期刊文献+
共找到453,728篇文章
< 1 2 250 >
每页显示 20 50 100
Construction of Rail Connectivity from Idapalli to International Container Transhipment Terminal(ICTT)at Vallarpadam,Kochi
1
作者 Prakash Bansod 《Journal of Civil Engineering and Architecture》 2024年第1期12-16,共5页
Cochin Port is an all-weather port situated within a protected natural harbour,just 11 km away from mainland shipping route.Total draft of 15m-16m is available and it is a natural choice for setting up transhipment hu... Cochin Port is an all-weather port situated within a protected natural harbour,just 11 km away from mainland shipping route.Total draft of 15m-16m is available and it is a natural choice for setting up transhipment hub.The International Container Transhipment Terminal(ICTT)at Vallarpadam was developed by DP World and M/s Cochin Port Trust(CPT).As a part of this project,the new Rail connectivity from ICTT at Vallarpadam to Idappalli station is 8.60km,including the construction of 4.62 km elevated bridge was awarded to AFCONS by M/s Rail Vikas Nigam Limited(RVNL),in 2007 with a scheduled completion by 2009.This bridge is constructed for single railway track and piling was done for the provision of a second railway track in future.The 4.62 km long bridge was successfully completed and Trial Loco run was done in March 2010.This paper includes details of sub-surface profile,engineering properties of soils,details of construction of pile foundations and Challenges faced during construction. 展开更多
关键词 Transhipment transportation hub RAILWAY construction
下载PDF
Review of the Ten-Year Construction of China-Africa Belt and Road in People-to-people Connectivity and the Outlook
2
作者 Li Min Hu Wenxiu 《China's Foreign Trade》 2023年第4期38-41,共4页
It has been ten years since the Belt and Road Initiative was put forward in 2013.Since then,the Belt and Road Construction between China and Africa has achieved significant results,and has not only brought about tangi... It has been ten years since the Belt and Road Initiative was put forward in 2013.Since then,the Belt and Road Construction between China and Africa has achieved significant results,and has not only brought about tangible benefits to Africans by boosting policy,infrastructure,trade and finance connectivity over the last decade,but has also strengthened the understanding of the Belt and Road Initiative among Africans through enhancing people-to-people connectivity by focusing on humanistic exchanges and cooperation. 展开更多
关键词 FINANCE OUTLOOK connectivity
下载PDF
China Communications Construction Company Limited Holds the 10th Anniversary Event of Joint Construction of the Belt and Road Initiative,an Activity of Action on the Silk Road People-to-People Connectivity
3
《International Understanding》 2023年第4期57-58,共2页
On December 15th,2023,under the guidance of China NGO Network for International Exchanges(CNIE),the China Public Diplomacy Association,and the SASAC News Centre,China Communications Construction Company Limited(CCC)su... On December 15th,2023,under the guidance of China NGO Network for International Exchanges(CNIE),the China Public Diplomacy Association,and the SASAC News Centre,China Communications Construction Company Limited(CCC)successfully held the 10th Anniversary Event of Joint Construction of the Belt and Road Initiative in Beijing with the theme of"In the Prosperous Silk Road's Glow,Together We Construct a Brighter Tomorrow". 展开更多
关键词 ROAD TOGETHER connectivity
下载PDF
Research Progress and Prospects of Total Factor Productivity in the Construction Industry 被引量:1
4
作者 Chen WANG Shijie YU +2 位作者 Chenhao LIANG Lidan CAI Xiaohong XIONG 《Asian Agricultural Research》 2024年第7期39-41,共3页
The high-quality development of the construction industry fundamentally stems from the significant improvement of total factor productivity.Therefore,it is of crucial significance for promoting the development of the ... The high-quality development of the construction industry fundamentally stems from the significant improvement of total factor productivity.Therefore,it is of crucial significance for promoting the development of the construction industry to a higher level by scientifically and accurately measuring the total factor productivity of the construction industry and deeply analyzing the influencing factors behind it.Based on a comprehensive consideration of research methods and influencing factors,this paper systematically reviews the existing relevant literature on total factor productivity in the construction industry,aiming to reveal the current research development trend in this field and point out potential problems.This effort aims to provide a solid theoretical foundation and valuable reference for further in-depth research,and jointly promote the continuous progress and development of total factor productivity research in the construction industry. 展开更多
关键词 construction industry Total factor productivity Research progress Influence factor Theoretical basis
下载PDF
A divergent pattern in functional connectivity: a transdiagnostic perspective
5
