期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
整合与细分:我国公司组织形态的类型再造
1
作者 杨狄 薛亚琼 《石河子大学学报(哲学社会科学版)》 2024年第5期86-94,共9页
实践中公司发展的日趋多元化与差异化,与我国现行公司法定分类存在诸多不协调。传统公司“二分法”面临界限标准模糊,与立法本意偏离;规范结构错位,与法律适用冲突;分类规则僵化,与实践需求脱节等问题,且已制约着我国公司实体的发展与... 实践中公司发展的日趋多元化与差异化,与我国现行公司法定分类存在诸多不协调。传统公司“二分法”面临界限标准模糊,与立法本意偏离;规范结构错位,与法律适用冲突;分类规则僵化,与实践需求脱节等问题,且已制约着我国公司实体的发展与创新。故此,有必要再造公司组织形态的类型以实现公司的科学划分与差异规制:一是沿用有限公司与股份公司的既有概念和框架体系,重构其分类标准,将公司实质性区分为公众性与封闭性两大类别,以回应两类公司在市场透明度、监管要求等方面的根本差异;二是针对实质封闭性的有限公司,进一步考量实践需求,结合关键要素对有限公司形态进行更为细致的分类,以实现制度规则与组织形态的精准配置。 展开更多
关键词 《新公司法》 公司组织形态 公司二分法 公众公司 封闭公司
下载PDF
Innovative Approach to Increase Name Plate Capacity of Oil and Gas Gathering Centre
2
作者 Chirag Parikh Abdulaziz Al-Saeed Bader Mahmoud Raj iv Kukreja 《Journal of Energy and Power Engineering》 2015年第10期860-865,共6页
Purpose: The oil and gas gathering and processing facility of Kuwait Oil Company is built with a nameplate capacity of X MBOPD (thousand barrels oil per day) with 50% water cut. However, the facility was operating ... Purpose: The oil and gas gathering and processing facility of Kuwait Oil Company is built with a nameplate capacity of X MBOPD (thousand barrels oil per day) with 50% water cut. However, the facility was operating with a water cut of 35%. This comprehensive technical study was conducted to evaluate possibility of increasing oil processing capacity of this facility in line with current lower water cut and other operational flexibilities available in the facility without utilizing its design margin. Topic: This paper shares an innovative approach to increase name plate capacity of oil and gas processing facility utilizing available operational flexibility and operational margins with minor modification. It shares a case study where facility capacity is increased by around 19% without utilizing design margins of equipment or pipeline. Method: The study includes theoretical verification and analysis of all major equipment and piping to identify available capacity and limitation, in order to utilize available additional margin and to propose debottleneck options to overcome limitations. Achievement: The study confirmed that, facility name plate capacity can be revised from X MBOPD (with 50% w.c (water cut)) to X + 32 MBOPD (with: 45% w.c) minor modification in separator and utilizing margin available in feed specification ofdesalter trains. 展开更多
关键词 Debottlenecking capacity enhancement production.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部