期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
CHINA CARRIES OUT ENTERPRISE BANKRUPTCY IN A PLANNED WAY
1
《China's Foreign Trade》 2002年第4期12-14,共3页
关键词 CHINA CARRIES OUT ENTERPRISE BANKRUPTCY IN A planNED way WTO
下载PDF
High Velocity Arc Spraying for Automotive Industry
2
作者 Tian Haoliang Xu Binshi +2 位作者 Wei Shicheng Chen Yongxiong Yi, Liu 《稀有金属材料与工程》 SCIE EI CAS CSCD 北大核心 2012年第S1期168-171,共4页
A diesel engine crankshaft is failed in journal and the dominant failure mechanism is wear.A 6R robot-based automatic high velocity arc spraying system was developed in this study.The remanufacturing process of engine... A diesel engine crankshaft is failed in journal and the dominant failure mechanism is wear.A 6R robot-based automatic high velocity arc spraying system was developed in this study.The remanufacturing process of engine crankshaft was designed based on the newly developed automatic spraying system and the FeAlNbB cored wire.The two spraying way planning were designed.The results of industrial application in miniature show that,both of the main shaft journal and the crank journal of the crankshaft can be deposited of coating in only one procedure using the developed automatic spraying technology,and a reliable quality remanufactured part was obtained.A comparative evaluation shows that the improvement process offers several benefits.Such as,the coating bond strength and spray rates are all highly increased;the remanufactured cost and time are decreased.Furthermore,this technology has several advantages such as energy and material saving,and environmental protecting,a wide application foreground for this technology is therefore performed. 展开更多
关键词 high velocity arc SPRAYING FILLET RADIUS STATES BOND strength way plan process BENEFITS
原文传递
实施名牌战略促进企业发展
3
作者 王保佳 齐俊峰 《前沿》 1995年第12期49-49,共1页
实施名牌战略促进企业发展王保佳,齐俊峰通过学习和大讨论,我们认识到,必须稳定和提高产品质量,才能在激烈的市场竞争中立不败之地。我厂把今年定为“95质量年”,通过抓质量提高了原辅材料的供应质量,提高了设备有效利用率和科... 实施名牌战略促进企业发展王保佳,齐俊峰通过学习和大讨论,我们认识到,必须稳定和提高产品质量,才能在激烈的市场竞争中立不败之地。我厂把今年定为“95质量年”,通过抓质量提高了原辅材料的供应质量,提高了设备有效利用率和科室服务质量,降低了消耗指标,也提高... 展开更多
关键词 :MRP(material requirement planning) JIT(just in time) TOC(theory of con-straints) wayS of planning wayS of controlling mechanisms and functions
原文传递
开发新产品项目贷款的调查分析
4
作者 张林斌 《前沿》 1995年第8期63-64,共2页
开发新产品项目贷款的调查分析张林斌近年来,随着改革的不断深入,根河市在开发新产品,引进新项目方面做了大量的工作。但终因经验不足,项目前期工作不够深入,可行性调查论证不充分等原因,给这项工作带来了很大的盲目性。在调查根... 开发新产品项目贷款的调查分析张林斌近年来,随着改革的不断深入,根河市在开发新产品,引进新项目方面做了大量的工作。但终因经验不足,项目前期工作不够深入,可行性调查论证不充分等原因,给这项工作带来了很大的盲目性。在调查根河市自1985年以来的64个开发引... 展开更多
关键词 :MRP(material requirement planning) JIT(just in time) TOC(theory of con-straints) wayS of planning wayS of controlling mechanisms and functions
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部