期刊文献+
共找到16篇文章
< 1 >
每页显示 20 50 100
Applying the vantage PDMS to jack-up drilling ships 被引量:2
1
作者 殷鹏 陈渊明 +3 位作者 崔同凯 王子申 巩立江 于香芬 《Journal of Marine Science and Application》 2009年第3期228-232,共5页
The plant design management system (PDMS) is an integrated application which includes a database and is useful when designing complex 3-D industrial projects. It could be used to simplify the most difficult part of ... The plant design management system (PDMS) is an integrated application which includes a database and is useful when designing complex 3-D industrial projects. It could be used to simplify the most difficult part of a subsea oil extraction project-detailed pipeline design. It could also be used to integrate the design of equipment, structures, HVAC, E-ways as well as the detailed designs of other specialists. This article mainly examines the applicability of the Vantage PDMS database to pipeline projects involving jack-up drilling ships. It discusses the catalogue (CATA) of the pipeline, the spec-world (SPWL) of the pipeline, the bolt tables (BLTA) and so on. This article explains the main methods for CATA construction as well as problem in the process of construction. In this article, the authors point out matters needing attention when using the Vantage PDMS database in the design process and discuss partial solutions to these questions. 展开更多
关键词 Vantage PDMS component database rate database BOLT jack-up drilling ships
下载PDF
Study on the evaluation index system and evaluation method for self-elevating drilling unit design 被引量:1
2
作者 王运龙 纪卓尚 《Journal of Marine Science and Application》 2009年第1期46-52,共7页
In the process of designing self-elevating drilling unit, it is important, yet complicated, to use comparison and filtering to select the optimum scheme from the feasible ones. In this research, an index system and me... In the process of designing self-elevating drilling unit, it is important, yet complicated, to use comparison and filtering to select the optimum scheme from the feasible ones. In this research, an index system and methodology for the evaluation of self-elevating drilling unit was proposed. Based on this, a multi-objective combinatorial optimization model was developed, using the improved grey relation Analysis (GRA), in which the analytic hierarchy process (AHP) was used to determine the weights of the evaluating indices. It considered the connections within the indices, reflecting the objective nature of things, and also considered the subjective interests of ship owners and the needs of designers. The evaluation index system and evaluation method can be used in the selection of an optimal scheme and advanced assessment. A case study shows the index system and evaluation method are scientific, reasonable, and easy to put into practice. At the same time, such an evaluation index system and evaluation method will be helpful for making decisions for other mobile platforms. 展开更多
关键词 self-elevating drilling unit evaluation index system evaluation method grey relation analysis (GRA) analytic hierarchy process (AHP)
下载PDF
升井
3
作者 吴晖 《当代矿工》 2009年第9期28-28,共1页
历史的深,被时间的远托起,罐笼的滑翔,就像岁月的梦呓,让我们,感受煤的声音,再一次包容我们的心。升井,是怎样的一种抒情方式,贴近了妻子温柔的怀抱,贴近了儿子天真的微笑,贴近了父亲母亲白发的巢。
关键词 《升井》 诗歌 中国 当代文学
原文传递
Mathematically modeling the main dimensions of self-elevating drilling units
4
作者 王运龙 纪卓尚 林焰 《Journal of Marine Science and Application》 2009年第3期211-215,共5页
The present status of self-elevating drilling units was analysed. Based on statistics of the main dimensions of self-elevating drilling units, a mathematical model was established using stepwise return procedures and ... The present status of self-elevating drilling units was analysed. Based on statistics of the main dimensions of self-elevating drilling units, a mathematical model was established using stepwise return procedures and a back-propagation neural network. mathematical model is applicable and reliable. The of the main dimensions of self-elevating drilling Analysis of examples of calculations showed that the model is useful for mastering the essential variations units and can be used for technical and economic analysis as well as in conceptual designs of drilling units. 展开更多
关键词 self-elevating drilling unit main dimensions single variable multi-variable
下载PDF
Study on the instability of airflow in mine hoisting-shaf 被引量:7
5
作者 王海桥 田峰 黄俊歆 《Journal of Coal Science & Engineering(China)》 2007年第1期69-73,共5页
