This paper describes the planned power transmission from west to east through three channels. It presents the main characteristics of these three channels and the problems need to be solved.
On August 20, 2002, the construction-starting ceremonies of the north-channel projects for sending power from west to east were solemnly held at one main meeting place and five sub-meeting places simultaneously. The n...On August 20, 2002, the construction-starting ceremonies of the north-channel projects for sending power from west to east were solemnly held at one main meeting place and five sub-meeting places simultaneously. The north-channel projects for sending power from west to east started to construct this time include three transmission and substation projects and four power source projects. This paper makes a brief introduction to the seven projects.展开更多
This paper analyzes the power markets both in northwest sending end and, east receiving ends, points out the favorable and unfavorable conditions for power development In, the northwest area, brings forward,the develo...This paper analyzes the power markets both in northwest sending end and, east receiving ends, points out the favorable and unfavorable conditions for power development In, the northwest area, brings forward,the development planning of power sources and power network constructions, and presents the benefit estimation of sending power from northwest to east.展开更多
This paper introduces the current situation of China power industry and interconnection, the necessity to develop interconnection, the principle of nationwide interconnection and the key technologies to be studiedincl...This paper introduces the current situation of China power industry and interconnection, the necessity to develop interconnection, the principle of nationwide interconnection and the key technologies to be studiedinclude HVDC and FACTS. The paper also discusses thefeasibility of 750 kV to be used in the northwest.regionand to speed up research and development of nighervoltage level in other regions of China, as well as scl-ence and technical innovation for transmission and dis-tribution projects.展开更多
文摘This paper describes the planned power transmission from west to east through three channels. It presents the main characteristics of these three channels and the problems need to be solved.
文摘On August 20, 2002, the construction-starting ceremonies of the north-channel projects for sending power from west to east were solemnly held at one main meeting place and five sub-meeting places simultaneously. The north-channel projects for sending power from west to east started to construct this time include three transmission and substation projects and four power source projects. This paper makes a brief introduction to the seven projects.
文摘This paper analyzes the power markets both in northwest sending end and, east receiving ends, points out the favorable and unfavorable conditions for power development In, the northwest area, brings forward,the development planning of power sources and power network constructions, and presents the benefit estimation of sending power from northwest to east.
文摘This paper introduces the current situation of China power industry and interconnection, the necessity to develop interconnection, the principle of nationwide interconnection and the key technologies to be studiedinclude HVDC and FACTS. The paper also discusses thefeasibility of 750 kV to be used in the northwest.regionand to speed up research and development of nighervoltage level in other regions of China, as well as scl-ence and technical innovation for transmission and dis-tribution projects.