作者 Lu Zhang Lorenzo Pini 《Neural Regeneration Research》 SCIE CAS CSCD 2024年第9期1885-1886,共2页
Functional magnetic resonance imaging(fMRI)is a popular tool used to investigate not only how the brain responds to specific stimuli during sensorimotor or cognitive tasks,but also brain activity at rest.The physics b... Functional magnetic resonance imaging(fMRI)is a popular tool used to investigate not only how the brain responds to specific stimuli during sensorimotor or cognitive tasks,but also brain activity at rest.The physics beyond this approach is based on the analysis of the blood oxygenation level-dependent signal. 展开更多
关键词 PATTERN connectivity FUNCTIONAL
下载PDF
Research on Quantitative Identification of Three-Dimensional Connectivity of Fractured-Vuggy Reservoirs
6
作者 Xingliang Deng Peng Cao +3 位作者 Yintao Zhang Yuhui Zhou Xiao Luo Liang Wang 《Energy Engineering》 EI 2024年第5期1195-1207,共13页
The fractured-vuggy carbonate oil resources in the western basin of China are extremely rich.The connectivity of carbonate reservoirs is complex,and there is still a lack of clear understanding of the development and ... The fractured-vuggy carbonate oil resources in the western basin of China are extremely rich.The connectivity of carbonate reservoirs is complex,and there is still a lack of clear understanding of the development and topological structure of the pore space in fractured-vuggy reservoirs.Thus,effective prediction of fractured-vuggy reservoirs is difficult.In view of this,this work employs adaptive point cloud technology to reproduce the shape and capture the characteristics of a fractured-vuggy reservoir.To identify the complex connectivity among pores,fractures,and vugs,a simplified one-dimensional connectivity model is established by using the meshless connection element method(CEM).Considering that different types of connection units have different flow characteristics,a sequential coupling calculation method that can efficiently calculate reservoir pressure and saturation is developed.By automatic history matching,the dynamic production data is fitted in real-time,and the characteristic parameters of the connection unit are inverted.Simulation results show that the three-dimensional connectivity model of the fractured-vuggy reservoir built in this work is as close as 90%of the fine grid model,while the dynamic simulation efficiency is much higher with good accuracy. 展开更多
关键词 Fractured-vuggy reservoir three-dimensional connectivity connection unit dynamic prediction automatic history matching
下载PDF
Structural and functional connectivity of the whole brain and subnetworks in individuals with mild traumatic brain injury:predictors of patient prognosis
7
作者 Sihong Huang Jungong Han +4 位作者 Hairong Zheng Mengjun Li Chuxin Huang Xiaoyan Kui Jun Liu 《Neural Regeneration Research》 SCIE CAS CSCD 2024年第7期1553-1558,共6页
Patients with mild traumatic brain injury have a diverse clinical presentation,and the underlying pathophysiology remains poorly understood.Magnetic resonance imaging is a non-invasive technique that has been widely u... Patients with mild traumatic brain injury have a diverse clinical presentation,and the underlying pathophysiology remains poorly understood.Magnetic resonance imaging is a non-invasive technique that has been widely utilized to investigate neuro biological markers after mild traumatic brain injury.This approach has emerged as a promising tool for investigating the pathogenesis of mild traumatic brain injury.G raph theory is a quantitative method of analyzing complex networks that has been widely used to study changes in brain structure and function.However,most previous mild traumatic brain injury studies using graph theory have focused on specific populations,with limited exploration of simultaneous abnormalities in structural and functional connectivity.Given that mild traumatic brain injury is the most common type of traumatic brain injury encounte red in clinical practice,further investigation of the patient characteristics and evolution of structural and functional connectivity is critical.In the present study,we explored whether abnormal structural and functional connectivity in the acute phase could serve as indicators of longitudinal changes in imaging data and cognitive function in patients with mild traumatic brain injury.In this longitudinal study,we enrolled 46 patients with mild traumatic brain injury who were assessed within 2 wee ks of injury,as well as 36 healthy controls.Resting-state functional magnetic resonance imaging and diffusion-weighted imaging data were acquired for graph theoretical network analysis.In the acute phase,patients with mild traumatic brain injury demonstrated reduced structural connectivity in the dorsal attention network.More than 3 months of followup data revealed signs of recovery in structural and functional connectivity,as well as cognitive function,in 22 out of the 46 patients.Furthermore,better cognitive function was associated with more efficient networks.Finally,our data indicated that small-worldness in the acute stage could serve as a predictor of longitudinal changes in connectivity in patients with mild traumatic brain injury.These findings highlight the importance of integrating structural and functional connectivity in unde rstanding the occurrence and evolution of mild traumatic brain injury.Additionally,exploratory analysis based on subnetworks could serve a predictive function in the prognosis of patients with mild traumatic brain injury. 展开更多
