期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
地下铁路——奔向自由的星光之路
1
作者 郑伟 《信息技术教育》 2003年第13期73-74,共2页
本栏目的两篇课例来自同一所学校,由英语教师编译国外的优秀WebQuest课例,然后以此为蓝本,鼓励、协助和指导同校的历史教师进行网络探究教学。本刊编辑部对这种合作方式深表赞赏,并欢迎更多学校的教师采用这种办法,以更好地博取国外之长。
关键词 历史课 网络探究教学 WEBQUEST “地下铁路” 中学
下载PDF
Influence and Control Strategy for Local Settlement for High-Speed Railway Infrastructure 被引量:5
2
作者 Gaoliang Kang 《Engineering》 SCIE EI 2016年第3期374-379,共6页
This paper discusses the main impact factors of the local settlement and differential settlement of high- speed railway lines. The analysis results show that groundwater exploitation is the direct cause of differ- ent... This paper discusses the main impact factors of the local settlement and differential settlement of high- speed railway lines. The analysis results show that groundwater exploitation is the direct cause of differ- ential settlement. Based on the study of ballastless track additional load and of vehicle, track, and bridge dynamic responses under different differential settlements, a control standard of differential settlement during operation is proposed preliminarily. 展开更多
关键词 Local settlement Differential settlement Additional load of ballastless track Vehicle and track dynamics
下载PDF
Study on influence of ground settlement in bored metro tunnel
3
作者 方江华 张志红 《Journal of Coal Science & Engineering(China)》 2006年第2期27-29,共3页
At present the bored construction method is one of the main construction methods of metro and tunnel construction in China. The empirical estimated formulas of tunnel ground surface settlement using the bored construc... At present the bored construction method is one of the main construction methods of metro and tunnel construction in China. The empirical estimated formulas of tunnel ground surface settlement using the bored construction method were obtained, combining the mechanical stimulant calculated result of tunnel model of different embedded depth, different cross section and different construction method and the actual measurement data of Beijing metro construction. According to the regressed analysis of calculated data, the calculated equations of ground surface settlement value and settlement range of tunnel section under the condition of different embedded depth, different cross section and different construction method were gained. Among them there are some empirical formulas can apply to the construction design of metro tunnel directly. 展开更多
关键词 bored construction method ground settlement settlement groove width modulus settlement range
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部