In view of the stress concentration problem left by the joint coal seams mining since the reservation of the coal pillar, it was proposed that non-pillar mining technology be used in Dongrong No.2 coal mine. The numer...In view of the stress concentration problem left by the joint coal seams mining since the reservation of the coal pillar, it was proposed that non-pillar mining technology be used in Dongrong No.2 coal mine. The numerical simulation software FLAG2D was used to draw the relationship between surrounding rock deformation of roadway driving along next goaf and the size of the coal pillar, so the safety and suitable position of roadway was determined. The distribution of lateral abutment pressure was measured by using the ZYJ-30 drilling stress gauge in the coal wall. The conclusions of the numerical simulation were verified.展开更多
文摘In view of the stress concentration problem left by the joint coal seams mining since the reservation of the coal pillar, it was proposed that non-pillar mining technology be used in Dongrong No.2 coal mine. The numerical simulation software FLAG2D was used to draw the relationship between surrounding rock deformation of roadway driving along next goaf and the size of the coal pillar, so the safety and suitable position of roadway was determined. The distribution of lateral abutment pressure was measured by using the ZYJ-30 drilling stress gauge in the coal wall. The conclusions of the numerical simulation were verified.