This study investigates relationships between congestion and travel time performance metrics and crashes on road segments. The study focuses on work zone routes in Iowa, utilizing 2021 commercially-available probe veh...This study investigates relationships between congestion and travel time performance metrics and crashes on road segments. The study focuses on work zone routes in Iowa, utilizing 2021 commercially-available probe vehicle data and crash data. Travel time performance metrics were derived from the probe vehicle data, and crash counts were obtained from the crash data. Additional variables included road characteristics (traffic volume, road type, segment length) and a categorical variable for the presence of a work zone. A mixed effect linear regression model was employed to identify relationships between road segment crash counts and the selected performance metrics. This was accomplished for two sets of models that include congestion performance measures at different defining threshold values, along with travel time performance measures. The study results indicate that the congestion indicators, certain travel time performance measures, and traffic counts were statistically significant and positively correlated with crash counts. Indicator variables for rural interstate locations and non-active work zones have a stronger influence on crash count than those for municipal interstate locations and active work zones. These findings can inform decision-makers on work zone safety strategies and crash mitigation planning, especially in high traffic volume areas prone to congestion and queues.展开更多
The presence of work zones due to pavement repair and rehabilitation is very common in highway facilities. Lane closures associated with work zones result in capacity reduction, which, in turn, often leads to increase...The presence of work zones due to pavement repair and rehabilitation is very common in highway facilities. Lane closures associated with work zones result in capacity reduction, which, in turn, often leads to increased congestion at such locations. This paper documents findings from a study that investigated the performance of freeway facilities in the presence of work zones under various Temporary Traffic Control (TTC) and lane closure scenarios while taking under consideration traffic composition and driving behaviors. The study site was an approximately 10-mile freeway segment of Interstate 65 (I-65) located in Birmingham, AL. The testbed was coded in PTV VISSIM, a microscopic simulation analysis platform, for: 1) baseline conditions (i.e., no work zone presence) and 2) work zone conditions with single lane closure (i.e., 3-to-2 lane closure). Work zone scenarios were coded for two TTC strategies, namely, early merge and late merge control and for three different positions of the lane closure (i.e., left, right, and center lane closures). The length of the work zones varied from 1000 to 2000, and 3000 ft. Sensitivity analysis was performed to document the operational impacts of varying heavy vehicle percentages, changes in drivers’ aggressiveness, and projected traffic demand changes. The impacts were quantified using linked-based measures of effectiveness (MOEs) such as travel time, and travel time index. The study results show that there is no significant change in travel time index due to the variation of work zone length across the study corridor. Under similar traffic control and demand conditions, a center lane closure consistently results in significantly higher travel time index than a left or right lane closure and should be avoided. Consideration of operational impacts of changes in truck percentage indicates that the corridor can absorb an increase in truck percentage from 10% to 15%, while performance rapidly deteriorates when a higher percentage of trucks is present in the traffic stream. The study findings can be used to guide transportation agencies in their future efforts to develop strategic lane closure plans that minimize congestion.展开更多
Work zone safety continues to be one of the important focus areas for transportation agencies. Previous studies have identified that vehicle speed and lighting conditions are significant risk factors impacting work zo...Work zone safety continues to be one of the important focus areas for transportation agencies. Previous studies have identified that vehicle speed and lighting conditions are significant risk factors impacting work zone safety. </span><span style="font-family:Verdana;">This study evaluated the impact of the use of presence lighting and digital </span><span style="font-family:Verdana;">speed limit trailers on nighttime motorist speeds using commercially available connected vehicle speed data. Geospatial analysis was conducted on over 500,000 connected vehicle records to linear reference nearly 18,000 records from 195 unique trajectories to study section during the study period of 2 days. Results showed that median speeds reduced by 4 to 13 mph from 11PM to 7AM during the deployment of presence lighting and speed limit trailers </span><span style="font-family:Verdana;">compared to base conditions. A Kolmogorov-Smirnov (KS) statistical test</span><span style="font-family:Verdana;"> com</span><span style="font-family:Verdana;">paring 105 vehicles traveling through the construction zone with presence</span><span style="font-family:Verdana;"> lighting and speed limit trailers with a group of 90 vehicles during base condition indicated the speeds during the deployment of presence lighting and speed limit trailers were lower than the base condition. Also, increased compliance with the 55 mph speed limit was observed when the presence lighting and digital speed limit trailers were deployed. However, there were two hours (3AM to 5AM) where speeds increased by 0</span></span><span style="font-family:""> </span><span style="font-family:Verdana;">-</span><span style="font-family:""> </span><span style="font-family:Verdana;">4 mph, perhaps due to the low volume at that hour. The encouraging results support the further deployment of presence lighting and speed limit trailers in nighttime construction zones for reducing vehicle speeds. Those future deployments should be monitored with connected vehicle speeds to collect additional data to broaden the evaluation of these speed mitigation techniques over a diverse set of construction zone activities.