In order to discover the airflow pattern in mine shaft which outfitted with hoist equipment (HE), this paper set up the physical model and anatomized the piston-wind caused by hoist equipment, and researched the flo... In order to discover the airflow pattern in mine shaft which outfitted with hoist equipment (HE), this paper set up the physical model and anatomized the piston-wind caused by hoist equipment, and researched the flow field and velocity field around the hoist equipment during its moving process, and analyzed the airflow around single and couple hoist equipment as well as decisive range of piston effect and additional effect of hoist equipment to ventilation system. Research conclusion indicate that during hoist equipment movement, airflow pattern changes repeatedly because of the influence of pis-ton effect from hoist equipment, and the study of airflow stability in shaft is the foundation for the stability of ventilation in mine. 展开更多
关键词 mine shaft hoist equipment (HE) piston effect ventilation system unsteady flow
下载PDF
Key technique of a detection sensor for coal mine wire ropes 被引量:3
6
作者 WANG Hong-yao XU Zhao +4 位作者 HUA Gang TIAN Jie ZHOU Bing-bing LU Yan-hong CHEN Feng-jun 《Mining Science and Technology》 EI CAS 2009年第2期170-175,共6页
Wire ropes,employed extensively in coal mine hoists and transportation systems are subject to damage due to wear,corrosion and fatigue.The extent of damage and the carrying capacity of ropes are closely related to the... Wire ropes,employed extensively in coal mine hoists and transportation systems are subject to damage due to wear,corrosion and fatigue.The extent of damage and the carrying capacity of ropes are closely related to the sense of safety by staff and equipments.Magnetic flux leakage detection method(MFL),as an effective method,is these days widely used in detection of broken strands of wire ropes.In order to improve the accuracy of detection of flaws in wire ropes by magnetic flux leakage(MFL),the effect of the distance between a sensor and the surface of a wire rope(i.e.,lift-off) on detection by magnetic flux leakage was in-vestigated.An analysis of the main principles for the choice of lift-off is described by us and a new method that improves the structure of the detector is proposed from the point of view of the design of a magnetic circuit,to restrain the impact of fluctuations of sensor lift-off.The effect of this kind of method is validated by simulation and computation.The results show that the detection sensitivity is markedly increased by this method.Furthermore,the signal-to-noise ratio(SNR) can be increased by over 28%.This method will lend itself to offer reliable scientific information to optimize the structure of excitation devices and improve the accuracy of MFL detection. 展开更多
关键词 coal mine wire rope magnetic flux leakage detection LIFT-OFF
下载PDF
Theoretical coupling longitudinal-transverse model and experimental verification of transverse vibration of rope for multi-rope friction hoisting system 被引量:4
7
作者 Juan Wu Ziming Kou 《International Journal of Coal Science & Technology》 EI 2016年第1期77-84,共8页
Using the mass of time-varying length balance rope focused on the hoisting conveyance, the coupling longi- tudinal-transverse model of mine friction hoist was established by using of the Hamilton's principle. The mod... Using the mass of time-varying length balance rope focused on the hoisting conveyance, the coupling longi- tudinal-transverse model of mine friction hoist was established by using of the Hamilton's principle. The modified Galerkin's method was used to discretize partial differential Eqs. The mine hoisting system was used to the example to analysis the relation between the load, velocity and transverse vibration of rope. The in situ tests were illustrated to evaluate the proposed mathematical model. The results showed that the modeling method can well represent the transverse vibration of rope. 展开更多
关键词 Hoisting system VIBRATION ROPE Longitudinal-transverse COUPLING
下载PDF
Inhibition characteristics of circulating current in parallel inverter driving system of mine hoist 被引量:3
8
作者 Kuanfang He Yong Wang Dongming Xiao 《International Journal of Coal Science & Technology》 EI 2016年第1期68-76,共9页
This research investigated the outputting circulation current inhibition characteristic which are controlled by the instantaneous feedback voltage in inverter parallel driving of the mine hoist. We established a trans... This research investigated the outputting circulation current inhibition characteristic which are controlled by the instantaneous feedback voltage in inverter parallel driving of the mine hoist. We established a transfer function of the parallel inverters controlled by the close-loop adjustment of instantaneous voltage feedback. The influence of the parameters of the close-loop feedback circuit to the inhibition effects to the outputting circulation current is observed. After analyzing the circulating current inhibition characteristics, the proportion integration (PI) controller is introduced into the close-loop adjustment by instantaneous voltage feedback. The characteristics equation is gained to determine the PI parameters by drawing the Bode plots. The inhibition effects of the proposed controller are examined by the established simulation model of parallel inverter system. The harmonic distortion rate at the outputting voltage frequency value of 4, 10, 20, 41 and 50 Hz, are all lower than 2.32 % by the instantaneous outputting voltage feedback. 展开更多
