A typical building project has a long life in the maintenance stage. Also, the cost at this stage is enormously huge compared to planning, design and construction phases. In the earlier stage, which is planning or des...A typical building project has a long life in the maintenance stage. Also, the cost at this stage is enormously huge compared to planning, design and construction phases. In the earlier stage, which is planning or design phase, however, many project participants put little emphasis on the maintenance information. As a result, important maintenance data is missing and erroneously feedback to the 3D/BIM model. This research provides a generic process model for maintenance information management for building facilities. The authors have identified that there exist most-frequently used information areas: checking information, material information, equipment information, supplier information, and maintenance history information. Each information area should be embedded in the BIM model in order to effectively feedback to the operation and maintenance stage in the project. Thus, the study has proposed a novel data format structure which can effectively link the 3D/BIM object with the maintenance data. The demonstration project shows how the data format structure is used. The contribution of this study is to provide guidance to a project practitioner by step-by-step approach in dealing with the significant maintenance information in the earlier stage of the construction project.展开更多
Throughout the life cycle, the buildings emit a great deal of carbon dioxide into the atmosphere, which directly leads to aggravation in the greenhouse effect and becomes a severe threat to the environment and humans....Throughout the life cycle, the buildings emit a great deal of carbon dioxide into the atmosphere, which directly leads to aggravation in the greenhouse effect and becomes a severe threat to the environment and humans. Researchers have made numerous efforts to accurately calculate emissions to reduce the life cycle carbon emissions of residential buildings. Nevertheless, there are still difficulties in quickly estimating carbon emissions in the design stage without specific data. To fill this gap, the study, based on Life Cycle Assessment (LCA) and Building Information Modeling (BIM), proposed a quick method for estimating Building’s Life Cycle Carbon Emissions (BLCCE). Taking a hospital building in Chuzhou City, Anhui Province, China as an example, it tested its possibility to estimate BLCCE. The results manifested that: 1) the BLCCE of the project is 40,083.56 tCO2-eq, and the carbon emissions per square meter per year are 119.91 kgCO2-eq/(m2·y);2) the stage of construction, operational and demolition account for 7.90%, 91.31%, and 0.79% of BLCCE, respectively;3) the annual carbon emissions per square meter of hospital are apparently higher than that of villa, residence, and office building, due to larger service population, longer daily operation time, and stricter patient comfort requirements. Considering the lack of BLCCE research in Chinese hospitals, this case study will provide a valuable reference for the estimated BLCCE of hospital building.展开更多
The building sector is the largest consumer of energy in industrial countries. Saving energy in new buildings or building renovations can thus lead to significant global environmental impacts. In this endeavor, buildi...The building sector is the largest consumer of energy in industrial countries. Saving energy in new buildings or building renovations can thus lead to significant global environmental impacts. In this endeavor, building information <span>modeling (BIM) and building energy modeling (BEM) are two important to</span>ols to make the transition to net-zero energy buildings (NZEB). So far, little attention has been devoted, in the literature, to discuss the connection between BIM, BEM, and Life-cycle assessment (LCA), which is the main topic of this article. A literature review of 157 journal articles and conference proceedings published between 1990 and 2020 is presented. This review outlines knowledge gaps concerning BIM, BEM, and environmental impact assessment. It suggests that defining the process with the right technology (at the right time) would result in a more integrated design process (IDP) and bridge current gaps. The most efficient way to improve process and technology is related to the competences of the architects, engineers and constructors (AEC). The review also indicates that the IDP in the early design phases (EDP) is in need of improvement for architects and engineers, where a better connection between design phases, specific levels of development (LOD) and BIM tools is needed. <span>Competences, process and technology are the three main themes addressed in the review. Their relation to design phases and LOD is discussed. The aim </span>is to propose possible solutions to the current hinders in BIM-to-BEM (BIM2BEM) and BIM-for-LCA (BIM4LCA) integration.展开更多
Computer vision-based inspection methods show promise for automating post-earthquake building inspections.These methods survey a building with unmanned aerial vehicles and automatically detect damage in the collected ...Computer vision-based inspection methods show promise for automating post-earthquake building inspections.These methods survey a building with unmanned aerial vehicles and automatically detect damage in the collected images.Nevertheless,assessing the damage′s impact on structural safety requires localizing damage to specific building components with known design and function.This paper proposes a BIM-based automated inspection framework to provide context for visual surveys.A deep learning-based semantic segmentation algorithm is trained to automatically identify damage in images.The BIM automatically associates any identified damage with specific building components.Then,components are classified into damage states consistent with component fragility models for integration with a structural analysis.To demonstrate the framework,methods are developed to photorealistically simulate severe structural damage in a synthetic computer graphics environment.A graphics model of a real building in Urbana,Illinois,is generated to test the framework;the model is integrated with a structural analysis to apply earthquake damage in a physically realistic manner.A simulated UAV survey is flown of the graphics model and the framework is applied.The method achieves high accuracy in assigning damage states to visible structural components.This assignment enables integration with a performance-based earthquake assessment to classify building safety.展开更多
