In order to validate the simulation model and develop heave compensation control strategy,heave compensation model tests were performed.The model test installation includes themining ship motion simulator,the heave co...In order to validate the simulation model and develop heave compensation control strategy,heave compensation model tests were performed.The model test installation includes themining ship motion simulator,the heave compensation system,the lifting pipe simulator,the buffer simulator and the water pool.The tests ofmining ship motion simulator show that it is able to perform under the predetermined attitude path smoothly and can meet the requirements of themining ship motions.The heave compensation effect is more than 60% under random wave and the goal is set to be 50%.The model test results indicate that this heave compensation system is effective and feasible.展开更多
Installation error angle is one of the factors that affect the accuracy of electronic compass used for geomagnetic navigation.To solve this problem,the calibration and compensation methods for installation error angle...Installation error angle is one of the factors that affect the accuracy of electronic compass used for geomagnetic navigation.To solve this problem,the calibration and compensation methods for installation error angle are studied.By analyzing the generation mechanism of installation error angle of electronic compass,an installation error model is established,compensation formulae are derived,and calibration scheme is proposed.To verify the correctness of the calibration and compensation methods,the verification experiment is conducted by computer simulation.The simulation results show that the proposed calibration and compensation methods are effective and practical.展开更多
Selecting a cost optimum subset of discrete-value dispersion compensation modules (DV-DCMs) subject to maximum module count from an available set of DV-DCMs is a NP-hard problem. We derive a novel dynamic programming ...Selecting a cost optimum subset of discrete-value dispersion compensation modules (DV-DCMs) subject to maximum module count from an available set of DV-DCMs is a NP-hard problem. We derive a novel dynamic programming algorithm with pseudo-polynomial time bound and show that DV-DCM cost re-scaling can improve the running time.展开更多
基金Project(50675226) supported by the National Natural Science Foundation of China Project(DYXM-115-04-02-01) supported by the Eleventh Five-Year Plan of China
文摘In order to validate the simulation model and develop heave compensation control strategy,heave compensation model tests were performed.The model test installation includes themining ship motion simulator,the heave compensation system,the lifting pipe simulator,the buffer simulator and the water pool.The tests ofmining ship motion simulator show that it is able to perform under the predetermined attitude path smoothly and can meet the requirements of themining ship motions.The heave compensation effect is more than 60% under random wave and the goal is set to be 50%.The model test results indicate that this heave compensation system is effective and feasible.
基金Natural Science Foundation of Shanxi Province(No.2010011022-4)
文摘Installation error angle is one of the factors that affect the accuracy of electronic compass used for geomagnetic navigation.To solve this problem,the calibration and compensation methods for installation error angle are studied.By analyzing the generation mechanism of installation error angle of electronic compass,an installation error model is established,compensation formulae are derived,and calibration scheme is proposed.To verify the correctness of the calibration and compensation methods,the verification experiment is conducted by computer simulation.The simulation results show that the proposed calibration and compensation methods are effective and practical.
文摘Selecting a cost optimum subset of discrete-value dispersion compensation modules (DV-DCMs) subject to maximum module count from an available set of DV-DCMs is a NP-hard problem. We derive a novel dynamic programming algorithm with pseudo-polynomial time bound and show that DV-DCM cost re-scaling can improve the running time.