展开更多
Maintenance and rehabilitation projects of interstate facilities typically mandate lane closures. Lane closures require merging maneuvers that often result in reduced speeds and traffic bottlenecks. Work zone impacts ...Maintenance and rehabilitation projects of interstate facilities typically mandate lane closures. Lane closures require merging maneuvers that often result in reduced speeds and traffic bottlenecks. Work zone impacts on traffic operations are magnified when project durations are extended. Conventionally, work zone traffic control plans are developed to address work zone impacts. This study evaluated various merge control strategies at interstate work zones peak and off-peak traffic conditions and summarized related impacts. A comprehensive microscopic simulation model was developed in full consideration of driver/vehicle behavior at work zones. The analysis of simulation results revealed that merge control strategies, when implemented during peak and off-peak conditions, can preserve the level of service and provide favorable mobility, safety, and environmental impacts. In addition, results indicate that transportation agencies’ practice of scheduling work zone activities during the off-peak may not be the most optimum approach. Overall, the findings of this study highlight the need for evaluation of work zone scheduling practices in full consideration of agency, user, and project costs.展开更多
A smartphone warning system is a feasible option to notify motorists about a safety threat and/or pedestrian crossings ahead. In this paper, a smartphone-based warning system was proposed to enhance workers’ safety i...A smartphone warning system is a feasible option to notify motorists about a safety threat and/or pedestrian crossings ahead. In this paper, a smartphone-based warning system was proposed to enhance workers’ safety in work zones. Three different warning message systems, including sound, male voice and female voice, were designed to alert drivers. Twenty-four subjects were recruited for a total of ninety-six rounds driving simulator test in a work zone to investigate the impacts of smartphone-based warning messages on subjects’ driving performance, in terms of driving speed, speed variation, acceleration, and brake reaction distance. The outcome showed that, with the assistance of the sound and voice (either female or male) warning messages, drivers could effectively reduce their accelerations and speeds. Meanwhile, such a warning system can induce subjects to shorten their brake reaction distances for worker crossings. All participants found that this warning system is applicable to enhance their defensive driving behaviors while driving through a work zone.展开更多
The autonomous vehicles are the future of mobility across the globe and are expected to touch the lives of every person of all ages. But this comes with certain challenges regarding safety, reliability, cost, legal fr...The autonomous vehicles are the future of mobility across the globe and are expected to touch the lives of every person of all ages. But this comes with certain challenges regarding safety, reliability, cost, legal framework, regulations, etc. however, of all the concern safety and reliability are of utmost importance for researchers and engineers. The current research is focused on the movement of the autonomous vehicle in the work zone. The work zone is one of the most challenging areas for the autonomous vehicle to drive from. This is because the work zones are very dynamic, and all the construction activities are specific to the site condition and cannot always be predefined. The study provides a concept of how pavement marking can be used for smooth <span style="font-family:Verdana;">movement through the complicated work zone. In this study, various pav</span><span style="font-family:Verdana;">ement marking signs have been designed as a concept considering the standard colors and striping width being used in the Manual of Uniform Traffic control device (MUTCD). The study assumes that the movement of the autonomous vehicle will not be exclusive and that it will move with the driver driven vehicle. It is expected that autonomous vehicles will require special pavement marking and signage for smooth movement through the work zone. These pavement marking and signage will eventually become part of standard Traffic Control Plans (TCP) and Maintenance of Traffic Plans (MOT). The research aims to study the current research being done in this area and technology being used for detecting various pavement markings and signages.</span>展开更多