关键词 cognitive function CROSS-SECTION FOLLOW-UP functional connectivity graph theory longitudinal study mild traumatic brain injury prediction small-worldness structural connectivity subnetworks whole brain network
下载PDF
Intelligent Sensing and Control of Road Construction Robot Scenes Based on Road Construction
8
作者 Zhongping Chen Weigong Zhang 《Structural Durability & Health Monitoring》 EI 2024年第2期111-124,共14页
Automatic control technology is the basis of road robot improvement,according to the characteristics of construction equipment and functions,the research will be input type perception from positioning acquisition,real... Automatic control technology is the basis of road robot improvement,according to the characteristics of construction equipment and functions,the research will be input type perception from positioning acquisition,real-world monitoring,the process will use RTK-GNSS positional perception technology,by projecting the left side of the earth from Gauss-Krueger projection method,and then carry out the Cartesian conversion based on the characteristics of drawing;steering control system is the core of the electric drive unmanned module,on the basis of the analysis of the composition of the steering system of unmanned engineering vehicles,the steering system key components such as direction,torque sensor,drive motor and other models are established,the joint simulation model of unmanned engineering vehicles is established,the steering controller is designed using the PID method,the simulation results show that the control method can meet the construction path demand for automatic steering.The path planning will first formulate the construction area with preset values and realize the steering angle correction during driving by PID algorithm,and never realize the construction-based path planning,and the results show that the method can control the straight path within the error of 10 cm and the curve error within 20 cm.With the collaboration of various modules,the automatic construction simulation results of this robot show that the design path and control method is effective. 展开更多
关键词 Scene perception remote control technology cartesian coordinate system construction robot highway construction
下载PDF
Functional connectivity of paired default mode network subregions in patients with eye trauma
9
作者 Zheng-Mao Xing Dan Song +12 位作者 Jin-Yu Hu Xian-Mei Zhou Xuan Liao Cheng Chen Hong Wei Min Kang Qian Ling Liang-Qi He Zhen-Zhe Liu Jie Zou Xu Chen Zhen-Kai Wu Yi Shao 《International Journal of Ophthalmology(English edition)》 SCIE CAS 2024年第12期2248-2255,共8页
AIM:To study functional brain abnormalities in patients with eye trauma(ET)and to discuss the pathophysiological mechanisms of ET.METHODS:Totally 31 ET patients and 31 healthy controls(HCs)were recruited.The age,gende... AIM:To study functional brain abnormalities in patients with eye trauma(ET)and to discuss the pathophysiological mechanisms of ET.METHODS:Totally 31 ET patients and 31 healthy controls(HCs)were recruited.The age,gender,and educational background characteristics of the two groups were similar.After functional magnetic resonance imaging(fMRI)scanning,the subjects’spontaneous brain activity was evaluated with the functional connectivity(FC)method.Receiver operating characteristic(ROC)curve analysis was used to classify the data.Pearson’s correlation analysis was used to explore the relationship between FC values in specific brain regions and clinical behaviors in patients with ET.RESULTS:Significantly increased FC between several regions was identified including the medial prefrontal cortex(MPFC)and left hippocampus formations(HF),the MPFC and left inferior parietal lobule(IPL),the left IPL and left medial temporal lobe(MTL),the left IPL and right MTL,and the right IPL and left MTL.No decreased region-to-region connectivity was detected in default mode network(DMN)sub-regions in patients with ET.Compared with HCs,ET patients exhibited significantly increased FC between several paired DMN regions,as follows:posterior cingulate cortex(PCC)and right HF(HF.R,t=2.196,P=0.032),right inferior parietal cortices(IPC.R)and left MTL(MTL.L,t=2.243,P=0.029),and right MTL(MTL.R)and HF.R(t=2.236,P=0.029).CONCLUSION:FC values in multiple brain regions of ET patients are abnormal,suggesting that these brain regions in ET patients may be dysfunctional,which may help to reveal the pathophysiological mechanisms of ET. 展开更多
关键词 eye trauma functional connectivity brain region
下载PDF
Properties and Characteristics of Regolith-Based Materials for Extraterrestrial Construction
10