Building Information Modelling (BIM) is a technology and a process that has brought changes in the construction’s traditional procurement system. Kenya lacks contractual guidelines on implementation of BIM;this makes...Building Information Modelling (BIM) is a technology and a process that has brought changes in the construction’s traditional procurement system. Kenya lacks contractual guidelines on implementation of BIM;this makes the adoption of BIM slow and difficult. Previous research has identified a gap in contractual relationships, roles and resulting risks. The objectives of this study were to investigate BIM adoption in Nairobi and to investigate the influence of BIM on Engineering Contract Management (ECM)</span><span style="font-family:Verdana;"> in Nairobi Kenya</span><span style="font-family:Verdana;">. The survey research was a descriptive study with 175 responsive questionnaires. Respondents comprised of Civil Engineers, Construction Project Managers, Architects, Quantity Surveyors, Contractors and Facility Managers. Data was collected through self-administered questionnaire and in-depth interview. Descriptive analytics, correlation and Exploratory factor analysis methods were used to analyse quantitative data. Qualitative data was analysed thematically. It emerged that adoption level was at 56.6% and shallow understanding of BIM capabilities remains to be a barrier to its adoption and implementation. It also emerged that BIM improves ECM;when time, cost, quality, collaboration and return on investment improve, ECM becomes easier. Latent factors found in BIM and ECM relationship were Legal Implications, awareness and knowledge, efficiency, versatility, mandate and leadership, and competitiveness. Further, the study found out that BIM influence on ECM demands for establishment of standards, guidelines, policy, legal framework, and regulations, which can be achieved by amending the public procurement act which dictates the operation of all the other standard forms of contract. Further research should be conducted to measure whether the understanding of BIM had positively improved.展开更多
Building envelope is a fence that controls heat exchange between interior and exterior and plays an essential role in providing thermal comfort conditions of residents. In recent years, due to the necessity of conserv...Building envelope is a fence that controls heat exchange between interior and exterior and plays an essential role in providing thermal comfort conditions of residents. In recent years, due to the necessity of conserving energy and also preventing increased environmental pollution, the importance of sustainable construction has been doubled. Checking the problems of thermal behavior of the building envelope materials, and what influences in the heating and cooling loads exerted and energy consumption of buildings, are the questions that this research seeks to answer. In this regard, building information modelling analysis (BIM) has worthy contribution in the completion process of sustainable design;thus using software Design Builder, it is paid attention to simulation of the thermal behavior of two types of defined materials for the building envelope that was designed as a Research Institute of Renewable Energy of Yazd University. For Type 1 materials, two layers of brick have been selected, and for Type 2 a thermal insulation layer also added it. Results of the analysis showed that the use of materials Type 2 in the cooling load %4.8 and in the thermal load %62.5 reduction can be achieved which means reducing the load on active system and thus reducing the initial cost of building. Also reduction in annual energy consumption by almost %2.4 for cooling and %62.9 for heating buildings have been achieved, which makes saving non-renewable energy consumption, and consequently reducing environmental pollution as well as reducing current costs will be established.展开更多
Underground pipeline networks constitute a major component of urban infrastructure,and thus,it is imperative to have an efficient mechanism to manage them.This study introduces a secondary development system to effici...Underground pipeline networks constitute a major component of urban infrastructure,and thus,it is imperative to have an efficient mechanism to manage them.This study introduces a secondary development system to efficiently model underground pipeline networks,using the building information modeling(BIM)-based software Revit.The system comprises separate pipe point and tubulation models.Using a Revit application programming interface(API),the spatial position and attribute data of the pipe points are extracted from a pipeline database,and the corresponding tubulation data are extracted from a tubulation database.Using the Family class in Revit API,the cluster in the self-built library of pipe point is inserted into the spatial location and the attribute data is added;in the same way,all pipeline instances in the pipeline system are created.The extension and localization of the model accelerated the modeling speed.The system was then used in a real construction project.The expansion of the model database and rapid modeling made the application of BIM technology in three-dimensional visualization of underground pipeline networks more convenient.Furthermore,it has applications in pipeline engineering construction and management.展开更多