Annually, there are over 120,000 crashes in work zones in the United States. High speeds in construction zones are a well-documented risk factor that increases <span style="font-family:Verdana;"><sp...Annually, there are over 120,000 crashes in work zones in the United States. High speeds in construction zones are a well-documented risk factor that increases <span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">the </span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">frequency and severity of crashes. This study used connected vehicle data to evaluate the spatial and temporal impact that regulatory signs, speed feedback displays, and construction site geometry had on vehicle speed. Over 27,000 unique trips over 2 weeks on a 15-mile interstate construction work zone near Lebanon, IN were analyzed. Spatial analysis over a 0.2-mi segment before and after the posted speed limit signs showed that the regulatory signs had no statistical impact on reducing speeds. A before/after analysis was also conducted to study the impact of radar-based speed feedback that displays the motorists</span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">’</span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"> speed on a sign below a regulatory speed limit sign. Results showed a maximum drop in median speeds of approximately 5 mph. Speeds greater than 15 mph above the speed limit dropped by 10%</span></span></span></span></span><span><span><span><span><span style="font-family:;" "=""> </span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">-</span></span></span></span></span><span><span><span><span><span style="font-family:;" "=""> </span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">15%. The reduction in speeds began approximately 1000 feet ahead of the sign and results were found to be statistically significant. </span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">The </span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">analysis also revealed that larger speed drops inside the work zone were due to geometric constraints that required additional driver workloads, especially during shoulder width changes and lane shifts. The results from this study will be helpful for agencies to understand driver behavior in the work zones and to identify proper speed limit compliance techniques that significantly reduce driver speeds in and around work zones.</span></span></span></span></span>展开更多
An iterative process,combining a macroscopic simulator and a set of the traffic demand-change estimation models,is developed to estimate the traffic demand at work zones in urban freeway corridors.The process is desig...An iterative process,combining a macroscopic simulator and a set of the traffic demand-change estimation models,is developed to estimate the traffic demand at work zones in urban freeway corridors.The process is designed to capture the interaction between work-zone conditions and traffic diversion in determining the traffic demand approaching the entrance and exit ramps at a given work zone.The proposed models and process were calibrated and tested with the field data from the work zones in the Minnesota metro-freeway network.The test results indicate promising possibilities of the proposed process in terms of the estimation accuracy and transferability of the demand-change estimation models developed in this study.展开更多
Objective:To provide anatomical datum for intrusive operations of lumbar intervertebral foramen,especially that using acupuncture-knife as intrusive tool.Methods:To dissect 10 antisepsis cadavers and observe the expos...Objective:To provide anatomical datum for intrusive operations of lumbar intervertebral foramen,especially that using acupuncture-knife as intrusive tool.Methods:To dissect 10 antisepsis cadavers and observe the exposed blood vessels,ligaments,nerves and their adjacent relations in L1/2~L5/S1intervertebral foramen.Results:Lumbar intervertebral foramen exit zones were almost sealed by nerves and blood vessels.There were two zones with relatively no blood vessel and nerve(triangular working zones)located in the midpoint of the distance between two adjacent roots of transverse processus,and clung to lamina of vertebral arch,and they were also found upon the margo superior of the root of transverse processus,but the ascending lumbar vein or(and)the rami anastomoticus between the remi inferior of intervertebral vein and lumbar veins were observed in 12%triangular working zones upon the margo superior of root of transverse processus.Conclusions:"Triangular working zone"was relatively avascular zone.Pay attention to the possibilty of presence of blood vessels on the entrance passage of intrusive operations on lumbar side rear.The needlepoint should be pierced at the midpoint of the distance between two adjacent roots of transverse processus and cling to the outer edge of lamina of vertebral arch when doing the foraminal lumbar puncture.As lumbar intervertebral foramina exit zone was almost sealed by nerves and blood vessels,blind incising and debonding with acupuncture-knife in this area was relatively much more dangerous.展开更多
Road maintenance work brings costs to the government and delays to users. The setting up of work zones often leads to severe congestion during peak hours, especially in busy urban areas. A road maintenance delay model...Road maintenance work brings costs to the government and delays to users. The setting up of work zones often leads to severe congestion during peak hours, especially in busy urban areas. A road maintenance delay model is presented here that includes consideration of excessive traffic flow and non-motorists. Atrial-and-error method is used to find the optimal work zone length and the best work starting time to minimize the total cost of maintenance and delays. A numerical example with a sensitivity analysis is also given. The results show that optimal starting time is not sensitive to the flow speed and the increase of work zone speeds sharply reduces the total cost when the road is congested.展开更多
