期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
TMP47C837“工厂状态”的锁定
1
作者 周作仁 《家电维修》 2003年第6期8-8,共1页
关键词 彩电 光栅 TMP47C837 检修 “工厂状态”
下载PDF
Getting Free Heat Energy Based on Cavitation and Nuclear Fusion according to Revinov's Pilot Plants
2
作者 Daurenbek Azenuly AUBAKIR 《Journal of Physical Science and Application》 2016年第3期44-54,共11页
In this report, the author describes and compares two innovative processes for producing thermal energy based on cavitation and nuclear fusion reactions in the indoor environment. Experiments conducted in the laborato... In this report, the author describes and compares two innovative processes for producing thermal energy based on cavitation and nuclear fusion reactions in the indoor environment. Experiments conducted in the laboratory IHS (Intensive Heating System) of IE "Revinov N. M." indicate that the process of lasso-vortex cavitation, which generates by means of an electric arc obtained HV-EI, gas-liquid plasma state in the EHH-CTC (electro-hydraulic heater with cavitation thermal camera) is not inferior and sometimes even superior in heat transfer to NF-AC (nuclear fusion reactions in ambient conditions). 展开更多
关键词 Free energy lasso-vortex cavitation electric arc gas-liquid plasma electro-hydraulic heater cold nuclear fusion inambient conditions.
下载PDF
Robustness analysis of underground powerhouse construction simulation based on Markov Chain Monte Carlo method 被引量:6
3
作者 ZHONG DengHua BI Lei +1 位作者 YU Jia ZHAO MengQi 《Science China(Technological Sciences)》 SCIE EI CAS CSCD 2016年第2期252-264,共13页
Scheduling is a major concern in construction planning and management, and current construction simulation research typically targets the shortest total duration. However, uncertainties are inevitable in actual constr... Scheduling is a major concern in construction planning and management, and current construction simulation research typically targets the shortest total duration. However, uncertainties are inevitable in actual construction, which may lead to discrepancies between the actual and planned schedules and increase the risk of total duration delay. Therefore, developing a robust construction scheduling technique is of vital importance for mitigating disturbance and improving completion probability. In the present study, the authors propose a robustness analysis method that involves underground powerhouse construction simulation based on the Markov Chain Monte Carlo(MCMC) method. Specifically, the MCMC method samples construction disturbances by considering the interrelationship between the states of parameters through a Markov state transition probability matrix, which is more robust and efficient than traditional sampling methods such as the Monte Carlo(MC) method. Additionally, a hierarchical simulation model coupling critical path method(CPM) and a cycle operation network(CYCLONE) is built, using which construction duration and robustness criteria can be calculated. Furthermore, a detailed measurement method is presented to quantize the robustness of underground powerhouse construction, and the setting model of the time buffer is proposed based on the MCMC method. The application of this methodology not only considers duration but also robustness, providing scientific guidance for engineering decision making. We analyzed a case study project to demonstrate the effectiveness and superiority of the proposed methodology. 展开更多
关键词 underground powerhouse construction schedule simulation model MCMC method ROBUSTNESS
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部