A projection of the Canadian population shows that in 2024 one in five Canadians will be over 65 years old. This shift forces designers to consider the entire lifetime of occupants during the design of new buildings. ...A projection of the Canadian population shows that in 2024 one in five Canadians will be over 65 years old. This shift forces designers to consider the entire lifetime of occupants during the design of new buildings. Universal Design (UD), which is a design that accommodates all people to the greatest extent possible and aging in place design that is deeply rooted in the principles of UD, aim to house people irrespective of their age, ability, and chronic health conditions. Building Information Modeling (BIM) significantly helps advance the development of the Architecture, Engineering, and Construction (AEC) industry in a more collaborative and automated way. Integrating BIM and UD allows designers to incorporate UD standards easily and efficiently at the conceptual design stage of buildings by using the functionalities and capabilities of BIM tools. Therefore, this study presents the development of an automated computer model to facilitate the adoption of UD standards and processes. The novelty highlighted in this model resides in the creation of an automated method that employs a newly created plug-in and databases to assist designers to incorporate UD standards at the conceptual stage in a timely and cost-effective manner. Furthermore, the study introduces the methodology consisting of collecting, categorizing, and storing data from various universal design and accessible design guidelines in the developed databases and developing new plug-ins in BIM tool to link the developed databases in order to automate the process of retrieving necessary information and components to help designers and owners select optimal design alternatives based on their predefined criteria.展开更多
Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construc...Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construction sustainability tools, methods and techniques, a greener design can be applied during various building phases. In this connection, it is argued that the analytical and integrated models applied by Building Information Modelling (BIM) may also facilitate this process to be performed more efficiently. BIM and construction sustainability are quite different initiatives, but both have received much attention in recent years in the architecture, engineering and construction (AEC) industry. A rigorous analysis of the interactions between them implies that a synergy exists which, if properly it is understood that can be helpful to reduce the environmental impacts of the AEC industry. A BIM-based design model can contribute to sustainability through its three main dimensions which are environmental, economic and social. In this paper, by reviewing the existing literature on BIM and construction sustainability and using a matrix to analyze construction sustainability dimensions and BIM functionalities a number of interactions have been discussed. It can be concluded that despite there are many improvements in implementation of BIM in environmental and economic aspects of sustainability, its potential impact on social dimension has not been explicitly explored hence further studies need to be undertaken in this area.展开更多
The photovoltaic module building integration level affects the module temperature and,consequently,its output power.In this work,a methodology has been proposed to estimate the influence of the level of architectural ...The photovoltaic module building integration level affects the module temperature and,consequently,its output power.In this work,a methodology has been proposed to estimate the influence of the level of architectural photovoltaic integration on the photovoltaic energy balance with natural ventilation or with forced cooling systems.The developed methodology is applied for five photovoltaic module technologies(m⁃Si,p⁃Si,a⁃Si,CdTe,and CIGS)on four characteristic locations(Athens,Davos,Stockholm,and Würzburg).To this end,a photovoltaic module thermal radiation parameter,PVj,is introduced in the characterization of the PV module technology,rendering the correlations suitable for building⁃integrated photovoltaic(BIPV)applications,with natural ventilation or with forced cooling systems.The results show that PVj has a significant influence on the energy balances,according to the architectural photovoltaic integration and climatic conditions.Keywords:Photovoltaic cooling;BIPV;Photovoltaic;Ventilation;Photovoltaic integration level in building【OA】(2)Graph⁃Based methodology for Multi⁃Scale generation of energy analysis models from IFC,by Asier Mediavilla,Peru Elguezabal,Natalia Lasarte,Article 112795 Abstract:Process digitalisation and automation is unstoppable in all industries,including construction.However,its widespread adoption,even for non⁃experts,demands easy⁃to⁃use tools that reduce technical requirements.BIM to BEM(Building Energy Models)workflows are a clear example,where ad⁃hoc prepared models are needed.This paper describes a methodology,based on graph techniques,to automate it by highly reducing the input BIM requirements found in similar approaches,being applicable to almost any IFC.This is especially relevant in retrofitting,where reality capture tools(e.g.,3D laser scanning,object recognition in drawings)are prone to create geometry clashes and other inconsistencies,posing higher challenges for automation.Another innovation presented is its multi⁃scale nature,efficiently addressing the surroundings impact in the energy model.The application to selected test cases has been successful and further tests are ongoing,considering a higher variety of BIM models in relation to tools and techniques used and model sizes.展开更多