To accurately assess the safety of freeway work zones, this paper investigates the safety of vehicle lane change maneuvers with improved cellular automata model. Taking the traffic conflict and standard deviation of o...To accurately assess the safety of freeway work zones, this paper investigates the safety of vehicle lane change maneuvers with improved cellular automata model. Taking the traffic conflict and standard deviation of operating speed as the evaluation indexes, the study evaluates the freeway work zone safety. With improved deceleration probability in car-following rules and the addition of lanechanging rules under critical state, the lane-changing behavior under critical state is defined as a conflict count. Through 72 schemes of simulation runs, the possible states of the traffic flow are carefully studied. The results show that under the condition of constant saturation traffic conflict count and vehicle speed standard deviation reach their maximums when the mixed rate of heave vehicles is 40%. Meanwhile, in the case of constant heavy vehicles mix, traffic conflict count and vehicle speed standard deviation reach maximum values when saturation rate is 0.75. Integrating all simulation results, it is known the traffic safety in freeway work zones is classified into four levels: safe, relatively safe, relatively dangerous, and dangerous.展开更多
Highway maintenance, often requiring lane closure, is very expensive in terms of the costs associated with transportation agencies (i. e. work zone setups) and road users (i. e. delay). Longer work zones tend to i...Highway maintenance, often requiring lane closure, is very expensive in terms of the costs associated with transportation agencies (i. e. work zone setups) and road users (i. e. delay). Longer work zones tend to increase the user delay but will be efficient because of fewer repeated setups. To increase road capacity and mitigate congestion impact for a short-term work zone, temporary shoulder use may be applied. This study develops an analytical model to optimize work zone length on a multi-lane highway considering time-varying traffic volume and road capacity affected by light condition, heavy vehicle percentage, and lane width. The results can be used to evaluate the work Zone impact (i. e. delay and cost) and assist engineers/planners to prepare and develop a cost-effective highway maintenance plan. A case study for a highway work zone in New Jersey has been conducted, in which the optimized solution is found. A guideline of using road shoulder under various circumstances is developed.展开更多
Purpose–This study aims to investigate the safety effects of work zone advisory systems.The traditional system includes a dynamic message sign(DMS),whereas the advanced system includes an in-vehicle work zone warning...Purpose–This study aims to investigate the safety effects of work zone advisory systems.The traditional system includes a dynamic message sign(DMS),whereas the advanced system includes an in-vehicle work zone warning application under the connected vehicle(CV)environment.Design/methodology/approach–A comparative analysis was conducted based on the microsimulation experiments.Findings–The results indicate that the CV-based warning system outperforms the DMS.From this study,the optimal distances of placing a DMS varies according to different traffic conditions.Nevertheless,negative influence of excessive distance DMS placed from the work zone would be more obvious when there is heavier traffic volume.Thus,it is recommended that the optimal distance DMS placed from the work zone should be shortened if there is a traffic congestion.It was also revealed that higher market penetration rate of CVs will lead to safer network under good traffic conditions.Research limitations/implications–Because this study used only microsimulation,the results do not reflect the real-world drivers’reactions to DMS and CV warning messages.A series of driving simulator experiments need to be conducted to capture the real driving behaviors so as to investigate the unresolved-related issues.Human machine interface needs be used to simulate the process of in-vehicle warning information delivery.The validation of the simulation model was not conducted because of the data limitation.Practical implications–It suggests for the optimal DMS placement for improving the overall efficiency and safety under the CV environment.Originality/value–A traffic network evaluation method considering both efficiency and safety is proposed by applying traffic simulation.展开更多
Purpose–Freeway work zones have been traffic bottlenecks that lead to a series of problems,including long travel time,high-speed variation,driver’s dissatisfaction and traffic congestion.This research aims to develo...Purpose–Freeway work zones have been traffic bottlenecks that lead to a series of problems,including long travel time,high-speed variation,driver’s dissatisfaction and traffic congestion.This research aims to develop a collaborative component of connected and automated vehicles(CAVs)to alleviate negative effects caused by work zones.Design/methodology/approach–The proposed cooperative component is incorporated in a cellular automata model to examine how and to what scale CAVs can help in improving traffic operations.Findings–Simulation results show that,with the proposed component and penetration of CAVs,the average performances(travel time,safety and emission)can all be improved and the stochasticity of performances will be minimized too.Originality/value–To the best of the authors’knowledge,this is the first research that develops a cooperative mechanism of CAVs to improve work zone performance.展开更多
