Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home a...Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home and abroad were introduced.Moreover,the problems existing in the on-line monitoring of electromagnetic environment were expounded,and the development prospect was forecasted.展开更多
Based on the experience of environmental acceptance tests for power transmission projects, the problems found in acceptance tests and the system shortcomings of acceptance test itself are analyzed. Recommendations are...Based on the experience of environmental acceptance tests for power transmission projects, the problems found in acceptance tests and the system shortcomings of acceptance test itself are analyzed. Recommendations are provided to improve the future work.展开更多
Holding the greatest power transmission capacity in China, Three Gorges power transmission and substation (T&S) project is an important landmark in the
In the research, problems and damages of soil erosions in West -East Natural Gas Transmission were analyzed; the reasons were summarized and the characteristics of soil erosion were researched in order to explore prin...In the research, problems and damages of soil erosions in West -East Natural Gas Transmission were analyzed; the reasons were summarized and the characteristics of soil erosion were researched in order to explore principles of pipeline prevention and seek countermeasures.展开更多
基金Supported by the Open Project of Jiangsu Key Laboratory of Environmental Engineering(ZX2017005)
文摘Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home and abroad were introduced.Moreover,the problems existing in the on-line monitoring of electromagnetic environment were expounded,and the development prospect was forecasted.
文摘Based on the experience of environmental acceptance tests for power transmission projects, the problems found in acceptance tests and the system shortcomings of acceptance test itself are analyzed. Recommendations are provided to improve the future work.
文摘Holding the greatest power transmission capacity in China, Three Gorges power transmission and substation (T&S) project is an important landmark in the
基金Supported by Scientific Research Program of Water Resources Department of the Xinjiang Uygur Autonomous Region (xjsl-2011-11)Young Core Project of Northwest A&F University (KZCXI-10-4-1)~~
文摘In the research, problems and damages of soil erosions in West -East Natural Gas Transmission were analyzed; the reasons were summarized and the characteristics of soil erosion were researched in order to explore principles of pipeline prevention and seek countermeasures.