作者 Cheng Zhou Yuyue Gao +4 位作者 Yan Zhou Wei She Yusheng Shi Lieyun Ding Changwen Miao 《Engineering》 SCIE EI CAS CSCD 2024年第6期159-181,共23页
The construction of extraterrestrial bases has become a new goal in the active exploration of deep space.Among the construction techniques,in situ resource-based construction is one of the most promising because of it... The construction of extraterrestrial bases has become a new goal in the active exploration of deep space.Among the construction techniques,in situ resource-based construction is one of the most promising because of its good sustainability and acceptable economic cost,triggering the development of various types of extraterrestrial construction materials.A comprehensive survey and comparison of materials from the perspective of performance was conducted to provide suggestions for material selection and optimization.Thirteen types of typical construction materials are discussed in terms of their reliability and applicability in extreme extraterrestrial environment.Mechanical,thermal and optical,and radiation-shielding properties are considered.The influencing factors and optimization methods for these properties are analyzed.From the perspective of material properties,the existing challenges lie in the comprehensive,long-term,and real characterization of regolith-based construction materials.Correspondingly,the suggested future directions include the application of high-throughput characterization methods,accelerated durability tests,and conducting extraterrestrial experiments. 展开更多
关键词 Extraterrestrial construction Characterization Mechanical property Thermal property Optical property Radiation-shielding
下载PDF
Construction Activity Analysis of Workers Based on Human Posture Estimation Information
11
作者 Xuhong Zhou Shuai Li +2 位作者 Jiepeng Liu Zhou Wu Yohchia Frank Chen 《Engineering》 SCIE EI CAS CSCD 2024年第2期225-236,共12页
Identifying workers’construction activities or behaviors can enable managers to better monitor labor efficiency and construction progress.However,current activity analysis methods for construction workers rely solely... Identifying workers’construction activities or behaviors can enable managers to better monitor labor efficiency and construction progress.However,current activity analysis methods for construction workers rely solely on manual observations and recordings,which consumes considerable time and has high labor costs.Researchers have focused on monitoring on-site construction activities of workers.However,when multiple workers are working together,current research cannot accu rately and automatically identify the construction activity.This research proposes a deep learning framework for the automated analysis of the construction activities of multiple workers.In this framework,multiple deep neural network models are designed and used to complete worker key point extraction,worker tracking,and worker construction activity analysis.The designed framework was tested at an actual construction site,and activity recognition for multiple workers was performed,indicating the feasibility of the framework for the automated monitoring of work efficiency. 展开更多
关键词 Pose estimation Activity analysis Object tracking construction workers Automatic systems
下载PDF
Promoting grain production through high-standard farmland construction:Evidence in China
12
作者 Shuai Hao Guogang Wang +4 位作者 Yantao Yang Sicheng Zhao Shengnan Huang Liping Liu Huanhuan Zhang 《Journal of Integrative Agriculture》 SCIE CSCD 2024年第1期324-335,共12页
Food security is a strategic priority for a country’s economic development.In China,high-standard farmland construction(HSFC)is an important initiative to stabilize grain production and increase grain production capa... Food security is a strategic priority for a country’s economic development.In China,high-standard farmland construction(HSFC)is an important initiative to stabilize grain production and increase grain production capacity.Based on panel data from 31 sample provinces,autonomous regions,and municipalities in China from 2005–2017,this study explored the impact of HSFC on grain yield using the difference-in-differences(DID)method.The results showed that HSFC significantly increased total grain production,which is robust to various checks.HSFC increased grain yield through three potential mechanisms.First,it could increase the grain replanting index.Second,it could effectively reduce yield loss due to droughts and floods.Last,HSFC could strengthen the cultivated land by renovating the low-and medium-yielding fields.Heterogeneity analysis found that the HSFC farmland showed a significant increase in grain yield only in the main grain-producing areas and balanced areas.In addition,HSFC significantly increased the yields of rice,wheat,and maize while leading to a reduction in soybean yields.The findings suggest the government should continue to promote HSFC,improve construction standards,and strictly control the“non-agriculturalization”and“non-coordination”of farmland to increase grain production further.At the same time,market mechanisms should be used to incentivize soybean farming,improve returns and stabilize soybean yields. 展开更多