Construction is a dangerous business. According to statistics, in every of the past thirteen years more than 1000 workers died in the USA construction industry. In order to minimize the overall number of these inciden...Construction is a dangerous business. According to statistics, in every of the past thirteen years more than 1000 workers died in the USA construction industry. In order to minimize the overall number of these incidents, the research presented in this paper investigates to monitor and analyze the trajectories of construction resources first in a simulated environment and later on the actual job site. Due to the complex nature of the construction environment, three dimensional (3D) positioning data of workers is hardly collected. Although technology is available that allows tracking construction assets in real-time, indoors and outdoors, in 3D, at the same time, the continuously changing spatial and temporal arrangement of job sites requires any successfully working data processing system to work in real-time. This research paper focuses is safety on spatial data structures that offer the capability of realigning itself and reporting the distance of the closest neighbor in real-time. This paper presents results to simulations that allow the processing of real-time location data for collision detection and proximity analysis. The presented data structures and perform-ance results to the developed algorithms demonstrate that real-time tracking and proximity detection of resources is feasible.展开更多
文摘This study investigates relationships between congestion and travel time performance metrics and crashes on road segments. The study focuses on work zone routes in Iowa, utilizing 2021 commercially-available probe vehicle data and crash data. Travel time performance metrics were derived from the probe vehicle data, and crash counts were obtained from the crash data. Additional variables included road characteristics (traffic volume, road type, segment length) and a categorical variable for the presence of a work zone. A mixed effect linear regression model was employed to identify relationships between road segment crash counts and the selected performance metrics. This was accomplished for two sets of models that include congestion performance measures at different defining threshold values, along with travel time performance measures. The study results indicate that the congestion indicators, certain travel time performance measures, and traffic counts were statistically significant and positively correlated with crash counts. Indicator variables for rural interstate locations and non-active work zones have a stronger influence on crash count than those for municipal interstate locations and active work zones. These findings can inform decision-makers on work zone safety strategies and crash mitigation planning, especially in high traffic volume areas prone to congestion and queues.
文摘The presence of work zones due to pavement repair and rehabilitation is very common in highway facilities. Lane closures associated with work zones result in capacity reduction, which, in turn, often leads to increased congestion at such locations. This paper documents findings from a study that investigated the performance of freeway facilities in the presence of work zones under various Temporary Traffic Control (TTC) and lane closure scenarios while taking under consideration traffic composition and driving behaviors. The study site was an approximately 10-mile freeway segment of Interstate 65 (I-65) located in Birmingham, AL. The testbed was coded in PTV VISSIM, a microscopic simulation analysis platform, for: 1) baseline conditions (i.e., no work zone presence) and 2) work zone conditions with single lane closure (i.e., 3-to-2 lane closure). Work zone scenarios were coded for two TTC strategies, namely, early merge and late merge control and for three different positions of the lane closure (i.e., left, right, and center lane closures). The length of the work zones varied from 1000 to 2000, and 3000 ft. Sensitivity analysis was performed to document the operational impacts of varying heavy vehicle percentages, changes in drivers’ aggressiveness, and projected traffic demand changes. The impacts were quantified using linked-based measures of effectiveness (MOEs) such as travel time, and travel time index. The study results show that there is no significant change in travel time index due to the variation of work zone length across the study corridor. Under similar traffic control and demand conditions, a center lane closure consistently results in significantly higher travel time index than a left or right lane closure and should be avoided. Consideration of operational impacts of changes in truck percentage indicates that the corridor can absorb an increase in truck percentage from 10% to 15%, while performance rapidly deteriorates when a higher percentage of trucks is present in the traffic stream. The study findings can be used to guide transportation agencies in their future efforts to develop strategic lane closure plans that minimize congestion.
