Rock fall related accidents continue to occur in coal mines,although artificial support mechanisms have been used extensively. Roof stability is primarily determined in many underground mines by a limited number of me...Rock fall related accidents continue to occur in coal mines,although artificial support mechanisms have been used extensively. Roof stability is primarily determined in many underground mines by a limited number of methods that often resort to subjective criteria. It is argued in this paper that stability conditions of mine roof strata,as a key factor in sustainability in coal mines,must be determined by a survey which proactively investigates fundamental aspects of said mine. Failure of rock around the opening happens as a result of both high rock stress conditions and the presence of structural discontinuities. The properties of such discontinuities affect the engineering behavior of rock masses causing wedges or blocks to fall from the roof or sliding out of the walls. A practical rule-based approach to assess the risk of a roof fall is proposed in the paper. The method is based on the analysis of structural data and the geometry and stability of wedges in underground coal mines. In this regard,an accident causing a huge collapse in a coal mine leading to 4 fatalities is illustrated by way of a case study. Horizontal and vertical profiles are prepared by geophysical methods to define the falling zone and its boundaries. The collapse is then modeled by the use of sophisticated computer programs in order to identify the causes of the accident.展开更多
Scheduling is a major concern in construction planning and management, and current construction simulation research typically targets the shortest total duration. However, uncertainties are inevitable in actual constr...Scheduling is a major concern in construction planning and management, and current construction simulation research typically targets the shortest total duration. However, uncertainties are inevitable in actual construction, which may lead to discrepancies between the actual and planned schedules and increase the risk of total duration delay. Therefore, developing a robust construction scheduling technique is of vital importance for mitigating disturbance and improving completion probability. In the present study, the authors propose a robustness analysis method that involves underground powerhouse construction simulation based on the Markov Chain Monte Carlo(MCMC) method. Specifically, the MCMC method samples construction disturbances by considering the interrelationship between the states of parameters through a Markov state transition probability matrix, which is more robust and efficient than traditional sampling methods such as the Monte Carlo(MC) method. Additionally, a hierarchical simulation model coupling critical path method(CPM) and a cycle operation network(CYCLONE) is built, using which construction duration and robustness criteria can be calculated. Furthermore, a detailed measurement method is presented to quantize the robustness of underground powerhouse construction, and the setting model of the time buffer is proposed based on the MCMC method. The application of this methodology not only considers duration but also robustness, providing scientific guidance for engineering decision making. We analyzed a case study project to demonstrate the effectiveness and superiority of the proposed methodology.展开更多
文摘Rock fall related accidents continue to occur in coal mines,although artificial support mechanisms have been used extensively. Roof stability is primarily determined in many underground mines by a limited number of methods that often resort to subjective criteria. It is argued in this paper that stability conditions of mine roof strata,as a key factor in sustainability in coal mines,must be determined by a survey which proactively investigates fundamental aspects of said mine. Failure of rock around the opening happens as a result of both high rock stress conditions and the presence of structural discontinuities. The properties of such discontinuities affect the engineering behavior of rock masses causing wedges or blocks to fall from the roof or sliding out of the walls. A practical rule-based approach to assess the risk of a roof fall is proposed in the paper. The method is based on the analysis of structural data and the geometry and stability of wedges in underground coal mines. In this regard,an accident causing a huge collapse in a coal mine leading to 4 fatalities is illustrated by way of a case study. Horizontal and vertical profiles are prepared by geophysical methods to define the falling zone and its boundaries. The collapse is then modeled by the use of sophisticated computer programs in order to identify the causes of the accident.
基金supported by the Innovative Research Groups of the National Natural Science Foundation of China(Grant No.51321065)the National Natural Science Foundation of China(Grant Nos.9121530151439005)
文摘Scheduling is a major concern in construction planning and management, and current construction simulation research typically targets the shortest total duration. However, uncertainties are inevitable in actual construction, which may lead to discrepancies between the actual and planned schedules and increase the risk of total duration delay. Therefore, developing a robust construction scheduling technique is of vital importance for mitigating disturbance and improving completion probability. In the present study, the authors propose a robustness analysis method that involves underground powerhouse construction simulation based on the Markov Chain Monte Carlo(MCMC) method. Specifically, the MCMC method samples construction disturbances by considering the interrelationship between the states of parameters through a Markov state transition probability matrix, which is more robust and efficient than traditional sampling methods such as the Monte Carlo(MC) method. Additionally, a hierarchical simulation model coupling critical path method(CPM) and a cycle operation network(CYCLONE) is built, using which construction duration and robustness criteria can be calculated. Furthermore, a detailed measurement method is presented to quantize the robustness of underground powerhouse construction, and the setting model of the time buffer is proposed based on the MCMC method. The application of this methodology not only considers duration but also robustness, providing scientific guidance for engineering decision making. We analyzed a case study project to demonstrate the effectiveness and superiority of the proposed methodology.