The pile working load depends on the imperfections which may be taken place in pile-soil system, during pile construction, among many other factors. This subject attracted the researcher's attention world wide in the...The pile working load depends on the imperfections which may be taken place in pile-soil system, during pile construction, among many other factors. This subject attracted the researcher's attention world wide in the last decades. Types of imperfections either geotechnical or structural are documented in literature and well explained. Nevertheless, the influence of these imperfections in pile load calculations is still ambiguous. The work presented herein is devoted to study soil disturbance during construction of piles using continuous flight auger, CFA. The study of soil disturbance due to drilling needs some evidence. The source of this evidence is field observations collected from four different construction sites, which are documented in this paper. The study concluded that the disturbed zone of soil by CFA has a conical shape and extending laterally to a distance equivalent to ten times of the pile diameter around the auger at the cutting bits and has an inclined surface of4:1 (vertical : horizontal). Furthermore excess pore water pressure was induced in soil in the vicinity of pile drilling. Due to this excess pore water pressure, 3.5% to 6.5% of piles constructed by CFA showed percolation of water from the top of the piles through fresh concrete. Also, subsidence of fresh concrete in pile hole was recorded in few of the constructed piles. Pile loading tests showed that the percolation of water and/or subsidence of fresh concrete have not appreciable influence on the load-displacement characteristics of the piles. Moreover, percolation of water at pile heads.展开更多
Dutch building regulation is under construction. After the report of the commission "Fundamentele Verkenning Bouw" in 2008, several studies have been done on the principals that the commission outlined in its report...Dutch building regulation is under construction. After the report of the commission "Fundamentele Verkenning Bouw" in 2008, several studies have been done on the principals that the commission outlined in its report. Local authorities and parties in construction were invited to start experiments with a more privatized system of building control. But this faced a lack of participation, partly due to the impact of the crisis. The minister responsible for housing and construction invited in 2011 a "Bouwteam" to develop an agenda for action for construction. In 2012, 17 action teams started to focus, speed up and simplify the planning and development of construction. Recently, the two teams related to building regulation presented their plans. The first was a roadmap towards private building control, the second, a proposal for an independent body to answer questions on constructions plans that do intrinsically but not legally meet the standards of building regulation. There is considerable controversy regarding the way that this implementation team is paving its path towards private building control. While the minister for housing conformed himself to a subsidized private implementing team, the Dutch Parliament has expressed its own priorities for regulation: insured guarantee to protect users and owners, a role for local authorities regarding safety and acceptance of buildings and simplification of building regulation and control for simple construction works. The parliament held a round-table conference to get informed about private building control. Recently, a proposal by the minister for housing was discussed. Further debate will be needed to decide about the next steps in innovation building regulation, which will take place in the upcoming months. ERB/RIGO (Foundation Expert Centre Regulations in Building/Research Institute for Real Estate) have developed own proposals for the public-private relation regarding development and construction of buildings. They expect that their proposals might be of help. The proposals are laid down in several publications and partly realized in experimental development of "to be approved" technical solutions. This paper reflects on the differences between their proposals and these of the roadmap, on the possible outcome of the ongoing debate and its implications, legal and technical, on building regulation and on legal and contractual liability. This paper tries to give an inside view on the development of regulation and the pros and cons of the proposals, starting from a theoretical outline of building regulation.展开更多
The paper presents an innovative renewable energy-load management technology, which is currently being developed as a prototype, in preparation for potential large-scale implementation in power systems. The new techno...The paper presents an innovative renewable energy-load management technology, which is currently being developed as a prototype, in preparation for potential large-scale implementation in power systems. The new technology employs controlled motion of large weights, which are being maneuvered (up and down) through the system peak/off-peak demand pattern. The load management scheme is similar to the pumping storage systems, but uses large weights instead of water and, therefore, is more suited to the operating environment in Saudi Arabia, in which water is relatively scarce. A portion of the off-peak valley-filling energy is supplied from wind-driven generators, which adds to the green energy component of the scheme. The controlled motion aspect of the new technology is based on partial implementation of previously published ideas by the authors as well as a registered patent. The paper describes the theoretical and analytical features of the introduced renewable energy-load management technology, and dwells on its practical implementation features.展开更多
In 2008, two governmental committees presented their conclusions on strengthening the role of the private building sector in building control. In 2011, three new studies were commissioned by the government to address ...In 2008, two governmental committees presented their conclusions on strengthening the role of the private building sector in building control. In 2011, three new studies were commissioned by the government to address perceived problems. One of them was an integral study, executed by ERB (Foundation Expertcentre Regulations in Building), RIGO (Research Institute for Real Estate) and TNO (Research Institute for Applied Technologies), to innovate the whole building regulations system. It led to proposals to redefine responsibility and liability for all parties. This study states that by an effort of yearly £100 million, unnecessary costs up to £l billion can be avoided and a real quality push will take place in the building and real estate markets. The goals to reach are to minimize the administrative burden for the building owner and to enforce the construction industry to build conforming to the regulations. This paper discusses the ERB study and the given proposals. The ERB study demonstrated that a quality push is needed which potential will lead to less costs for building owners. It also shows that proven solutions, part of the regulations, might be of help for all parties involved.展开更多