文摘Work zone safety continues to be one of the important focus areas for transportation agencies. Previous studies have identified that vehicle speed and lighting conditions are significant risk factors impacting work zone safety. </span><span style="font-family:Verdana;">This study evaluated the impact of the use of presence lighting and digital </span><span style="font-family:Verdana;">speed limit trailers on nighttime motorist speeds using commercially available connected vehicle speed data. Geospatial analysis was conducted on over 500,000 connected vehicle records to linear reference nearly 18,000 records from 195 unique trajectories to study section during the study period of 2 days. Results showed that median speeds reduced by 4 to 13 mph from 11PM to 7AM during the deployment of presence lighting and speed limit trailers </span><span style="font-family:Verdana;">compared to base conditions. A Kolmogorov-Smirnov (KS) statistical test</span><span style="font-family:Verdana;"> com</span><span style="font-family:Verdana;">paring 105 vehicles traveling through the construction zone with presence</span><span style="font-family:Verdana;"> lighting and speed limit trailers with a group of 90 vehicles during base condition indicated the speeds during the deployment of presence lighting and speed limit trailers were lower than the base condition. Also, increased compliance with the 55 mph speed limit was observed when the presence lighting and digital speed limit trailers were deployed. However, there were two hours (3AM to 5AM) where speeds increased by 0</span></span><span style="font-family:""> </span><span style="font-family:Verdana;">-</span><span style="font-family:""> </span><span style="font-family:Verdana;">4 mph, perhaps due to the low volume at that hour. The encouraging results support the further deployment of presence lighting and speed limit trailers in nighttime construction zones for reducing vehicle speeds. Those future deployments should be monitored with connected vehicle speeds to collect additional data to broaden the evaluation of these speed mitigation techniques over a diverse set of construction zone activities.
文摘Maintenance and rehabilitation projects of interstate facilities typically mandate lane closures. Lane closures require merging maneuvers that often result in reduced speeds and traffic bottlenecks. Work zone impacts on traffic operations are magnified when project durations are extended. Conventionally, work zone traffic control plans are developed to address work zone impacts. This study evaluated various merge control strategies at interstate work zones peak and off-peak traffic conditions and summarized related impacts. A comprehensive microscopic simulation model was developed in full consideration of driver/vehicle behavior at work zones. The analysis of simulation results revealed that merge control strategies, when implemented during peak and off-peak conditions, can preserve the level of service and provide favorable mobility, safety, and environmental impacts. In addition, results indicate that transportation agencies’ practice of scheduling work zone activities during the off-peak may not be the most optimum approach. Overall, the findings of this study highlight the need for evaluation of work zone scheduling practices in full consideration of agency, user, and project costs.
文摘A smartphone warning system is a feasible option to notify motorists about a safety threat and/or pedestrian crossings ahead. In this paper, a smartphone-based warning system was proposed to enhance workers’ safety in work zones. Three different warning message systems, including sound, male voice and female voice, were designed to alert drivers. Twenty-four subjects were recruited for a total of ninety-six rounds driving simulator test in a work zone to investigate the impacts of smartphone-based warning messages on subjects’ driving performance, in terms of driving speed, speed variation, acceleration, and brake reaction distance. The outcome showed that, with the assistance of the sound and voice (either female or male) warning messages, drivers could effectively reduce their accelerations and speeds. Meanwhile, such a warning system can induce subjects to shorten their brake reaction distances for worker crossings. All participants found that this warning system is applicable to enhance their defensive driving behaviors while driving through a work zone.
文摘The autonomous vehicles are the future of mobility across the globe and are expected to touch the lives of every person of all ages. But this comes with certain challenges regarding safety, reliability, cost, legal framework, regulations, etc. however, of all the concern safety and reliability are of utmost importance for researchers and engineers. The current research is focused on the movement of the autonomous vehicle in the work zone. The work zone is one of the most challenging areas for the autonomous vehicle to drive from. This is because the work zones are very dynamic, and all the construction activities are specific to the site condition and cannot always be predefined. The study provides a concept of how pavement marking can be used for smooth <span style="font-family:Verdana;">movement through the complicated work zone. In this study, various pav</span><span style="font-family:Verdana;">ement marking signs have been designed as a concept considering the standard colors and striping width being used in the Manual of Uniform Traffic control device (MUTCD). The study assumes that the movement of the autonomous vehicle will not be exclusive and that it will move with the driver driven vehicle. It is expected that autonomous vehicles will require special pavement marking and signage for smooth movement through the work zone. These pavement marking and signage will eventually become part of standard Traffic Control Plans (TCP) and Maintenance of Traffic Plans (MOT). The research aims to study the current research being done in this area and technology being used for detecting various pavement markings and signages.</span>
