Marine container terminal(MCT)plays a key role in the marine intelligent transportation system and international logistics system.However,the efficiency of resource scheduling significantly influences the operation pe...Marine container terminal(MCT)plays a key role in the marine intelligent transportation system and international logistics system.However,the efficiency of resource scheduling significantly influences the operation performance of MCT.To solve the practical resource scheduling problem(RSP)in MCT efficiently,this paper has contributions to both the problem model and the algorithm design.Firstly,in the problem model,different from most of the existing studies that only consider scheduling part of the resources in MCT,we propose a unified mathematical model for formulating an integrated RSP.The new integrated RSP model allocates and schedules multiple MCT resources simultaneously by taking the total cost minimization as the objective.Secondly,in the algorithm design,a pre-selection-based ant colony system(PACS)approach is proposed based on graphic structure solution representation and a pre-selection strategy.On the one hand,as the RSP can be formulated as the shortest path problem on the directed complete graph,the graphic structure is proposed to represent the solution encoding to consider multiple constraints and multiple factors of the RSP,which effectively avoids the generation of infeasible solutions.On the other hand,the pre-selection strategy aims to reduce the computational burden of PACS and to fast obtain a higher-quality solution.To evaluate the performance of the proposed novel PACS in solving the new integrated RSP model,a set of test cases with different sizes is conducted.Experimental results and comparisons show the effectiveness and efficiency of the PACS algorithm,which can significantly outperform other state-of-the-art algorithms.展开更多
Petrol is a kind of strategic natural resources. Provide legitimate transportation plans for the petrol secondary distribution are the key links to guarantee the petrol provision. If the total supply is insufficient, ...Petrol is a kind of strategic natural resources. Provide legitimate transportation plans for the petrol secondary distribution are the key links to guarantee the petrol provision. If the total supply is insufficient, some petrol stations can’t avoid shortage because their demands could not be met. So the shortage cost will appear. This paper studies the problem of how to arrange the transportation plan in order to minimize the total cost when the total volume of supply is insufficient. Given the storage volume, the sales rate and the unit shortage cost of every petrol station, considering the full loading constraints of the compartment vehicle, a mixed integer programming model for minimizing the total cost of petrol secondary distribution is established. A Lingo program is compiled for solving the model. Finally, simulation on an example has been done and a reasonable transportation plan is obtained. The model and algorithm in this paper can provide a theoretical basis for dispatching department to make transportation plan.展开更多
In a general case, container ship serves many different ports on each voyage. A stowage planning for container ship made at one port must take account of the influence on subsequent ports. So the complexity of stowage...In a general case, container ship serves many different ports on each voyage. A stowage planning for container ship made at one port must take account of the influence on subsequent ports. So the complexity of stowage planning problem increases due to its multi-ports nature. This problem is NP-hard problem. In order to reduce the computational complexity, the problem is decomposed into two sub-problems in this paper. First, container ship stowage problem (CSSP) is regarded as 'packing problem', ship-bays on the board of vessel are regarded as bins, the number of slots at each bay are taken as capacities of bins, and containers with different characteristics (homogeneous containers group) are treated as items packed. At this stage, there are two objective functions, one is to minimize the number of bays packed by containers and the other is to minimize the number of overstows. Secondly, containers assigned to each bays at first stage are allocate to special slot, the objective functions are to minimize the metacentric height, heel and overstows.The taboo search heuristics algorithm are used to solve the subproblem. The main focus of this paper is on the first subproblem. A case certifies the feasibility of the model and algorithm.展开更多
Jeep problem is a kind of model of logistics in extreme situation, which has application in exploration and aircraft problems. The optimal distance and driving strategy of multiple jeeps problem are known. We consider...Jeep problem is a kind of model of logistics in extreme situation, which has application in exploration and aircraft problems. The optimal distance and driving strategy of multiple jeeps problem are known. We consider multiple jeeps problem with container restriction, which is more complicated in the proof of feasibility and optimality of a driving strategy. We investigate when it can achieve the same optimal distance as without restriction.Based on the non-restricted optimal distance, a new driving strategy is proposed. We provide the necessary and sufficient condition to ensure the feasibility of the strategy, and obtain the maximal feasible distance.展开更多
Using complex variable methods in elasticity, this paper deals with the plane problems ot a finite disc containing an internal linear crack at any position under general loads, obtains the general forms of Complex str...Using complex variable methods in elasticity, this paper deals with the plane problems ot a finite disc containing an internal linear crack at any position under general loads, obtains the general forms of Complex stress functions and stress-intensity tactors expressed in terms of series, and to these problems disiusses three sposial cases,i.e.the cases of the crack under a uniform pressure, a uniform shear stress and the use of the dise rotating uniformly. In these cases the approximate formulas calcidating the stress-intensity factors are also presented. The calculated results shun that for the middle and.small orachs situated inside the disc and not near the external boundary,these approximate formulas give good or better approximation.展开更多
The container loading problem (CLP) is a well-known NP-hard problem. Due to the computation complexity, heuristics is an often-sought approach. This article proposes two heuristics to pack homogeneous rectangular boxe...The container loading problem (CLP) is a well-known NP-hard problem. Due to the computation complexity, heuristics is an often-sought approach. This article proposes two heuristics to pack homogeneous rectangular boxes into a single container. Both algorithms adopt the concept of building layers on one face of the container, but the first heuristic determines the layer face once for all, while the second treats the remaining container space as a reduced-sized container after one layer is loaded and, hence, selects the layer face dynamically. To handle the layout design problem at a layer's level, a block-based 2D packing procedure is also developed. Numerical studies demonstrate the efficiency of the heuristics.展开更多
基金This research was supported in part by the National Key Research and Development Program of China under Grant 2022YFB3305303in part by the National Natural Science Foundations of China(NSFC)under Grant 62106055+1 种基金in part by the Guangdong Natural Science Foundation under Grant 2022A1515011825in part by the Guangzhou Science and Technology Planning Project under Grants 2023A04J0388 and 2023A03J0662.
