be necessary to establish a system of information management for the pipeline. The monitoring, calculating and analyzing functions of the system serve to give controlling instructions and safe operating rules to the automatic equipment and technician, making sure the resistance coefficient distribution along the pipeline is reasonable; the hydraulic state transition is smooth when operating conditions change or water supply accidents occur, avoiding the damage of water hammer. This paper covered the composition structures of the information management system of long-distance water transmission pipelines and the functions of the subsystems, and finally elaborated on the approaches and steps of building a mathematics model for the analysis of dynamic hydraulic status.
基金This work has been partly funded by the National Natural Science Foundation of China(No.50078048).
文摘This paper deals with the use of optimal control techniques in large-scale water distribution networks. According to the network characteristics and actual state of the water supply system in China, the implicit model, which may be solved by utilizing the hierarchical optimization method, is established. In special, based on the analyses of the water supply system containing variable-speed pumps, a software tool has been developed successfully. The application of this model to the city of Shenyang (China) is compared to experiential strategy. The results of this study show that the developed model is a very promising optimization method to control the large-scale water supply systems.
基金Supported by National Natural Science Foundation of China ( No. 50579049) and Doctoral Special Foundationof China (No. 20040056060).
文摘It is very common to design water supply system to adjust runoff. Thus it will not meet the practical needs if only the hydrologic drought in natural basin is studied. In practice the natural water balance and water deficits must be researched, i. e. . the adjusting effects of the water supply sys- tem such as a reservoir should be considered, and the drought event be distinguished according to the special system. The problem of drought identification under adjusted runoff was investigated in this study. By considering water transfer during different periods, a method to distinguish hydrologic drought for the water supply system was developed, and a standard drought severity index SWDSI was proposed. The method has been applied in Pan Jiakou water supply system in China. From 1953 to 1997,a total of 14 hydrologic droughts were identified in the water supply system, among which there were 3 severe droughts, 6 moderate droughts and 5 light droughts. The results are in good agreement with the historic drought records.
基金Project(2010DFA72740-06) supported by International Science & Technology Cooperation Program of China
文摘A district heating and hot water supply system is presented which synthetically utilizes geothermal energy,solar thermal energy and natural gas thermal energy.The multi-energy utilization system has been set at the new campus of Tianjin Polytechnic University(TPU),A couple of deep geothermal wells which are 2 300 m in depth were dug,Deep geothermal energy cascade utilization is achieved by two stages of plate heat exchangers(PHE) and two stages of water source heat pumps(WSHP).Shallow geothermal energy is used in assistant heating by two ground coupled heat pumps(GCHPs) with 580 vertical ground wells which are 120 m in depth.Solar thermal energy collected by vacuum tube arrays(VTAs) and geothermal energy are complementarily utilized to make domestic hot water.Superfluous solar energy can be stored in shallow soil for the GCHP utilization.The system can use fossil fuel thermal energy by two natural gas boilers(NGB) to assist in heating and making hot water.The heating energy efficiency was measured in the winter of 2010-2011.The coefficients of performance(COP) under different heating conditions are discussed.The performance of hot water production is tested in a local typical winter day and the solar thermal energy utilization factor is presented.The rusults show that the average system COP is 5.75 or 4.96 under different working conditions,and the typical solar energy utilization factor is 0.324.
文摘This paper describes a household model of the rainwater harvesting system in residential development of Tlaquepaque Jalisco Mexico. Harvested rainwater is estimated for designing a rainwater catchment system which reflects the maximum water supply to a household.Based on the estimation of the harvested rainwater the total water demand is calculated in order to explore the possible uses of rainwater. Major components in the rainwater catchment system are as follows catchment area downspout roof drain pipe and first flush tank cistern infiltration well pumping station and filtering system and ultraviolet UV water treatment.The rainwater harvesting system is designed to operate as the part of the central water supply system.This paper exposes the process of design and construction and its cost.In this way it aims to establish a technical and conceptual reference which enables the citizens to design their rainwater systems and their construction. This model will produce an important experience that can help to improve the systems in a Mexican context.It can be also useful for the international community.
基金The authors wish to thank the institutions involved for their support to research activities related to renewable energy,which resulted,among other things,in this articleSpecifically,the third author would like to thank the partial financial support provided by CNPq through a support grant for research productivity.
