期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
“物权法定”与城市规划公共政策属性关系之辨析 被引量:2
1
作者 吴志城 赵民 《北京规划建设》 2008年第1期15-18,共4页
历经13载,《中华人民共和国物权法》(以下简称《物权法》)终于在2007年3月16日获得全国人大通过,并于同年10月1日起正式实施。这标志着我国的社会主义市场经济制度建设及法制建设迈入一个新的历史阶段。
关键词 “物权法定” 城市规划 公共政策 属性关系 法》
下载PDF
Reserve estimation of an open pit mine under price uncertainty by real option approach 被引量:8
2
作者 AKBARI Afshin Dehkharghani OSANLOO Morteza SHIRAZI Mohsen Akbarpour 《Mining Science and Technology》 EI CAS 2009年第6期709-717,共9页
Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a hig... Reserve estimation is a key to find the correct NPV in a mining project. The most important factor in reserve estimation is the metal price. Metal price fluctuations in recent years were exaggerated, and imposed a high degree of uncertainty to the reserve estimation, and in consequence to the whole mine planning procedure. Real option approach is an efficient method of decision making in the uncertain conditions. This approach has been used for evaluation of defined natural resources projects until now. This study considering the metal price uncertainty used real option approach to prepare a methodology for reserve estimation in open pit mines. This study was done on a copper cylindrical deposit, but the achieved methodology can be adjusted for all kinds of deposits. This methodology was comprehensively described through the examples in such a manner that can be used by the mine planners. 展开更多
关键词 RESERVE open pit mining metal price uncertainty Real Option Approach (ROA) copper deposit
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部