This paper discusses the main impact factors of the local settlement and differential settlement of high- speed railway lines. The analysis results show that groundwater exploitation is the direct cause of differ- ent...This paper discusses the main impact factors of the local settlement and differential settlement of high- speed railway lines. The analysis results show that groundwater exploitation is the direct cause of differ- ential settlement. Based on the study of ballastless track additional load and of vehicle, track, and bridge dynamic responses under different differential settlements, a control standard of differential settlement during operation is proposed preliminarily.展开更多
At present the bored construction method is one of the main construction methods of metro and tunnel construction in China. The empirical estimated formulas of tunnel ground surface settlement using the bored construc...At present the bored construction method is one of the main construction methods of metro and tunnel construction in China. The empirical estimated formulas of tunnel ground surface settlement using the bored construction method were obtained, combining the mechanical stimulant calculated result of tunnel model of different embedded depth, different cross section and different construction method and the actual measurement data of Beijing metro construction. According to the regressed analysis of calculated data, the calculated equations of ground surface settlement value and settlement range of tunnel section under the condition of different embedded depth, different cross section and different construction method were gained. Among them there are some empirical formulas can apply to the construction design of metro tunnel directly.展开更多
基金supported by the National Nature Science Foundation of China (U1234206 and 61503311)+4 种基金support under the Railways Technology Development Plan of China Railway Corporation (2016X008-J)the Fundamental Research Funds for the Central Universities (2682015CX039)supported by the National United Engineering Laboratory of Integrated and Intelligent Transportation
文摘This paper discusses the main impact factors of the local settlement and differential settlement of high- speed railway lines. The analysis results show that groundwater exploitation is the direct cause of differ- ential settlement. Based on the study of ballastless track additional load and of vehicle, track, and bridge dynamic responses under different differential settlements, a control standard of differential settlement during operation is proposed preliminarily.
文摘At present the bored construction method is one of the main construction methods of metro and tunnel construction in China. The empirical estimated formulas of tunnel ground surface settlement using the bored construction method were obtained, combining the mechanical stimulant calculated result of tunnel model of different embedded depth, different cross section and different construction method and the actual measurement data of Beijing metro construction. According to the regressed analysis of calculated data, the calculated equations of ground surface settlement value and settlement range of tunnel section under the condition of different embedded depth, different cross section and different construction method were gained. Among them there are some empirical formulas can apply to the construction design of metro tunnel directly.