文摘Marine container terminal(MCT)plays a key role in the marine intelligent transportation system and international logistics system.However,the efficiency of resource scheduling significantly influences the operation performance of MCT.To solve the practical resource scheduling problem(RSP)in MCT efficiently,this paper has contributions to both the problem model and the algorithm design.Firstly,in the problem model,different from most of the existing studies that only consider scheduling part of the resources in MCT,we propose a unified mathematical model for formulating an integrated RSP.The new integrated RSP model allocates and schedules multiple MCT resources simultaneously by taking the total cost minimization as the objective.Secondly,in the algorithm design,a pre-selection-based ant colony system(PACS)approach is proposed based on graphic structure solution representation and a pre-selection strategy.On the one hand,as the RSP can be formulated as the shortest path problem on the directed complete graph,the graphic structure is proposed to represent the solution encoding to consider multiple constraints and multiple factors of the RSP,which effectively avoids the generation of infeasible solutions.On the other hand,the pre-selection strategy aims to reduce the computational burden of PACS and to fast obtain a higher-quality solution.To evaluate the performance of the proposed novel PACS in solving the new integrated RSP model,a set of test cases with different sizes is conducted.Experimental results and comparisons show the effectiveness and efficiency of the PACS algorithm,which can significantly outperform other state-of-the-art algorithms.
文摘Petrol is a kind of strategic natural resources. Provide legitimate transportation plans for the petrol secondary distribution are the key links to guarantee the petrol provision. If the total supply is insufficient, some petrol stations can’t avoid shortage because their demands could not be met. So the shortage cost will appear. This paper studies the problem of how to arrange the transportation plan in order to minimize the total cost when the total volume of supply is insufficient. Given the storage volume, the sales rate and the unit shortage cost of every petrol station, considering the full loading constraints of the compartment vehicle, a mixed integer programming model for minimizing the total cost of petrol secondary distribution is established. A Lingo program is compiled for solving the model. Finally, simulation on an example has been done and a reasonable transportation plan is obtained. The model and algorithm in this paper can provide a theoretical basis for dispatching department to make transportation plan.
基金Supported by a Special Fund Support Item of Doctor Subject of Colleges and Universities (No. 2000014125)
文摘In a general case, container ship serves many different ports on each voyage. A stowage planning for container ship made at one port must take account of the influence on subsequent ports. So the complexity of stowage planning problem increases due to its multi-ports nature. This problem is NP-hard problem. In order to reduce the computational complexity, the problem is decomposed into two sub-problems in this paper. First, container ship stowage problem (CSSP) is regarded as 'packing problem', ship-bays on the board of vessel are regarded as bins, the number of slots at each bay are taken as capacities of bins, and containers with different characteristics (homogeneous containers group) are treated as items packed. At this stage, there are two objective functions, one is to minimize the number of bays packed by containers and the other is to minimize the number of overstows. Secondly, containers assigned to each bays at first stage are allocate to special slot, the objective functions are to minimize the metacentric height, heel and overstows.The taboo search heuristics algorithm are used to solve the subproblem. The main focus of this paper is on the first subproblem. A case certifies the feasibility of the model and algorithm.
基金supported by the Fundamental Research Funds for the Central Universities(WUT:2017 IVA 073)。
文摘Jeep problem is a kind of model of logistics in extreme situation, which has application in exploration and aircraft problems. The optimal distance and driving strategy of multiple jeeps problem are known. We consider multiple jeeps problem with container restriction, which is more complicated in the proof of feasibility and optimality of a driving strategy. We investigate when it can achieve the same optimal distance as without restriction.Based on the non-restricted optimal distance, a new driving strategy is proposed. We provide the necessary and sufficient condition to ensure the feasibility of the strategy, and obtain the maximal feasible distance.
文摘Using complex variable methods in elasticity, this paper deals with the plane problems ot a finite disc containing an internal linear crack at any position under general loads, obtains the general forms of Complex stress functions and stress-intensity tactors expressed in terms of series, and to these problems disiusses three sposial cases,i.e.the cases of the crack under a uniform pressure, a uniform shear stress and the use of the dise rotating uniformly. In these cases the approximate formulas calcidating the stress-intensity factors are also presented. The calculated results shun that for the middle and.small orachs situated inside the disc and not near the external boundary,these approximate formulas give good or better approximation.
基金the Natural Sciences and Engineering Research Council of Canada (NSERC) under the Discovery Grant Program
文摘The container loading problem (CLP) is a well-known NP-hard problem. Due to the computation complexity, heuristics is an often-sought approach. This article proposes two heuristics to pack homogeneous rectangular boxes into a single container. Both algorithms adopt the concept of building layers on one face of the container, but the first heuristic determines the layer face once for all, while the second treats the remaining container space as a reduced-sized container after one layer is loaded and, hence, selects the layer face dynamically. To handle the layout design problem at a layer's level, a block-based 2D packing procedure is also developed. Numerical studies demonstrate the efficiency of the heuristics.
文摘在分析影响集装箱的装载效率时,考虑场内拖车在码头堆场和岸边装卸桥之间的移动距离,将配载问题看成是以码头堆场B ay位上的集装箱为供给、船舶B ay上的空箱位为需求的运输问题,以场内拖车将码头堆场集装箱送到岸边装卸桥所运行的距离最短为目标,建立配载模型并应用Hop fie ld神经网络模型进行计算机模拟.模拟结果说明,所提出的优化模型可以减少场内拖车运行的距离,提高集装箱装载效率,为合理进行集装箱船配载提供了一个参考模型.