文摘Annually, there are over 120,000 crashes in work zones in the United States. High speeds in construction zones are a well-documented risk factor that increases <span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">the </span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">frequency and severity of crashes. This study used connected vehicle data to evaluate the spatial and temporal impact that regulatory signs, speed feedback displays, and construction site geometry had on vehicle speed. Over 27,000 unique trips over 2 weeks on a 15-mile interstate construction work zone near Lebanon, IN were analyzed. Spatial analysis over a 0.2-mi segment before and after the posted speed limit signs showed that the regulatory signs had no statistical impact on reducing speeds. A before/after analysis was also conducted to study the impact of radar-based speed feedback that displays the motorists</span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">’</span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"> speed on a sign below a regulatory speed limit sign. Results showed a maximum drop in median speeds of approximately 5 mph. Speeds greater than 15 mph above the speed limit dropped by 10%</span></span></span></span></span><span><span><span><span><span style="font-family:;" "=""> </span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">-</span></span></span></span></span><span><span><span><span><span style="font-family:;" "=""> </span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">15%. The reduction in speeds began approximately 1000 feet ahead of the sign and results were found to be statistically significant. </span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">The </span></span></span></span></span><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;"><span style="font-family:Verdana;">analysis also revealed that larger speed drops inside the work zone were due to geometric constraints that required additional driver workloads, especially during shoulder width changes and lane shifts. The results from this study will be helpful for agencies to understand driver behavior in the work zones and to identify proper speed limit compliance techniques that significantly reduce driver speeds in and around work zones.</span></span></span></span></span>
文摘An iterative process,combining a macroscopic simulator and a set of the traffic demand-change estimation models,is developed to estimate the traffic demand at work zones in urban freeway corridors.The process is designed to capture the interaction between work-zone conditions and traffic diversion in determining the traffic demand approaching the entrance and exit ramps at a given work zone.The proposed models and process were calibrated and tested with the field data from the work zones in the Minnesota metro-freeway network.The test results indicate promising possibilities of the proposed process in terms of the estimation accuracy and transferability of the demand-change estimation models developed in this study.
文摘Objective:To provide anatomical datum for intrusive operations of lumbar intervertebral foramen,especially that using acupuncture-knife as intrusive tool.Methods:To dissect 10 antisepsis cadavers and observe the exposed blood vessels,ligaments,nerves and their adjacent relations in L1/2~L5/S1intervertebral foramen.Results:Lumbar intervertebral foramen exit zones were almost sealed by nerves and blood vessels.There were two zones with relatively no blood vessel and nerve(triangular working zones)located in the midpoint of the distance between two adjacent roots of transverse processus,and clung to lamina of vertebral arch,and they were also found upon the margo superior of the root of transverse processus,but the ascending lumbar vein or(and)the rami anastomoticus between the remi inferior of intervertebral vein and lumbar veins were observed in 12%triangular working zones upon the margo superior of root of transverse processus.Conclusions:"Triangular working zone"was relatively avascular zone.Pay attention to the possibilty of presence of blood vessels on the entrance passage of intrusive operations on lumbar side rear.The needlepoint should be pierced at the midpoint of the distance between two adjacent roots of transverse processus and cling to the outer edge of lamina of vertebral arch when doing the foraminal lumbar puncture.As lumbar intervertebral foramina exit zone was almost sealed by nerves and blood vessels,blind incising and debonding with acupuncture-knife in this area was relatively much more dangerous.
文摘Road maintenance work brings costs to the government and delays to users. The setting up of work zones often leads to severe congestion during peak hours, especially in busy urban areas. A road maintenance delay model is presented here that includes consideration of excessive traffic flow and non-motorists. Atrial-and-error method is used to find the optimal work zone length and the best work starting time to minimize the total cost of maintenance and delays. A numerical example with a sensitivity analysis is also given. The results show that optimal starting time is not sensitive to the flow speed and the increase of work zone speeds sharply reduces the total cost when the road is congested.
基金supported by National Natural Science Foundation of China(No.51208053)the Special Fund for Basic Scientific Research of Central Colleges,Chang'an University(No.00092014G1211011,2013G1211009)
文摘To accurately assess the safety of freeway work zones, this paper investigates the safety of vehicle lane change maneuvers with improved cellular automata model. Taking the traffic conflict and standard deviation of operating speed as the evaluation indexes, the study evaluates the freeway work zone safety. With improved deceleration probability in car-following rules and the addition of lanechanging rules under critical state, the lane-changing behavior under critical state is defined as a conflict count. Through 72 schemes of simulation runs, the possible states of the traffic flow are carefully studied. The results show that under the condition of constant saturation traffic conflict count and vehicle speed standard deviation reach their maximums when the mixed rate of heave vehicles is 40%. Meanwhile, in the case of constant heavy vehicles mix, traffic conflict count and vehicle speed standard deviation reach maximum values when saturation rate is 0.75. Integrating all simulation results, it is known the traffic safety in freeway work zones is classified into four levels: safe, relatively safe, relatively dangerous, and dangerous.