关键词 high-standard farmland farmland construction food security food production area DIFFERENCE-IN-DIFFERENCES
下载PDF
Application of Modern Construction Art in Landscape Architecture Planning and Design
13
作者 JIANG Yuanyuan 《Journal of Landscape Research》 2024年第3期43-47,共5页
The continuous progress of urbanization has driven the continuous development and innovation of landscape planning and design.Focused on the important design method of modern construction art,this study analyzed its c... The continuous progress of urbanization has driven the continuous development and innovation of landscape planning and design.Focused on the important design method of modern construction art,this study analyzed its concepts and characteristics,and made deep exploration to its application in landscape planning and design.The results indicated that modern construction art had a significant impact on landscape spatial planning and layout,spatial design forms,and spatial ornaments.The use of modern construction art concepts could make landscape design more scientific,artistic,and humane,creating higher quality leisure and entertainment venues for audiences. 展开更多
关键词 Landscape architecture design Modern construction art construction Art
下载PDF
PCB CT Image Element Segmentation Model Optimizing the Semantic Perception of Connectivity Relationship
14
作者 Chen Chen Kai Qiao +2 位作者 Jie Yang Jian Chen Bin Yan 《Computers, Materials & Continua》 SCIE EI 2024年第11期2629-2642,共14页
Computed Tomography(CT)is a commonly used technology in Printed Circuit Boards(PCB)non-destructive testing,and element segmentation of CT images is a key subsequent step.With the development of deep learning,researche... Computed Tomography(CT)is a commonly used technology in Printed Circuit Boards(PCB)non-destructive testing,and element segmentation of CT images is a key subsequent step.With the development of deep learning,researchers began to exploit the“pre-training and fine-tuning”training process for multi-element segmentation,reducing the time spent on manual annotation.However,the existing element segmentation model only focuses on the overall accuracy at the pixel level,ignoring whether the element connectivity relationship can be correctly identified.To this end,this paper proposes a PCB CT image element segmentation model optimizing the semantic perception of connectivity relationship(OSPC-seg).The overall training process adopts a“pre-training and fine-tuning”training process.A loss function that optimizes the semantic perception of circuit connectivity relationship(OSPC Loss)is designed from the aspect of alleviating the class imbalance problem and improving the correct connectivity rate.Also,the correct connectivity rate index(CCR)is proposed to evaluate the model’s connectivity relationship recognition capabilities.Experiments show that mIoU and CCR of OSPC-seg on our datasets are 90.1%and 97.0%,improved by 1.5%and 1.6%respectively compared with the baseline model.From visualization results,it can be seen that the segmentation performance of connection positions is significantly improved,which also demonstrates the effectiveness of OSPC-seg. 展开更多
关键词 Semantic segmentation PCB non-destructive testing mask image modeling connectivity relationship
下载PDF
Joint Allocation of Computing and Connectivity Resources in Survivable Inter-Datacenter Elastic Optical Networks
15
作者 Yang Tao Li Yang Chen Xue 《China Communications》 SCIE CSCD 2024年第8期172-181,共10页
Inter-datacenter elastic optical networks(EON)need to provide the service for the requests of cloud computing that require not only connectivity and computing resources but also network survivability.In this paper,to ... Inter-datacenter elastic optical networks(EON)need to provide the service for the requests of cloud computing that require not only connectivity and computing resources but also network survivability.In this paper,to realize joint allocation of computing and connectivity resources in survivable inter-datacenter EONs,a survivable routing,modulation level,spectrum,and computing resource allocation algorithm(SRMLSCRA)algorithm and three datacenter selection strategies,i.e.Computing Resource First(CRF),Shortest Path First(SPF)and Random Destination(RD),are proposed for different scenarios.Unicast and manycast are applied to the communication of computing requests,and the routing strategies are calculated respectively.Simulation results show that SRMLCRA-CRF can serve the largest amount of protected computing tasks,and the requested calculation blocking probability is reduced by 29.2%,28.3%and 30.5%compared with SRMLSCRA-SPF,SRMLSCRA-RD and the benchmark EPS-RMSA algorithms respectively.Therefore,it is more applicable to the networks with huge calculations.Besides,SRMLSCRA-SPF consumes the least spectrum,thereby exhibiting its suitability for scenarios where the amount of calculation is small and communication resources are scarce.The results demonstrate that the proposed methods realize the joint allocation of computing and connectivity resources,and could provide efficient protection for services under single-link failure and occupy less spectrum. 展开更多
