期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
China's Wind Power Development in 2008
1
作者 Jiang Liping State Grid Beijing Economic and Technology Research Institute Li Jialu 《Electricity》 2009年第2期52-55,共4页
This paper summarizes the basic situation of the wind power development in China in 2008,and carries out a brief analysis of the proportion of the nationwide wind power to the global wind sector as well as to the tota... This paper summarizes the basic situation of the wind power development in China in 2008,and carries out a brief analysis of the proportion of the nationwide wind power to the global wind sector as well as to the total installed capacity in the country. By reviewing the remarkable achievements in China's wind power development since the enforcement of the Renewable Energy Act of the People's Republic of China,some issues concerning the policy effect and wind power development are touched on. 展开更多
关键词 wind China’s wind power development in 2008
下载PDF
Validation of Full-Converter Wind Power Plant Generic Model Based on Actual Fault Ride-Through Measurements
2
作者 O. Tsernobrovkin A. Perdana +1 位作者 I. Palu J. Kilter 《Journal of Energy and Power Engineering》 2010年第4期54-62,共9页
Modeling and validation of full power converter wind turbine models with field measurement data are rarely reported in papers. In this paper an aggregated generic dynamic model of the wind farm consisting of full powe... Modeling and validation of full power converter wind turbine models with field measurement data are rarely reported in papers. In this paper an aggregated generic dynamic model of the wind farm consisting of full power converter wind turbines is composed and the model validation based on actual field measurements is performed. The paper is based on the measurements obtained from the real short circuit test applied to connection point of observed wind farm. The presented approach for validating the composed model and fault ride-through (FRT) capability for the whole wind park is unique in overall practice and its significance and importance is described and analyzed. 展开更多
关键词 Real short-circuit test full converter wind turbine modeling model validation generic model fault ride-through (FRT) wind power development security of supply power system stability.
下载PDF
China's Wind Power in Rapid Progressing 被引量:1
3
作者 本刊编辑部 《Electricity》 2001年第2期42-45,共4页
China’s wind power has gone through an exploring course of 20 years. At present, it is on the fast track under the support of the state’s preferential policies concerned. The various wind power development areas in ... China’s wind power has gone through an exploring course of 20 years. At present, it is on the fast track under the support of the state’s preferential policies concerned. The various wind power development areas in China have made rapid progress and put forward their own thinking of developing wind energy. 展开更多
关键词 wind power present situation and prospects development mode policies of wind power
下载PDF
东北地区风能资源开发与风电产业发展 被引量:11
4
作者 张蔷 《资源科学》 CSSCI CSCD 北大核心 2008年第6期896-904,共9页
东北地区是我国重要工业基地,也是风能资源非常丰富的地区,风能资源开发利用与风能产业发展在全国占据重要的战略地位。本文在对东北地区风能资源储量、开发利用价值、开发利用现状与存在问题分析的基础上,提出了风能资源开发与风电产... 东北地区是我国重要工业基地,也是风能资源非常丰富的地区,风能资源开发利用与风能产业发展在全国占据重要的战略地位。本文在对东北地区风能资源储量、开发利用价值、开发利用现状与存在问题分析的基础上,提出了风能资源开发与风电产业发展目标与对策。研究表明,东北地区风能资源开发利用价值大,风电产业发展迅速,但风能资源与风电产业匹配程度低,风电场建设规模普遍偏小,规划目标偏低,大型风力发电机国产化程度低。针对这些问题,文章提出了科学的风电产业发展目标,预测到2020年东北地区风电装机容量将达到1 120×104kW,将建成辽中南及辽东半岛风电产业基地、吉西白城—松原风电产业基地和黑龙江东部风电产业基地。实现上述目标,建议提升风能资源开发在振兴东北老工业基地中的战略地位与作用,加大投入,摸清风能资源家底,制定科学规划,扩大风电装机容量,以多元化投资推动东北地区风电产业实现跨越式发展。 展开更多
关键词 风能资源 开发现状 风电产业 发展对策 东北地区
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部