文摘Dams for water supply usually represent an untapped hydroelectric potential. It is a small energetic potential, in most situations, usually requiring a particular solution to be viable. The use of pumps as power turbines often represents an alternative that enables the power generation in hydraulic structures already in operation, as is the case of dams in water supply systems. This potential can be exploited in conjunction with the implementation of PV modules on the water surface, installed on floating structures, both operating in a hydro PV hybrid system. The floating structure can also contribute to reducing the evaporation of water and providing a small increase in hydroelectric power available. This paper presents a pre-feasibility study for implementation of a hydroelectric power plant and PV modules on floating structures in the reservoir formed by the dam of Val de Serra, in southern Brazil. The dam is operated to provide drinking water to about 60% of the population of the city of Santa Maria, in the state of Rio Grande do Sul, in southern Brazil. The pre-feasibility study conducted with Homer software, version Legacy, indicated that the hydroelectric plant with a capacity of 227 kW can operate together with 60 kW of PV modules. This combination will result (in one of the configurations considered) in an initial cost of USD$ 1715.83 per kW installed and a cost of energy of USD$ 0.059/kWh.
基金financial support from the National Natural Science Foundation of China(52103064 and U21A2095)the Key Research and Development Program of Hubei Province(2021BAA068)National Local Joint Laboratory for Advanced Textile Processing and Clean Production(FX2022001)。
文摘Tailoring water supply to achieve confined heating has proven to be an effective strategy for boosting solar interfacial evaporation rates.However,because of salt clogging during desalination,a critical point of constriction occurs when controlling the water rate for confined heating.In this study,we demonstrate a facile and scalable weaving technique for fabricating core-sheath photothermal yarns that facilitate controlled water supply for stable and efficient interracial solar desalination.The core-sheath yarn comprises modal fibers as the core and carbon fibers as the sheaths.Because of the core-sheath design,remarkable liquid pumping can be enabled in the carbon fiber bundle of the dispersed superhydrophilic modal fibers.Our woven fabrics absorb a high proportion(92%)of the electromagnetic radiation in the solar spectrum because of the weaving structure and the carbon fiber sheath.Under one-sun(1 kW·m^(-2))illumination,our woven fabric device can achieve the highest evaporation rate(of 2.12kg·m^(-2)·h^(-1) with energy conversion efficiency:93.7%)by regulating the number of core-sheath yarns.Practical application tests demonstrate that our device can maintain high and stable desalination performance in a 5 wt%NaCl solution.
基金supported by the three funds:Industry-University-research Project of Anhui Jianzhu University HYB20210116National Key Research and Development Project of China No.2017YFC0704100(entitled New Generation Intelligent Building Platform Techniques)Research Project of Anhui Jianzhu University jy2021-c-017(Project Name:Research and Application ofWater Distribution Network Leakage Detection System Based on DMA Partition).
文摘At present,the leakage rate of the water distribution network in China is still high,and the waste of water resources caused by water distribution network leakage is quite serious every year.Therefore,the location of pipeline leakage is of great significance for saving water resources and reducing economic losses.Acoustic emission technology is the most widely used pipeline leak location technology.The traditional non-stationary random signal de-noising method mainly relies on the estimation of noise parameters,ignoring periodic noise and components unrelated to pipeline leakage.Aiming at the above problems,this paper proposes a leak location method for water supply pipelines based on a multivariate variational mode decomposition algorithm.This method combines the two parameters of the energy loss coefficient and the correlation coefficient between adjacent modes,and adaptively determines the decomposition mode number K according to the characteristics of the signal itself.According to the correlation coefficient,the effective component is selected to reconstruct the signal and the cross-correlation time delay is estimated to determine the location of the pipeline leakage point.The experimental results show that this method has higher accuracy than the cross-correlation method based on VMD and the cross-correlation method based on EMD,and the average relative positioning error is less than 2.2%.
文摘This paper introduces a non-iterative algorithmic procedure to design water utilization networks with multiple contaminants in process plants. According to the water pinch analysis rules, the processes in water utilization systems were first divided into three groups, then water-supply priority algorithm was proposed. The results of case studies showed that the water networks designed by this method gave water consumption lower than that estimated by other approaches. In addition, the procedure was subject to no limitation on the problem scale.