The production and consumption of natural gas in China has been developing rapidly in recent years.It is expected that the annual growth rate of the demand for natural gas will reach 12% in the next 15 years,and the g...The production and consumption of natural gas in China has been developing rapidly in recent years.It is expected that the annual growth rate of the demand for natural gas will reach 12% in the next 15 years,and the gas consumption in the primary energy will increase from 0.3% to 10% or more by 2020.However,since the supply of natural gas cannot satisfy the requirements,China has begun to build liquefied natural gas(LNG)terminals in the coastal regions such as Guangdong and Fujian,and solve this problem by importing LNG from foreign countries.LNG needs to be transported by LNG ships from abroad.With the rapid growth of global gas production,the volume of LNG trade also increases,and the interregional production increased from 0.3% in 1970 to 26.2% in 2004.So,we need LNG ships more than before.This article puts forward the distribution of LNG ships and the speculation of the future of LNG transportation based on the studies on foreign LNG production,the LNG trade,the building of LNG ships,the LNG transportation,the chain model of LNG distribution,etc.展开更多
The global trends of increasing oil and gas costs have compelled coal possessing countries to start long term underground coal gasification (UCG) projects. These enhance national energy security and are among the cl...The global trends of increasing oil and gas costs have compelled coal possessing countries to start long term underground coal gasification (UCG) projects. These enhance national energy security and are among the cleanest, ecologically safest coal utilization technologies. This paper delineates the major characteristics of such technologies and analyzes technical solutions. Highlighting the desire to develop large scale industrial UCG plants, pilot level projects are presented using a new UCG method developed in Russia by Joint Stock Company Gazprom Promgaz. This method is distinct for its high controllability, stability, and energy efficiency. New, efficient technical solutions have been developed over the last 10-15 years and are patented in Russia. They guarantee controllability and stability of UCG gas produc- tion. Over one hundred iniection and gas production wells have been operated simultaneously.展开更多
Marine risers play a key role in the deep and ultra-deep water oil and gas production. The vortex-induced vibration (VIV) of marine risers constitutes an important problem in deep water oil exploration and productio...Marine risers play a key role in the deep and ultra-deep water oil and gas production. The vortex-induced vibration (VIV) of marine risers constitutes an important problem in deep water oil exploration and production. VIV will result in high rates of structural failure of marine riser due to fatigue damage accumulation and diminishes the riser fatigue life. In-service monitoring or full scale testing is essential to improve our understanding of V1V response and enhance our ability to predict fatigue damage. One ma- rine riser fatigue acoustic telemetry scheme is proposed and an engineering prototype machine has been developed to monitor deep and ultra-deep water risers' fatigue and failure that can diminish the riser fatigue life and lead to economic losses and eco-catastrophe. Many breakthroughs and innovation have been achieved in the process of developing an engineering prototype machine. Sea trials were done on the 6th generation deep-water drilling platform HYSY-981 in the South China Sea. The inclination monitoring results show that the marine riser fatigue acoustic telemetry scheme is feasible and reliable and the engineering prototype machine meets the design criterion and can match the requirements of deep and ultra-deep water riser fatigue monitoring. The rich experience and field data gained in the sea trial which provide much technical support for optimization in the engineering prototype machine in the future.展开更多
Aiming at acute characteristics of flammability,explosibility,causticity and leakiness of high sour natural gas,giving full consideration to local natural conditions in Sichuan Province and starting with purification ...Aiming at acute characteristics of flammability,explosibility,causticity and leakiness of high sour natural gas,giving full consideration to local natural conditions in Sichuan Province and starting with purification process,the paper analyzed process configurations,energy utilization and conservation,safety and environment protection measures. The integrated technology and engineering scheme for high sour natural gas purification was established and successfully used in industrial application.展开更多
The desulfurization performance of the UDS solvents was investigated at an industrial side-stream plant and was compared with that of MDEA solvent.A mass transfer performance model was employed for explaining the COS ...The desulfurization performance of the UDS solvents was investigated at an industrial side-stream plant and was compared with that of MDEA solvent.A mass transfer performance model was employed for explaining the COS absorption into different solvents.Meanwhile,the regeneration performance of the UDS solvents was evaluated in side-stream tests.Results indicate that under the conditions covering an absorption temperature of 40℃,a pressure of 8.0 MPa,and a gas to liquid volume ratio(V/L)of around 230,the H2S content in purified gas can be reduced to 4.2 mg/m3 and 0 by using solvents UDS-II and UDS-III,respectively.Moreover,the total sulfur content in both purified gases is less than 80 mg/m3.As a result,the UDS-III solvent shows by 30 percentage points higher in COS removal efficiency than MDEA.In addition,the total volume mass transfer coefficient of UDS solvent is found to be twice higher than that of MDEA.Furthermore,the UDS solvents exhibit satisfactory thermal stability and regeneration performance.展开更多
PetroChina has got the preliminary approval from the central government for construction of three LNG terminals in the coastal areas of Jiangsu Province, Hebei Province and Liaoning Province. Reportedly, China's Nati...PetroChina has got the preliminary approval from the central government for construction of three LNG terminals in the coastal areas of Jiangsu Province, Hebei Province and Liaoning Province. Reportedly, China's National Development and Reform Commission (NDRC) has given green light to PetroChina to conduct preliminary work in constructing the three terminals”, a PetroChina senior vice-president recently said at an energy forum in Beijing.展开更多
基金Under the auspices of the National Natural Science Foundation of China(No.40671052)
文摘The production and consumption of natural gas in China has been developing rapidly in recent years.It is expected that the annual growth rate of the demand for natural gas will reach 12% in the next 15 years,and the gas consumption in the primary energy will increase from 0.3% to 10% or more by 2020.However,since the supply of natural gas cannot satisfy the requirements,China has begun to build liquefied natural gas(LNG)terminals in the coastal regions such as Guangdong and Fujian,and solve this problem by importing LNG from foreign countries.LNG needs to be transported by LNG ships from abroad.With the rapid growth of global gas production,the volume of LNG trade also increases,and the interregional production increased from 0.3% in 1970 to 26.2% in 2004.So,we need LNG ships more than before.This article puts forward the distribution of LNG ships and the speculation of the future of LNG transportation based on the studies on foreign LNG production,the LNG trade,the building of LNG ships,the LNG transportation,the chain model of LNG distribution,etc.