关键词 computing and connectivity interdatacenter networks joint resource allocation service protection
下载PDF
Dynamic interwell connectivity analysis of multi-layer waterflooding reservoirs based on an improved graph neural network
16
作者 Zhao-Qin Huang Zhao-Xu Wang +4 位作者 Hui-Fang Hu Shi-Ming Zhang Yong-Xing Liang Qi Guo Jun Yao 《Petroleum Science》 SCIE EI CAS CSCD 2024年第2期1062-1080,共19页
The analysis of interwell connectivity plays an important role in the formulation of oilfield development plans and the description of residual oil distribution. In fact, sandstone reservoirs in China's onshore oi... The analysis of interwell connectivity plays an important role in the formulation of oilfield development plans and the description of residual oil distribution. In fact, sandstone reservoirs in China's onshore oilfields generally have the characteristics of thin and many layers, so multi-layer joint production is usually adopted. It remains a challenge to ensure the accuracy of splitting and dynamic connectivity in each layer of the injection-production wells with limited field data. The three-dimensional well pattern of multi-layer reservoir and the relationship between injection-production wells can be equivalent to a directional heterogeneous graph. In this paper, an improved graph neural network is proposed to construct an interacting process mimics the real interwell flow regularity. In detail, this method is used to split injection and production rates by combining permeability, porosity and effective thickness, and to invert the dynamic connectivity in each layer of the injection-production wells by attention mechanism.Based on the material balance and physical information, the overall connectivity from the injection wells,through the water injection layers to the production layers and the output of final production wells is established. Meanwhile, the change of well pattern caused by perforation, plugging and switching of wells at different times is achieved by updated graph structure in spatial and temporal ways. The effectiveness of the method is verified by a combination of reservoir numerical simulation examples and field example. The method corresponds to the actual situation of the reservoir, has wide adaptability and low cost, has good practical value, and provides a reference for adjusting the injection-production relationship of the reservoir and the development of the remaining oil. 展开更多
关键词 Graph neural network Dynamic interwell connectivity Production-injection splitting Attention mechanism Multi-layer reservoir
下载PDF
Soft connectivity of standards boosts high-quality Belt and Road development
17
作者 Zhang Xiaoping 《China Standardization》 2024年第6期26-27,共2页
Shaanxi province serves as an important part in the Belt and Road cooperation,which is also at the forefront of China’s westward opening up.It also shoulders the significant missions of implementing national strategi... Shaanxi province serves as an important part in the Belt and Road cooperation,which is also at the forefront of China’s westward opening up.It also shoulders the significant missions of implementing national strategies including the ecological protection and high-quality development of the Yellow River Basin and the Western Region Development Strategy. 展开更多
关键词 boost ROAD connectivity
下载PDF
Friction Characteristics Between Marine Clay and Construction Materials
18
作者 KOU Hailei HUANG Jiaming CHENG Yang 《Journal of Ocean University of China》 CAS CSCD 2024年第2期427-437,共11页
Structure-soil interface friction characteristics is of importance to investigate the interaction between engineering structures and soils,especially for offshore structures.The interface friction behavior between mar... Structure-soil interface friction characteristics is of importance to investigate the interaction between engineering structures and soils,especially for offshore structures.The interface friction behavior between marine clay and structural materials with different roughness was studied in this paper by using 3D optical scanning tests,a modified direct shear device and numerical simulation.Relationships between the surface roughness of structures,water content and interface friction angle were presented by model tests.The increase of water contents decreased the interface friction angles.For interfaces with different roughness,the interface friction angles will be smaller than that of the soil when the water content exceeds a certain value.The roughness of the interface and the water content of the soil are mutually coupled to influence the coefficient of friction(COF).This paper proposed a Finite Element Method(FEM)to simulate the interface direct shear tests of structures with different roughness.The surface models with different roughness are established based on the structure data obtained by 3D scanning.The Coupled Eulerian-Lagrangian(CEL)approach was employed to analyse soils sheared by irregular surfaces.The interface behavior for interfaces with different roughness under cyclic shear stresses was analyzed by FEM. 展开更多
