This paper compares analytical and numerical methods by taking the forecasting of water yield of deep-buried iron mine in Yanzhou, Shandong as an example. Regarding the analytical method, the equation of infinite and ...This paper compares analytical and numerical methods by taking the forecasting of water yield of deep-buried iron mine in Yanzhou, Shandong as an example. Regarding the analytical method, the equation of infinite and bilateral water inflow boundary is used to forecast the water yield, and in the case of numerical simulation, we employed the GMS software to establish a model and further to forecast the water yield. On the one hand, through applying the analytical method, the maximum water yield of mine 1 500 m deep below the surface was calculated to be 13 645.17 m3/d; on the other hand, through adopting the numerical method, we obtained the predicted result of 3 816.16 m3/d. Meanwhile, by using the boundary generalization in the above-mentioned two methods, and through a comparative analysis of the actual hydro-geological conditions in this deep-buried mine, which also concerns the advantages and disadvantages of the two methods respectively, this paper draws the conclusion that the analytical method is only applicable in ideal conditions, but numerical method is eligible to be used in complex hydro-geological conditions. Therefore, it is more applicable to employ the numerical method to forecast water yield of deep-buried iron mine in Yanzhou, Shandong.展开更多
文摘This paper compares analytical and numerical methods by taking the forecasting of water yield of deep-buried iron mine in Yanzhou, Shandong as an example. Regarding the analytical method, the equation of infinite and bilateral water inflow boundary is used to forecast the water yield, and in the case of numerical simulation, we employed the GMS software to establish a model and further to forecast the water yield. On the one hand, through applying the analytical method, the maximum water yield of mine 1 500 m deep below the surface was calculated to be 13 645.17 m3/d; on the other hand, through adopting the numerical method, we obtained the predicted result of 3 816.16 m3/d. Meanwhile, by using the boundary generalization in the above-mentioned two methods, and through a comparative analysis of the actual hydro-geological conditions in this deep-buried mine, which also concerns the advantages and disadvantages of the two methods respectively, this paper draws the conclusion that the analytical method is only applicable in ideal conditions, but numerical method is eligible to be used in complex hydro-geological conditions. Therefore, it is more applicable to employ the numerical method to forecast water yield of deep-buried iron mine in Yanzhou, Shandong.