With the advent of the information age,all walks of life have paid more and more attention to the development and application of digital technology.At the same time,the construction industry,which is a traditionally i...With the advent of the information age,all walks of life have paid more and more attention to the development and application of digital technology.At the same time,the construction industry,which is a traditionally important industry,is not an exception.A series of high-tech digital technologies have been widely used in architectural design and construction,such as BIM technology,3D printing technology,and VR technology.In view of the teaching link of architectural talent training,it is necessary to keep up with the development trend of the digital age,integrate these three kinds of technology into architectural teaching,and impart knowledge to students from planar 2D textbooks to 3D visual digital models,and further transform it from 3D digital to physical perceive or virtual simulation level,and reform teaching methods in all dimensions and in all dimensions to improve teaching effect.In this paper,the feasibility and necessity of integration of the above three architectural digital techniques into the teaching process of"building construction"from the aspects of teaching content,teaching method and teaching evaluation were discussed,and a new teaching model under the background of digital technology was proposed,which has certain teaching reference significance.展开更多
Mark-recapture models are extensively used in quantitative population ecology, providing estimates of population vital rates, such as survival, that are difficult to obtain using other methods. Vital rates are commonl...Mark-recapture models are extensively used in quantitative population ecology, providing estimates of population vital rates, such as survival, that are difficult to obtain using other methods. Vital rates are commonly modeled as functions of explanatory covariates, adding considerable flexibility to mark-recapture models, but also increasing the subjectivity and complexity of the modeling process. Consequently, model selection and the evaluation of covariate structure remain critical aspects of mark-recapture modeling. The difficulties involved in model selection are compounded in Cormack-Jolly-Seber models because they are composed of separate sub-models for survival and recapture probabilities, which are conceptualized independently even though their parameters are not statistically independent. The construction of models as combinations of sub-models, together with multiple potential covariates, can lead to a large model set. Although desirable, estimation of the parameters of all models may not be feasible. Strategies to search a model space and base inference on a subset of all models exist and enjoy widespread use. However, even though the methods used to search a model space can be expected to influence parameter estimation, the assessment of covariate importance, and therefore the ecological interpretation of the modeling results, the performance of these strategies has received limited investigation. We present a new strategy for searching the space of a candidate set of Cormack-Jolly-Seber models and explore its performance relative to existing strategies using computer simulation. The new strategy provides an improved assessment of the importance of covariates and covariate combinations used to model survival and recapture probabilities, while requiring only a modest increase in the number of models on which inference is based in comparison to existing techniques.展开更多
文摘A typical building project has a long life in the maintenance stage. Also, the cost at this stage is enormously huge compared to planning, design and construction phases. In the earlier stage, which is planning or design phase, however, many project participants put little emphasis on the maintenance information. As a result, important maintenance data is missing and erroneously feedback to the 3D/BIM model. This research provides a generic process model for maintenance information management for building facilities. The authors have identified that there exist most-frequently used information areas: checking information, material information, equipment information, supplier information, and maintenance history information. Each information area should be embedded in the BIM model in order to effectively feedback to the operation and maintenance stage in the project. Thus, the study has proposed a novel data format structure which can effectively link the 3D/BIM object with the maintenance data. The demonstration project shows how the data format structure is used. The contribution of this study is to provide guidance to a project practitioner by step-by-step approach in dealing with the significant maintenance information in the earlier stage of the construction project.
文摘Throughout the life cycle, the buildings emit a great deal of carbon dioxide into the atmosphere, which directly leads to aggravation in the greenhouse effect and becomes a severe threat to the environment and humans. Researchers have made numerous efforts to accurately calculate emissions to reduce the life cycle carbon emissions of residential buildings. Nevertheless, there are still difficulties in quickly estimating carbon emissions in the design stage without specific data. To fill this gap, the study, based on Life Cycle Assessment (LCA) and Building Information Modeling (BIM), proposed a quick method for estimating Building’s Life Cycle Carbon Emissions (BLCCE). Taking a hospital building in Chuzhou City, Anhui Province, China as an example, it tested its possibility to estimate BLCCE. The results manifested that: 1) the BLCCE of the project is 40,083.56 tCO2-eq, and the carbon emissions per square meter per year are 119.91 kgCO2-eq/(m2·y);2) the stage of construction, operational and demolition account for 7.90%, 91.31%, and 0.79% of BLCCE, respectively;3) the annual carbon emissions per square meter of hospital are apparently higher than that of villa, residence, and office building, due to larger service population, longer daily operation time, and stricter patient comfort requirements. Considering the lack of BLCCE research in Chinese hospitals, this case study will provide a valuable reference for the estimated BLCCE of hospital building.
