期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
论校本课题研究资源及有效管理 被引量:1
1
作者 乔亚利 《新课程研究(上旬)》 2008年第9期66-67,76,共3页
在校本课题研究的过程中,出现了一系列的问题,而课题研究缺乏有效管理是导致问题出现的重要因素。本文拟结合一所小学开展课题研究的实践经验,提出课题研究资源的概念:课题的生成资源、课题研究的主体资源和课题研究的支持资源,并围绕... 在校本课题研究的过程中,出现了一系列的问题,而课题研究缺乏有效管理是导致问题出现的重要因素。本文拟结合一所小学开展课题研究的实践经验,提出课题研究资源的概念:课题的生成资源、课题研究的主体资源和课题研究的支持资源,并围绕上述资源提出相应的管理策略:校本课题研究行动的管理、校本课题研究主体资源的管理及校本课题研究"专家"资源的管理。 展开更多
关键词 校本课题研究 主体资源 “专家”资源 资源管理
下载PDF
Expert recommendation system based on analyzing expertise and networks of human resources in National Science & Technology Information Service 被引量:2
2
作者 YANG Myung-seok KANG Nam-kyu +3 位作者 KIM Yun-jeong KIM Jae-soo CHOI Kwang-nam KIM Young-kuk 《Journal of Central South University》 SCIE EI CAS 2013年第8期2212-2218,共7页
This work aims to implement expert and collaborative group recommendation services through an analysis of expertise and network relations NTIS. First of all, expertise database has been constructed by extracting keywo... This work aims to implement expert and collaborative group recommendation services through an analysis of expertise and network relations NTIS. First of all, expertise database has been constructed by extracting keywords after indexing national R&D information in Korea (human resources, project and outcome) and applying expertise calculation algorithm. In consideration of the characteristics of national R&D information, weight values have been selected. Then, expertise points were calculated by applying weighted values. In addition, joint research and collaborative relations were implemented in a knowledge map format through network analysis using national R&D information. 展开更多
关键词 human networks network analysis NTIS R&D information
下载PDF
Issues of Access, Equity, and Quality in Early Childhood Development Programmes in Zimbabwe
3
作者 Rose M. Mugweni 《Sociology Study》 2017年第6期315-324,共10页
The paper sought to explore issues of access, equity, and quality in the early childhood development (ECD) sub-sector in Zimbabwe. The massive expansion of ECD services prompted the author to undertake the study. Da... The paper sought to explore issues of access, equity, and quality in the early childhood development (ECD) sub-sector in Zimbabwe. The massive expansion of ECD services prompted the author to undertake the study. Data were collected using focus group discussions, individual interviews, document analysis, and observations. Information from literature, research reports, policies, and practices was also analyzed in order to establish the state of affairs in the provision of ECD. The data were analyzed using theme identification methods to solicit emerging issues. Generally, it was found that on issues of access, equity, and quality in ECD in Zimbabwe, there is a quality-quantity dilemma with qualitative progress less conspicuous than quantitative progress. The resultant specific challenges include: large teacher-child ratio; lack of parental involvement, lack of trained ECD specialists with expertise in using a play-based curriculum; and shortage of equipment, material resources, and age appropriate infrastructure. In most ECD settings, there were inadequate health and nutrition provisions. Water, sanitation and health (WASH) facilities were found to be insufficient in most centres. The study recommended that there is need for: equal access to quality early childhood education; provision of infrastructure, provision of ability and age appropriate resources; and health, sanitation, and nutrition services especially in rural settings. Overall, ECD programmes in Zimbabwe should strive to attain quality more than quantity services. The need to train more early childhood specialists who would drive the ECD sub-sector is emphasized. 展开更多
关键词 ACCESS EQUITY QUALITY quantity early childhood development
下载PDF
Research on Mineral Resource Prediction by GA-ANN
4
作者 韩万林 张幼蒂 《Journal of China University of Mining and Technology》 2002年第1期15-19,共5页
Fault recognition and coal seam thickness forecast are important problems in mineral resource prediction. Knowledge of multiple disciplines, which include mining engineering, mine geology, seismic prospecting etc, was... Fault recognition and coal seam thickness forecast are important problems in mineral resource prediction. Knowledge of multiple disciplines, which include mining engineering, mine geology, seismic prospecting etc, was used synthetically. Artificial neural network was combined with genetic algorithm to found integrated AI method of genetic algorithm artificial neural network(GA ANN). Fault recognition and coal seam thickness forecast were carried to completion by case studies. And the research results are satisfactory. 展开更多
关键词 GA ANN fault recognition coal seam thickness forecast
下载PDF
An Intelligent System for a Resource Allocation Problem Based on Fuzzy Reasoning
5
作者 Vasile Mazilescu 《Computer Technology and Application》 2011年第4期247-255,共9页
The development of the assistive abilities regarding the decision-making process o fan Intelligent Control System (ICS) like a fuzzy expert system implies the development of its functionality and its ability of spec... The development of the assistive abilities regarding the decision-making process o fan Intelligent Control System (ICS) like a fuzzy expert system implies the development of its functionality and its ability of specification. Fuzzy expert systems can model fuzzy controllers, i.e., the knowledge representation and the abilities of making decisions corresponding to fuzzy expert systems are much more complicated that in the case of standard fuzzy controllers. The expert system acts also as a supervisor, creating meta-level reasoning on a set of fuzzy controllers, in order to choose the best one for the management of the process. Knowledge Management Systems (KMSs) is a new development paradigm of Intelligent Systems which has resulted from a synergy between fuzzy sets, artificial neural networks, evolutionary computation, machine learning, etc., broadening computer science, physics, economics, engineering, mathematics. This paper presents, after a synergic new paradigm of intelligent systems, as a practical case study the fuzzy and temporal properties of knowledge formalism embedded in an ICS. We are not dealing high with level reasoning methods, because we think that real-time problems can only be solved by rather low-level reasoning. Solving the match-time predictability problem would allow us to build much more powerful reasoning techniques. 展开更多
关键词 Intelligent control knowledge management systems (KMSs) fuzzy reasoning logical aspects for KMSs resource allocation problem (RAP).
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部