期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
完成工作
1
作者 哈罗德·布鲁姆 黄灿然(译) 《西部(新文学)(上)》 2011年第3期157-160,共4页
塔尔丰拉比说: “日子短而工作大,劳动者慵懒,报酬丰厚,主人要求高。” 塔尔丰拉比还曾说过: “你不一定非要完成工作.但你也不能随心所欲停止。”
关键词 小说 文学作品 现代文学 《完成工作》
原文传递
A novel deadline and budget constrained scheduling heuristics for computational grids
2
作者 王勇 R.M.BAHATI M.A.BAUER 《Journal of Central South University》 SCIE EI CAS 2011年第2期465-472,共8页
The conventional deadline and budget constrained (DBC) scheduling heuristics for economic-based computational grids does not take the inconsistency of grid heterogeneity into account, which can lead to decline of ap... The conventional deadline and budget constrained (DBC) scheduling heuristics for economic-based computational grids does not take the inconsistency of grid heterogeneity into account, which can lead to decline of application completion ratios. Motivated by this fact, a novel DI3C scheduling heuristics was proposed to deal with sequential workflow applications. In order to valuate the inconsistency, the relative cost (RC) metric was introduced, which was used to indicate the task-starving degree for resources. The new algorithm assigns tasks to resources, considering completion time, budget and RC together. The GridSim toolkit and the benchmark suites of the standard performance evaluation corporation (SPEC) were used to simulate the heterogeneous grid environment and applications. The experimental results show that the task and workflow completion ratios of the new heuristics are higher than those of the conventional heuristics. 展开更多
关键词 computional grids economic-based grid grid brocker grid scheduling simulation
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部