关键词 marine clay construction material interface friction behavior surface roughness Finite Element Method
下载PDF
Work-Related Accidents on a Hospital Construction Site in Benin
19
作者 Adjobimey Mênonli Mikponhoué Rose +5 位作者 Dégbey Cyriaque Hountohotègbé Esdras Guédou Alexandre Lawani Affousath Ayélo Paul Hinson Antoine 《Occupational Diseases and Environmental Medicine》 2024年第2期142-159,共18页
Introduction: Work-related accidents are frequent and serious in the construction sector. The aim of the study was to determine the frequency and factors associated with occupational accidents on the construction site... Introduction: Work-related accidents are frequent and serious in the construction sector. The aim of the study was to determine the frequency and factors associated with occupational accidents on the construction site of a referral hospital in Benin. Methods: A cross-sectional study was carried out. The sample size was calculated using the Schwartz form adjusted for the number of workers on site and was 129 workers. Random sampling was used. The dependent variable was work-related accidents. The other variables were socio-demographic and occupational characteristics. Data were collected through a questionnaire survey. Medians and proportions were calculated. An association was sought using Chi-square and Fisher tests with a threshold of p Results: A total of 132 workers were included. Their median age was 30 years with an ITQ of [27 - 38];men were the most represented 126 (95.45%) with a level of education higher than or equal to high school in 101 (76.52%) and in the majority with a permanent status 85 (64.39%). Seniority of more than 5 years was observed in 92 (69.7%). Workers working more than 8 hours of overtime per week numbered 57 (43.18%). Exposure to vibrating objects was 49 (37.12%). In terms of psychosocial constraints, 82.58% had high psychological demands;79.53% low decision-making latitude;50.76% low social support. The frequency of work-related accidents was 6.82%, and the only associated factor was the type of worker (p = 0.016). On the other hand, there were 10.2% accidents among workers handling vibrating objects versus 4.98% among those not using them. With regard to psychosocial constraints, the following frequencies were recorded respectively: 6.42% among those with high psychological demand versus 8.7% among those with low psychological demand;7.62% among those with low decision-making latitude versus 3.7% among those with high decision-making latitude;8.96% among those with low social support versus 4.62% among those with high support. Conclusion: Work-related accidents on construction sites must be avoided by all possible means including the management of psychosocial constraints. 展开更多
关键词 Occupational Injury Building and Civil Engineering construction ENVIRONMENT
下载PDF
A comprehensive review of lunar lava tube base construction and field research on a potential Earth test site
20
作者 Yujie Feng Peng-Zhi Pan +3 位作者 Xuhai Tang Zhaofeng Wang Yuxin Li Altaf Hussain 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2024年第9期1201-1216,共16页
The Moon,as the closest celestial body to the Earth,plays a pivotal role in the progression of deep space exploration,and the establishment of research outposts on its surface represents a crucial step in this mission... The Moon,as the closest celestial body to the Earth,plays a pivotal role in the progression of deep space exploration,and the establishment of research outposts on its surface represents a crucial step in this mission.Lunar lava tubes are special underground caves formed by volcanic eruptions and are considered as ideal natural shelters and scientific laboratories for lunar base construction.This paper begins with an in-depth overview of the geological origins,exploration history,and distribution locations of lunar lava tubes.Subsequently,it delves into the presentation of four distinctive advantages and typical concepts for constructing bases within lava tubes,summarizing the ground-based attempts made thus far in lunar lava tube base construction.Field studies conducted on a lava tube in Hainan revealed rock compositions similar to those found during the Apollo missions and clear lava tube structures,making it a promising analog site.Lastly,the challenges and opportunities encountered in the field of geotechnical engineering regarding the establishment of lunar lava tube bases are discussed,encompassing cave exploration technologies,in-situ testing methods,geomechanical properties under lunar extreme environments,base design and structural stability assessment,excavation and reinforcement techniques,and simulated Earth-based lava tube base. 展开更多
关键词 Lunar lava tube Lunar base construction Extraterrestrial cave exploration Earth analog site
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部