文摘The global trends of increasing oil and gas costs have compelled coal possessing countries to start long term underground coal gasification (UCG) projects. These enhance national energy security and are among the cleanest, ecologically safest coal utilization technologies. This paper delineates the major characteristics of such technologies and analyzes technical solutions. Highlighting the desire to develop large scale industrial UCG plants, pilot level projects are presented using a new UCG method developed in Russia by Joint Stock Company Gazprom Promgaz. This method is distinct for its high controllability, stability, and energy efficiency. New, efficient technical solutions have been developed over the last 10-15 years and are patented in Russia. They guarantee controllability and stability of UCG gas produc- tion. Over one hundred iniection and gas production wells have been operated simultaneously.
基金supported in part by the National Science and Technology Major Project of China (2011ZX 05026-001-06)the National Natural Science Foundation of China (51249005 60972153)
文摘Marine risers play a key role in the deep and ultra-deep water oil and gas production. The vortex-induced vibration (VIV) of marine risers constitutes an important problem in deep water oil exploration and production. VIV will result in high rates of structural failure of marine riser due to fatigue damage accumulation and diminishes the riser fatigue life. In-service monitoring or full scale testing is essential to improve our understanding of V1V response and enhance our ability to predict fatigue damage. One ma- rine riser fatigue acoustic telemetry scheme is proposed and an engineering prototype machine has been developed to monitor deep and ultra-deep water risers' fatigue and failure that can diminish the riser fatigue life and lead to economic losses and eco-catastrophe. Many breakthroughs and innovation have been achieved in the process of developing an engineering prototype machine. Sea trials were done on the 6th generation deep-water drilling platform HYSY-981 in the South China Sea. The inclination monitoring results show that the marine riser fatigue acoustic telemetry scheme is feasible and reliable and the engineering prototype machine meets the design criterion and can match the requirements of deep and ultra-deep water riser fatigue monitoring. The rich experience and field data gained in the sea trial which provide much technical support for optimization in the engineering prototype machine in the future.
文摘Aiming at acute characteristics of flammability,explosibility,causticity and leakiness of high sour natural gas,giving full consideration to local natural conditions in Sichuan Province and starting with purification process,the paper analyzed process configurations,energy utilization and conservation,safety and environment protection measures. The integrated technology and engineering scheme for high sour natural gas purification was established and successfully used in industrial application.
基金financial support from the National Key Science and Technology Project of China (2011ZX05017-005)the Fundamental Research Funds for the Central Universities (No.22A201514010)
文摘The desulfurization performance of the UDS solvents was investigated at an industrial side-stream plant and was compared with that of MDEA solvent.A mass transfer performance model was employed for explaining the COS absorption into different solvents.Meanwhile,the regeneration performance of the UDS solvents was evaluated in side-stream tests.Results indicate that under the conditions covering an absorption temperature of 40℃,a pressure of 8.0 MPa,and a gas to liquid volume ratio(V/L)of around 230,the H2S content in purified gas can be reduced to 4.2 mg/m3 and 0 by using solvents UDS-II and UDS-III,respectively.Moreover,the total sulfur content in both purified gases is less than 80 mg/m3.As a result,the UDS-III solvent shows by 30 percentage points higher in COS removal efficiency than MDEA.In addition,the total volume mass transfer coefficient of UDS solvent is found to be twice higher than that of MDEA.Furthermore,the UDS solvents exhibit satisfactory thermal stability and regeneration performance.
文摘PetroChina has got the preliminary approval from the central government for construction of three LNG terminals in the coastal areas of Jiangsu Province, Hebei Province and Liaoning Province. Reportedly, China's National Development and Reform Commission (NDRC) has given green light to PetroChina to conduct preliminary work in constructing the three terminals”, a PetroChina senior vice-president recently said at an energy forum in Beijing.