文摘The building sector is the largest consumer of energy in industrial countries. Saving energy in new buildings or building renovations can thus lead to significant global environmental impacts. In this endeavor, building information <span>modeling (BIM) and building energy modeling (BEM) are two important to</span>ols to make the transition to net-zero energy buildings (NZEB). So far, little attention has been devoted, in the literature, to discuss the connection between BIM, BEM, and Life-cycle assessment (LCA), which is the main topic of this article. A literature review of 157 journal articles and conference proceedings published between 1990 and 2020 is presented. This review outlines knowledge gaps concerning BIM, BEM, and environmental impact assessment. It suggests that defining the process with the right technology (at the right time) would result in a more integrated design process (IDP) and bridge current gaps. The most efficient way to improve process and technology is related to the competences of the architects, engineers and constructors (AEC). The review also indicates that the IDP in the early design phases (EDP) is in need of improvement for architects and engineers, where a better connection between design phases, specific levels of development (LOD) and BIM tools is needed. <span>Competences, process and technology are the three main themes addressed in the review. Their relation to design phases and LOD is discussed. The aim </span>is to propose possible solutions to the current hinders in BIM-to-BEM (BIM2BEM) and BIM-for-LCA (BIM4LCA) integration.
基金Financial support for this research was provided in part by the US Army Corps of Engineers through a subaward from the University of California,San Diego,USA。
文摘Computer vision-based inspection methods show promise for automating post-earthquake building inspections.These methods survey a building with unmanned aerial vehicles and automatically detect damage in the collected images.Nevertheless,assessing the damage′s impact on structural safety requires localizing damage to specific building components with known design and function.This paper proposes a BIM-based automated inspection framework to provide context for visual surveys.A deep learning-based semantic segmentation algorithm is trained to automatically identify damage in images.The BIM automatically associates any identified damage with specific building components.Then,components are classified into damage states consistent with component fragility models for integration with a structural analysis.To demonstrate the framework,methods are developed to photorealistically simulate severe structural damage in a synthetic computer graphics environment.A graphics model of a real building in Urbana,Illinois,is generated to test the framework;the model is integrated with a structural analysis to apply earthquake damage in a physically realistic manner.A simulated UAV survey is flown of the graphics model and the framework is applied.The method achieves high accuracy in assigning damage states to visible structural components.This assignment enables integration with a performance-based earthquake assessment to classify building safety.
文摘Building Information Modelling (BIM) is a technology and a process that has brought changes in the construction’s traditional procurement system. Kenya lacks contractual guidelines on implementation of BIM;this makes the adoption of BIM slow and difficult. Previous research has identified a gap in contractual relationships, roles and resulting risks. The objectives of this study were to investigate BIM adoption in Nairobi and to investigate the influence of BIM on Engineering Contract Management (ECM)</span><span style="font-family:Verdana;"> in Nairobi Kenya</span><span style="font-family:Verdana;">. The survey research was a descriptive study with 175 responsive questionnaires. Respondents comprised of Civil Engineers, Construction Project Managers, Architects, Quantity Surveyors, Contractors and Facility Managers. Data was collected through self-administered questionnaire and in-depth interview. Descriptive analytics, correlation and Exploratory factor analysis methods were used to analyse quantitative data. Qualitative data was analysed thematically. It emerged that adoption level was at 56.6% and shallow understanding of BIM capabilities remains to be a barrier to its adoption and implementation. It also emerged that BIM improves ECM;when time, cost, quality, collaboration and return on investment improve, ECM becomes easier. Latent factors found in BIM and ECM relationship were Legal Implications, awareness and knowledge, efficiency, versatility, mandate and leadership, and competitiveness. Further, the study found out that BIM influence on ECM demands for establishment of standards, guidelines, policy, legal framework, and regulations, which can be achieved by amending the public procurement act which dictates the operation of all the other standard forms of contract. Further research should be conducted to measure whether the understanding of BIM had positively improved.
