When fault occurs on cross-coupling autotransformer(AT)power supply traction network,the up-line and down-line feeder circuit breakers in the traction substation trip at the same time without selectivity,which leads t...When fault occurs on cross-coupling autotransformer(AT)power supply traction network,the up-line and down-line feeder circuit breakers in the traction substation trip at the same time without selectivity,which leads to an extended power failure.Based on equivalent circuit and Kirchhoff’s current law,the feeder current characteristic in the substation,AT station and sectioning post when T-R fault,F-R fault,and T-F fault occur are analyzed and their expressions are obtained.When the traction power supply system is equipped with wide-area protection measurement and control system,the feeder protection device in each station collects the feeder currents in other two stations through the wide-area protection channel and a wide-area current differential protection scheme based on the feeder current characteristic is proposed.When a short-circuit fault occurs in the power supply arm,all the feeder protection devices in each station receive the feeder currents with time stamp in other two stations.After data synchronous processing and logic judgment,the fault line of the power supply arm can be identified and isolated quickly.The simulation result based on MATLAB/Simulink shows that the power supply arm protection scheme based on wide-area current differential has good fault discrimination ability under different fault positions,transition resistances,and fault types.The verification of measured data shows that the novel protection scheme will not be affected by the special working conditions of the electrical multiple unit(EMU),and reliability,selectivity,and rapidity of relay protection are all improved.展开更多
The article discusses the possibility of further modernization of the standard microprocessor relay protection of AC overhead system feeders DPA-27.5-TNF, which is operated on the Trans-Baikal Railway by creating an a...The article discusses the possibility of further modernization of the standard microprocessor relay protection of AC overhead system feeders DPA-27.5-TNF, which is operated on the Trans-Baikal Railway by creating an additional automated system of unified templates necessary for the occurrence of “trainability” elements. The templates will be formed via a separate dedicated channel for transmission, processing and storage of the necessary information, not related to the operation of the terminal, with its subsequent visualization at the workplace of the duty personnel of traction substations, together with information from the “GID” software received via another dedicated wired channel. With the help of such a base of unified preset templates, in the future, it will be possible not only to identify the specific causes of each emergency shutdown but also to reduce their number by dynamically adjusting the existing presets of the standard operation algorithm.展开更多
The article discusses the possibility of a potential reduction in the number of operations of microprocessor relay protection of feeders of the contact network of AC railways TsZA-27.5-FKS (FTS) for unknown reasons. R...The article discusses the possibility of a potential reduction in the number of operations of microprocessor relay protection of feeders of the contact network of AC railways TsZA-27.5-FKS (FTS) for unknown reasons. Real statistics on the number of microprocessor relay protection operations at the Buryatskaya traction substation are presented, simulation of the real train situation (in accordance with the regime maps of the throughput capacity of the sections of the Trans-Baikal railway) was carried out in the specialized software complex “KORTES”. Based on the results of the analysis of simulation modeling, the process of forming a unified template of settings using neural network technologies is considered, which characterizes only this specific regular train situation. To protect objects in the event of pre-emergency and emergency modes of operation of the traction power supply system, a variant of changing the standard operation algorithm of the TsZA-27.5-FKS (FTS) terminal by introducing additional blocks for calculating the predictive functions of current and voltage has been proposed.展开更多
基金supported by the Natural Science Foundation of Sichuan Province(No.2022NSFSC0405).
文摘When fault occurs on cross-coupling autotransformer(AT)power supply traction network,the up-line and down-line feeder circuit breakers in the traction substation trip at the same time without selectivity,which leads to an extended power failure.Based on equivalent circuit and Kirchhoff’s current law,the feeder current characteristic in the substation,AT station and sectioning post when T-R fault,F-R fault,and T-F fault occur are analyzed and their expressions are obtained.When the traction power supply system is equipped with wide-area protection measurement and control system,the feeder protection device in each station collects the feeder currents in other two stations through the wide-area protection channel and a wide-area current differential protection scheme based on the feeder current characteristic is proposed.When a short-circuit fault occurs in the power supply arm,all the feeder protection devices in each station receive the feeder currents with time stamp in other two stations.After data synchronous processing and logic judgment,the fault line of the power supply arm can be identified and isolated quickly.The simulation result based on MATLAB/Simulink shows that the power supply arm protection scheme based on wide-area current differential has good fault discrimination ability under different fault positions,transition resistances,and fault types.The verification of measured data shows that the novel protection scheme will not be affected by the special working conditions of the electrical multiple unit(EMU),and reliability,selectivity,and rapidity of relay protection are all improved.
文摘The article discusses the possibility of further modernization of the standard microprocessor relay protection of AC overhead system feeders DPA-27.5-TNF, which is operated on the Trans-Baikal Railway by creating an additional automated system of unified templates necessary for the occurrence of “trainability” elements. The templates will be formed via a separate dedicated channel for transmission, processing and storage of the necessary information, not related to the operation of the terminal, with its subsequent visualization at the workplace of the duty personnel of traction substations, together with information from the “GID” software received via another dedicated wired channel. With the help of such a base of unified preset templates, in the future, it will be possible not only to identify the specific causes of each emergency shutdown but also to reduce their number by dynamically adjusting the existing presets of the standard operation algorithm.
文摘The article discusses the possibility of a potential reduction in the number of operations of microprocessor relay protection of feeders of the contact network of AC railways TsZA-27.5-FKS (FTS) for unknown reasons. Real statistics on the number of microprocessor relay protection operations at the Buryatskaya traction substation are presented, simulation of the real train situation (in accordance with the regime maps of the throughput capacity of the sections of the Trans-Baikal railway) was carried out in the specialized software complex “KORTES”. Based on the results of the analysis of simulation modeling, the process of forming a unified template of settings using neural network technologies is considered, which characterizes only this specific regular train situation. To protect objects in the event of pre-emergency and emergency modes of operation of the traction power supply system, a variant of changing the standard operation algorithm of the TsZA-27.5-FKS (FTS) terminal by introducing additional blocks for calculating the predictive functions of current and voltage has been proposed.