文摘Highway maintenance, often requiring lane closure, is very expensive in terms of the costs associated with transportation agencies (i. e. work zone setups) and road users (i. e. delay). Longer work zones tend to increase the user delay but will be efficient because of fewer repeated setups. To increase road capacity and mitigate congestion impact for a short-term work zone, temporary shoulder use may be applied. This study develops an analytical model to optimize work zone length on a multi-lane highway considering time-varying traffic volume and road capacity affected by light condition, heavy vehicle percentage, and lane width. The results can be used to evaluate the work Zone impact (i. e. delay and cost) and assist engineers/planners to prepare and develop a cost-effective highway maintenance plan. A case study for a highway work zone in New Jersey has been conducted, in which the optimized solution is found. A guideline of using road shoulder under various circumstances is developed.
基金funded by National Key R&D Program of China(2020YFB1600400)Innovation-Driven Project of Central South University(2020CX013)Shanghai Sailing Program(19YF1451300).
文摘Purpose–This study aims to investigate the safety effects of work zone advisory systems.The traditional system includes a dynamic message sign(DMS),whereas the advanced system includes an in-vehicle work zone warning application under the connected vehicle(CV)environment.Design/methodology/approach–A comparative analysis was conducted based on the microsimulation experiments.Findings–The results indicate that the CV-based warning system outperforms the DMS.From this study,the optimal distances of placing a DMS varies according to different traffic conditions.Nevertheless,negative influence of excessive distance DMS placed from the work zone would be more obvious when there is heavier traffic volume.Thus,it is recommended that the optimal distance DMS placed from the work zone should be shortened if there is a traffic congestion.It was also revealed that higher market penetration rate of CVs will lead to safer network under good traffic conditions.Research limitations/implications–Because this study used only microsimulation,the results do not reflect the real-world drivers’reactions to DMS and CV warning messages.A series of driving simulator experiments need to be conducted to capture the real driving behaviors so as to investigate the unresolved-related issues.Human machine interface needs be used to simulate the process of in-vehicle warning information delivery.The validation of the simulation model was not conducted because of the data limitation.Practical implications–It suggests for the optimal DMS placement for improving the overall efficiency and safety under the CV environment.Originality/value–A traffic network evaluation method considering both efficiency and safety is proposed by applying traffic simulation.
文摘Purpose–Freeway work zones have been traffic bottlenecks that lead to a series of problems,including long travel time,high-speed variation,driver’s dissatisfaction and traffic congestion.This research aims to develop a collaborative component of connected and automated vehicles(CAVs)to alleviate negative effects caused by work zones.Design/methodology/approach–The proposed cooperative component is incorporated in a cellular automata model to examine how and to what scale CAVs can help in improving traffic operations.Findings–Simulation results show that,with the proposed component and penetration of CAVs,the average performances(travel time,safety and emission)can all be improved and the stochasticity of performances will be minimized too.Originality/value–To the best of the authors’knowledge,this is the first research that develops a cooperative mechanism of CAVs to improve work zone performance.
文摘Construction is a dangerous business. According to statistics, in every of the past thirteen years more than 1000 workers died in the USA construction industry. In order to minimize the overall number of these incidents, the research presented in this paper investigates to monitor and analyze the trajectories of construction resources first in a simulated environment and later on the actual job site. Due to the complex nature of the construction environment, three dimensional (3D) positioning data of workers is hardly collected. Although technology is available that allows tracking construction assets in real-time, indoors and outdoors, in 3D, at the same time, the continuously changing spatial and temporal arrangement of job sites requires any successfully working data processing system to work in real-time. This research paper focuses is safety on spatial data structures that offer the capability of realigning itself and reporting the distance of the closest neighbor in real-time. This paper presents results to simulations that allow the processing of real-time location data for collision detection and proximity analysis. The presented data structures and perform-ance results to the developed algorithms demonstrate that real-time tracking and proximity detection of resources is feasible.