文摘Building envelope is a fence that controls heat exchange between interior and exterior and plays an essential role in providing thermal comfort conditions of residents. In recent years, due to the necessity of conserving energy and also preventing increased environmental pollution, the importance of sustainable construction has been doubled. Checking the problems of thermal behavior of the building envelope materials, and what influences in the heating and cooling loads exerted and energy consumption of buildings, are the questions that this research seeks to answer. In this regard, building information modelling analysis (BIM) has worthy contribution in the completion process of sustainable design;thus using software Design Builder, it is paid attention to simulation of the thermal behavior of two types of defined materials for the building envelope that was designed as a Research Institute of Renewable Energy of Yazd University. For Type 1 materials, two layers of brick have been selected, and for Type 2 a thermal insulation layer also added it. Results of the analysis showed that the use of materials Type 2 in the cooling load %4.8 and in the thermal load %62.5 reduction can be achieved which means reducing the load on active system and thus reducing the initial cost of building. Also reduction in annual energy consumption by almost %2.4 for cooling and %62.9 for heating buildings have been achieved, which makes saving non-renewable energy consumption, and consequently reducing environmental pollution as well as reducing current costs will be established.
基金supported by a grant(No.14DZ2292800,http://www.greengeo.net/)from“Technology Service Platform of Civil Engineering”of Science and Technology Commission of Shanghai Municipality.
文摘Underground pipeline networks constitute a major component of urban infrastructure,and thus,it is imperative to have an efficient mechanism to manage them.This study introduces a secondary development system to efficiently model underground pipeline networks,using the building information modeling(BIM)-based software Revit.The system comprises separate pipe point and tubulation models.Using a Revit application programming interface(API),the spatial position and attribute data of the pipe points are extracted from a pipeline database,and the corresponding tubulation data are extracted from a tubulation database.Using the Family class in Revit API,the cluster in the self-built library of pipe point is inserted into the spatial location and the attribute data is added;in the same way,all pipeline instances in the pipeline system are created.The extension and localization of the model accelerated the modeling speed.The system was then used in a real construction project.The expansion of the model database and rapid modeling made the application of BIM technology in three-dimensional visualization of underground pipeline networks more convenient.Furthermore,it has applications in pipeline engineering construction and management.
文摘A projection of the Canadian population shows that in 2024 one in five Canadians will be over 65 years old. This shift forces designers to consider the entire lifetime of occupants during the design of new buildings. Universal Design (UD), which is a design that accommodates all people to the greatest extent possible and aging in place design that is deeply rooted in the principles of UD, aim to house people irrespective of their age, ability, and chronic health conditions. Building Information Modeling (BIM) significantly helps advance the development of the Architecture, Engineering, and Construction (AEC) industry in a more collaborative and automated way. Integrating BIM and UD allows designers to incorporate UD standards easily and efficiently at the conceptual design stage of buildings by using the functionalities and capabilities of BIM tools. Therefore, this study presents the development of an automated computer model to facilitate the adoption of UD standards and processes. The novelty highlighted in this model resides in the creation of an automated method that employs a newly created plug-in and databases to assist designers to incorporate UD standards at the conceptual stage in a timely and cost-effective manner. Furthermore, the study introduces the methodology consisting of collecting, categorizing, and storing data from various universal design and accessible design guidelines in the developed databases and developing new plug-ins in BIM tool to link the developed databases in order to automate the process of retrieving necessary information and components to help designers and owners select optimal design alternatives based on their predefined criteria.
文摘Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construction sustainability tools, methods and techniques, a greener design can be applied during various building phases. In this connection, it is argued that the analytical and integrated models applied by Building Information Modelling (BIM) may also facilitate this process to be performed more efficiently. BIM and construction sustainability are quite different initiatives, but both have received much attention in recent years in the architecture, engineering and construction (AEC) industry. A rigorous analysis of the interactions between them implies that a synergy exists which, if properly it is understood that can be helpful to reduce the environmental impacts of the AEC industry. A BIM-based design model can contribute to sustainability through its three main dimensions which are environmental, economic and social. In this paper, by reviewing the existing literature on BIM and construction sustainability and using a matrix to analyze construction sustainability dimensions and BIM functionalities a number of interactions have been discussed. It can be concluded that despite there are many improvements in implementation of BIM in environmental and economic aspects of sustainability, its potential impact on social dimension has not been explicitly explored hence further studies need to be undertaken in this area.