关键词 Mine hoist Parallel inverters Circulating current Inhibition characteristic - Close-loop adjustment
下载PDF
Theoretical analysis of thermoviscoelastic contact between friction lining and wire rope in mine friction hoists 被引量:2
9
作者 PENG Yu-xing ZHU Zhen-cai CHEN Guo-an 《Mining Science and Technology》 EI CAS 2009年第4期518-521,共4页
Serious accidents of mine hoists caused by high-speed sliding between friction lining and wire rope are often seen in coal mines.In order to solve this problem,we analyzed the contact characteristics between friction ... Serious accidents of mine hoists caused by high-speed sliding between friction lining and wire rope are often seen in coal mines.In order to solve this problem,we analyzed the contact characteristics between friction lining and wire rope.Then we carried out a dynamic mechanical analysis(DMA) to explain the change in mechanical properties of the friction lining as function of temperature and load frequency and found that temperature has a stronger effect on the mechanical properties than the frequency.We used multiple regression analysis to obtain the thermoviscoelastic constitutive relations of the friction lining.As well we derived the analytic solution for the thermoviscoelastic contact radius and pressure by combining the theory of viscoelastic contact mechanics with thermoviscoelastic constitutive relations. 展开更多
关键词 contact mechanics THERMOVISCOELASTICITY friction lining dynamic mechanical analysis mine hoist
下载PDF
Conceptual Design of a Deep Draft Semi-Submersible Platform with a Moveable Heave-Plate 被引量:2
10
作者 ZHU Hang OU Jinping ZHAI Gangjun 《Journal of Ocean University of China》 SCIE CAS 2012年第1期7-12,共6页
Based on the principle of turned mass damper(TMD) systems,the conceptual design of semi-submersible platform with a moveable heave-plate(MHS) has been put forward.The heave motion response amplitude operator(RAO) and ... Based on the principle of turned mass damper(TMD) systems,the conceptual design of semi-submersible platform with a moveable heave-plate(MHS) has been put forward.The heave motion response amplitude operator(RAO) and viscous damping of the MHS platform are calculated by iteration,and the coupling stiffness between the MHS hull and the heave-plate is optimized to decrease the maximum heave motion response of the MHS hull under 10-year survival conditions in the South China Sea.The nu-merical results indicate that the heave motion RAO of the MHS hull can be decreased in the range of predominant wave frequencies,which may provide some reference to the heave motion control of offshore platforms. 展开更多
关键词 semi-submersible platform heave-plate TMD MHS platform
下载PDF
Research on the variable speed system of large power alternating current motor 被引量:1
11
作者 Li Chongjian 《Engineering Sciences》 EI 2012年第1期30-37,共8页
The development status of the variable speed system of large power AC(alternating current)motor drive in China is introduced.The large power AC drive fed by AC-AC converters(cycloconverters)has developed greatly,and s... The development status of the variable speed system of large power AC(alternating current)motor drive in China is introduced.The large power AC drive fed by AC-AC converters(cycloconverters)has developed greatly,and some innovations on the theory and engineering technique have been realized.They have been applied to rolling mills,mine hoists,and so on,and remarkable economic and social benefit has been achieved.The development of AC drive fed by large power IGCT(integrated gate commutated thyristors)AC-DC-AC converter is also introduced.It has excellent performance and reliable operation,and has been used in traction. 展开更多
关键词 large power AC motor CYCLOCONVERTER AC-DC-AC converter IGCT
下载PDF
STUDY ON THE CHARACTERISTICS OF LOW FREQUENCY SYNCHROMOTOR USED IN MINE HOIST SYSTEMS FED BY THE CYCLOINVERTER
12
作者 杨公训 宋凌云 《Journal of China University of Mining and Technology》 1995年第1期98-105,共8页
The Low Frequency Synchromotor Drive Mine Hoist System fed by the cycloinverter has good features from the technological and economical point of view. According to the erating char acteristic of the mine hoist system,... The Low Frequency Synchromotor Drive Mine Hoist System fed by the cycloinverter has good features from the technological and economical point of view. According to the erating char acteristic of the mine hoist system, an advanced analysis is given to the construction, the operating characteristics and the harmonics of the magnetomotive force of the synchromotor fed by the cy cloinverter, and the beneficial suggestions are also given in this paper. 展开更多