文摘The pile working load depends on the imperfections which may be taken place in pile-soil system, during pile construction, among many other factors. This subject attracted the researcher's attention world wide in the last decades. Types of imperfections either geotechnical or structural are documented in literature and well explained. Nevertheless, the influence of these imperfections in pile load calculations is still ambiguous. The work presented herein is devoted to study soil disturbance during construction of piles using continuous flight auger, CFA. The study of soil disturbance due to drilling needs some evidence. The source of this evidence is field observations collected from four different construction sites, which are documented in this paper. The study concluded that the disturbed zone of soil by CFA has a conical shape and extending laterally to a distance equivalent to ten times of the pile diameter around the auger at the cutting bits and has an inclined surface of4:1 (vertical : horizontal). Furthermore excess pore water pressure was induced in soil in the vicinity of pile drilling. Due to this excess pore water pressure, 3.5% to 6.5% of piles constructed by CFA showed percolation of water from the top of the piles through fresh concrete. Also, subsidence of fresh concrete in pile hole was recorded in few of the constructed piles. Pile loading tests showed that the percolation of water and/or subsidence of fresh concrete have not appreciable influence on the load-displacement characteristics of the piles. Moreover, percolation of water at pile heads.
文摘Dutch building regulation is under construction. After the report of the commission "Fundamentele Verkenning Bouw" in 2008, several studies have been done on the principals that the commission outlined in its report. Local authorities and parties in construction were invited to start experiments with a more privatized system of building control. But this faced a lack of participation, partly due to the impact of the crisis. The minister responsible for housing and construction invited in 2011 a "Bouwteam" to develop an agenda for action for construction. In 2012, 17 action teams started to focus, speed up and simplify the planning and development of construction. Recently, the two teams related to building regulation presented their plans. The first was a roadmap towards private building control, the second, a proposal for an independent body to answer questions on constructions plans that do intrinsically but not legally meet the standards of building regulation. There is considerable controversy regarding the way that this implementation team is paving its path towards private building control. While the minister for housing conformed himself to a subsidized private implementing team, the Dutch Parliament has expressed its own priorities for regulation: insured guarantee to protect users and owners, a role for local authorities regarding safety and acceptance of buildings and simplification of building regulation and control for simple construction works. The parliament held a round-table conference to get informed about private building control. Recently, a proposal by the minister for housing was discussed. Further debate will be needed to decide about the next steps in innovation building regulation, which will take place in the upcoming months. ERB/RIGO (Foundation Expert Centre Regulations in Building/Research Institute for Real Estate) have developed own proposals for the public-private relation regarding development and construction of buildings. They expect that their proposals might be of help. The proposals are laid down in several publications and partly realized in experimental development of "to be approved" technical solutions. This paper reflects on the differences between their proposals and these of the roadmap, on the possible outcome of the ongoing debate and its implications, legal and technical, on building regulation and on legal and contractual liability. This paper tries to give an inside view on the development of regulation and the pros and cons of the proposals, starting from a theoretical outline of building regulation.
文摘The paper presents an innovative renewable energy-load management technology, which is currently being developed as a prototype, in preparation for potential large-scale implementation in power systems. The new technology employs controlled motion of large weights, which are being maneuvered (up and down) through the system peak/off-peak demand pattern. The load management scheme is similar to the pumping storage systems, but uses large weights instead of water and, therefore, is more suited to the operating environment in Saudi Arabia, in which water is relatively scarce. A portion of the off-peak valley-filling energy is supplied from wind-driven generators, which adds to the green energy component of the scheme. The controlled motion aspect of the new technology is based on partial implementation of previously published ideas by the authors as well as a registered patent. The paper describes the theoretical and analytical features of the introduced renewable energy-load management technology, and dwells on its practical implementation features.
文摘In 2008, two governmental committees presented their conclusions on strengthening the role of the private building sector in building control. In 2011, three new studies were commissioned by the government to address perceived problems. One of them was an integral study, executed by ERB (Foundation Expertcentre Regulations in Building), RIGO (Research Institute for Real Estate) and TNO (Research Institute for Applied Technologies), to innovate the whole building regulations system. It led to proposals to redefine responsibility and liability for all parties. This study states that by an effort of yearly £100 million, unnecessary costs up to £l billion can be avoided and a real quality push will take place in the building and real estate markets. The goals to reach are to minimize the administrative burden for the building owner and to enforce the construction industry to build conforming to the regulations. This paper discusses the ERB study and the given proposals. The ERB study demonstrated that a quality push is needed which potential will lead to less costs for building owners. It also shows that proven solutions, part of the regulations, might be of help for all parties involved.