文摘The photovoltaic module building integration level affects the module temperature and,consequently,its output power.In this work,a methodology has been proposed to estimate the influence of the level of architectural photovoltaic integration on the photovoltaic energy balance with natural ventilation or with forced cooling systems.The developed methodology is applied for five photovoltaic module technologies(m⁃Si,p⁃Si,a⁃Si,CdTe,and CIGS)on four characteristic locations(Athens,Davos,Stockholm,and Würzburg).To this end,a photovoltaic module thermal radiation parameter,PVj,is introduced in the characterization of the PV module technology,rendering the correlations suitable for building⁃integrated photovoltaic(BIPV)applications,with natural ventilation or with forced cooling systems.The results show that PVj has a significant influence on the energy balances,according to the architectural photovoltaic integration and climatic conditions.Keywords:Photovoltaic cooling;BIPV;Photovoltaic;Ventilation;Photovoltaic integration level in building【OA】(2)Graph⁃Based methodology for Multi⁃Scale generation of energy analysis models from IFC,by Asier Mediavilla,Peru Elguezabal,Natalia Lasarte,Article 112795 Abstract:Process digitalisation and automation is unstoppable in all industries,including construction.However,its widespread adoption,even for non⁃experts,demands easy⁃to⁃use tools that reduce technical requirements.BIM to BEM(Building Energy Models)workflows are a clear example,where ad⁃hoc prepared models are needed.This paper describes a methodology,based on graph techniques,to automate it by highly reducing the input BIM requirements found in similar approaches,being applicable to almost any IFC.This is especially relevant in retrofitting,where reality capture tools(e.g.,3D laser scanning,object recognition in drawings)are prone to create geometry clashes and other inconsistencies,posing higher challenges for automation.Another innovation presented is its multi⁃scale nature,efficiently addressing the surroundings impact in the energy model.The application to selected test cases has been successful and further tests are ongoing,considering a higher variety of BIM models in relation to tools and techniques used and model sizes.
基金Supported by the Teaching Reform Project of Jiangxi Normal University(Exploration and Research on the Practical Teaching Reform of Building Construction Course)
文摘With the advent of the information age,all walks of life have paid more and more attention to the development and application of digital technology.At the same time,the construction industry,which is a traditionally important industry,is not an exception.A series of high-tech digital technologies have been widely used in architectural design and construction,such as BIM technology,3D printing technology,and VR technology.In view of the teaching link of architectural talent training,it is necessary to keep up with the development trend of the digital age,integrate these three kinds of technology into architectural teaching,and impart knowledge to students from planar 2D textbooks to 3D visual digital models,and further transform it from 3D digital to physical perceive or virtual simulation level,and reform teaching methods in all dimensions and in all dimensions to improve teaching effect.In this paper,the feasibility and necessity of integration of the above three architectural digital techniques into the teaching process of"building construction"from the aspects of teaching content,teaching method and teaching evaluation were discussed,and a new teaching model under the background of digital technology was proposed,which has certain teaching reference significance.
文摘Mark-recapture models are extensively used in quantitative population ecology, providing estimates of population vital rates, such as survival, that are difficult to obtain using other methods. Vital rates are commonly modeled as functions of explanatory covariates, adding considerable flexibility to mark-recapture models, but also increasing the subjectivity and complexity of the modeling process. Consequently, model selection and the evaluation of covariate structure remain critical aspects of mark-recapture modeling. The difficulties involved in model selection are compounded in Cormack-Jolly-Seber models because they are composed of separate sub-models for survival and recapture probabilities, which are conceptualized independently even though their parameters are not statistically independent. The construction of models as combinations of sub-models, together with multiple potential covariates, can lead to a large model set. Although desirable, estimation of the parameters of all models may not be feasible. Strategies to search a model space and base inference on a subset of all models exist and enjoy widespread use. However, even though the methods used to search a model space can be expected to influence parameter estimation, the assessment of covariate importance, and therefore the ecological interpretation of the modeling results, the performance of these strategies has received limited investigation. We present a new strategy for searching the space of a candidate set of Cormack-Jolly-Seber models and explore its performance relative to existing strategies using computer simulation. The new strategy provides an improved assessment of the importance of covariates and covariate combinations used to model survival and recapture probabilities, while requiring only a modest increase in the number of models on which inference is based in comparison to existing techniques.