关键词 cycloinverter synchromotor operating characteristic M. M. F. harmonics
下载PDF
DEVELOPMENT OF CYCLOCONVERTER-IM SYSTEM FOR EXPLOSION-PROOF UNDERGROUND MINE HOIST
13
作者 谢桂林 赵一凡 《Journal of China University of Mining and Technology》 1990年第1期76-82,共7页
A recent developed Cycloconverter-IM haulage drive for underground mining is described in this paper. The control of this system is fully digitized. Six INTEL 8031 single-chip microprocessors are interconnected to per... A recent developed Cycloconverter-IM haulage drive for underground mining is described in this paper. The control of this system is fully digitized. Six INTEL 8031 single-chip microprocessors are interconnected to perform the functions of motor speed control,cycloconverter firing , fault diagnosis,etc. The implementations of the above functions are illustrated,and also a new method called "slip feedback control" for improving power factor of cycloconverter is put forward in this paper. 展开更多
关键词 cycloconverter .single-chip microprocessor .induction motor drives underground haulage
下载PDF
Passivity-based control of synchronous motors in mine hoist systems
14
作者 XUE Hua JIANG Jian-guo +1 位作者 YUAN Ming-han JIANG Hua 《Journal of Coal Science & Engineering(China)》 2009年第3期332-336,共5页
An adaptive PBC strategy for SM with a time-varying load torque to track fluxand speed trajectories was proposed.The key point of this method was the identificationof terms,known as workless forces,which appeared in t... An adaptive PBC strategy for SM with a time-varying load torque to track fluxand speed trajectories was proposed.The key point of this method was the identificationof terms,known as workless forces,which appeared in the dynamic equations of SM buthad no effect on the energy balance equation of the closed loop.PBC,combined withadaptive control schemes,not only preserved the advantages of PBC such as nonexistenceof singularity,but also rejected the flux and speed tracking error caused by statorand rotor resistance variation.The rotor currents of SM were estimated via a state observer.This algorithm simplified the control structure and enhanced the robustness of thecontrol system.The feasibility and effectiveness were confirmed by experimental resultsbased on dSPACE. 展开更多
关键词 passivity-based control(PBC) adaptive scheme synchronous motors(SM) dSPACE
下载PDF
COMPARISON OF NO-LINE MONITORING AND FAULT DIAGNOSIS FOR HOISTER BRAKE SYSTEM
15
作者 任芳 杨兆建 王世文 《Journal of Coal Science & Engineering(China)》 1999年第2期73-76,共4页
This paper puts forward the LPM fault diagnosis method in the view of the important purpose of on-line monitoring and fault diagnosis for hoister brake system. The feasibility of the two diagnosis methods are proved i... This paper puts forward the LPM fault diagnosis method in the view of the important purpose of on-line monitoring and fault diagnosis for hoister brake system. The feasibility of the two diagnosis methods are proved in theories; two methods are proved about feasibility and reliability through testing. Two methods are manifestoed that they can undertake the on-line monitoring and fault diagnosis for hoister brake system with satisfied effect. 展开更多
关键词 brake system fault diagnosis on-line monitoring
全文增补中
Impact of Grouting and Loading of Building Construction on the Water Level of Tangshan Mine Well
16
作者 Sheng Yanrui Zhang Ziguang +3 位作者 Zhang Suxin Sun Dongxia Shan Lianjun Yin Baojun 《Earthquake Research in China》 2014年第2期242-249,共8页
The water level rising rate of Tangshan mine well significantly accelerated in 2010,and the ascensional range was obviously higher than that of the same period in previous years.From the view of groundwater dynamics a... The water level rising rate of Tangshan mine well significantly accelerated in 2010,and the ascensional range was obviously higher than that of the same period in previous years.From the view of groundwater dynamics and loading effects,and based on the water pumping( pouring) water test model and semi-infinite elastic space theory model under uniform load,the effects of grouting and loading of nearby building construction on the well water level were analyzed. Results show that grouting at a distance of 200 ~ 700 m to the well,with amount of 2500m3 per day and duration of 270 d,can cause an 8 ~ 11 m rise of well water level; and loading of large-area building construction can cause about a 4m rise of well water level. Through the analysis of these factors,we find that the water level anomalous rising of Tangshan mine well was relevant to grouting and loading of the nearby building construction. This study provides a scientific basis for anomalous rising analysis of water level of Tangshan mine well. 展开更多
关键词 Tangshan mine well Water level rise Uniform load theory model Pumping test model
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部