In order to implement industrial production of selected functional bacteria for bioremediation of shrimp culture environment, the fermentation conditions of the three functional bacteria, which have high ability in de...In order to implement industrial production of selected functional bacteria for bioremediation of shrimp culture environment, the fermentation conditions of the three functional bacteria, which have high ability in degrading organic pollutants at the bottom of shrimp ponds, were studied. The results showed that the favorable fermentation medium (per L) was 25 g of peptone, 5 g of yeast extract, and 0.2 g of ferric phosphate, and the initial pH value of the medium was 8.0. The optimum fermentation time was 20 h. The optimum stirring way was stirring one hour after one hour. Iso-electric point sedimentation collecting method was the most efficient and economic method to collect the bacteria cells after fermentation, with the optimum sediment pH of 3.67, 4.02, and 3.40 for the strains Lt7222, Gy7018 and Lt7511,respectively. It was also indicated that the survival and reproducing ability of the bacterial cells were not affected by the sedimentation process.展开更多
A large number of towns along the Sanriku coastal line were swept away by tsunami attacks on March 11,2011. Although some heritage buildings survived, the damage condition was too severe to carry on repair and restore...A large number of towns along the Sanriku coastal line were swept away by tsunami attacks on March 11,2011. Although some heritage buildings survived, the damage condition was too severe to carry on repair and restore them to the owners. As the municipal cultural heritage division and local cultural society in Kesennuma City were looking for possibility to save these damaged heritage buildings, the author gave them full assistance. To apply for fund for the repair and restoration work to related foundations, the author made an investigation of the damage conditions, prepared measured drawings, fundamental restoration plans and cost estimates. Domestic and international foundations granted funds to our projects for three years in May 2012, and we formed a restoration body to take responsibility of repair and restoration work. But soon, we were faced with several difficulties. The first is that we had to wait for a long time until the authority fixed the town redevelopment plan, meeting the National Guideline of Tsunami-Free Redevelopment. The second is that the building cost continued to increase during rapid-development periods. Although the author expected to complete the whole work within three years, the progress is really slow, and has not amounted to a quarter.展开更多
文摘In order to implement industrial production of selected functional bacteria for bioremediation of shrimp culture environment, the fermentation conditions of the three functional bacteria, which have high ability in degrading organic pollutants at the bottom of shrimp ponds, were studied. The results showed that the favorable fermentation medium (per L) was 25 g of peptone, 5 g of yeast extract, and 0.2 g of ferric phosphate, and the initial pH value of the medium was 8.0. The optimum fermentation time was 20 h. The optimum stirring way was stirring one hour after one hour. Iso-electric point sedimentation collecting method was the most efficient and economic method to collect the bacteria cells after fermentation, with the optimum sediment pH of 3.67, 4.02, and 3.40 for the strains Lt7222, Gy7018 and Lt7511,respectively. It was also indicated that the survival and reproducing ability of the bacterial cells were not affected by the sedimentation process.
文摘A large number of towns along the Sanriku coastal line were swept away by tsunami attacks on March 11,2011. Although some heritage buildings survived, the damage condition was too severe to carry on repair and restore them to the owners. As the municipal cultural heritage division and local cultural society in Kesennuma City were looking for possibility to save these damaged heritage buildings, the author gave them full assistance. To apply for fund for the repair and restoration work to related foundations, the author made an investigation of the damage conditions, prepared measured drawings, fundamental restoration plans and cost estimates. Domestic and international foundations granted funds to our projects for three years in May 2012, and we formed a restoration body to take responsibility of repair and restoration work. But soon, we were faced with several difficulties. The first is that we had to wait for a long time until the authority fixed the town redevelopment plan, meeting the National Guideline of Tsunami-Free Redevelopment. The second is that the building cost continued to increase during rapid-development periods. Although the author expected to complete the whole work within three years, the progress is really slow, and has not amounted to a quarter.