Tidal cycle measurements of tidal currents, salinity and water tempe rature, and suspended sediment concentrations were measured at four stations, to gether with surveys along two profiles short core collection within...Tidal cycle measurements of tidal currents, salinity and water tempe rature, and suspended sediment concentrations were measured at four stations, to gether with surveys along two profiles short core collection within the Yalu Riv er estuary. Grain size analysis of the three core sediment showed that: 1) the s ediment from B1 to B3 became finer, worse sorting and positively skewed; 2) the diversification of matter origin became more and more evident from east to west; 3) the sediments over the region were of the same origin, as indicated by their similar colors and grain sizes. The data indicated that stratification occurred in the flood season, from upstream to downstream, and a salt wedge was formed. The water column was well mixed, but the longitudinal gradient of the salinity w as larger on spring tide. The results also showed that the dominating mechanism of suspended sediment transport in the Yalu River estuary was T1, T2, T3 and T5. The non-tidal steady advection transport was restricted by the net transport o f suspended sediment induced by mass Stoked drift directed to landwards, then th e net sediment transport rate were decreased and the turbidity maxima was also f avored to forming and extending.展开更多
The grinding properties of abandoned concrete, which consists primarily of hardened cement, limestone aggregate and river sand, are studied. Theoretical models of grinding are used to explain the experimental observat...The grinding properties of abandoned concrete, which consists primarily of hardened cement, limestone aggregate and river sand, are studied. Theoretical models of grinding are used to explain the experimental observation. The results show that 1) The principle disintegration mechanism of hardened cement and river sand is volumetric grinding, although at later stages grinding of cement becomes difficult because of its flaked structure; 2) The lime- stone grinding process can be divided into two steps. First, volumetric grinding, with an obvious component of surface grinding, followed by primarily surface grinding as the micro-particle content increases; 3) Initially, the principle mechanism of grinding limestone and river sand is volumetric grinding, albeit less efficient grinding than if these components were ground separately, and; 4) After 10 to 20 min of grinding the grinding bottleneck phenomenon ap- pears and after 20 min of grinding the content of micro-particles is large and surface grinding is the main mechanism while the particle size of the mixture is smaller than that of separately ground river sand and cement but bigger than that of separately ground limestone.展开更多
According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research...According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.展开更多
Via the valuable opportunity of the Three Gorges Reservoir (TGR) 135-m filling in June 2003, the Yangtze discharge and suspended sediment concentration (SSC) entering the estuary during the period from 15 May to 15 Ju...Via the valuable opportunity of the Three Gorges Reservoir (TGR) 135-m filling in June 2003, the Yangtze discharge and suspended sediment concentration (SSC) entering the estuary during the period from 15 May to 15 July 2003 were analyzed to examine the instant effects of the filling on them. The Yangtze discharge and SSC entering the estuary in the periods before, during and after the filling clearly indicated three phases: 1) the pre-storage phase characterized by natural conditions, in which the SSC increased with increasing water discharge; 2) the storage phase, during which the SSC decreased dramatically with decreasing water discharge; and 3) the post-storage phase, during which both the SSC and water discharge remained at relatively low levels first until the end of June, then the SSC increased gradually with increasing water discharge. It seems that the times for the instant effects of the decreasing discharge downstream from the upper Yangtze on the Yangtze discharge and SSC entering the estuary due to the TGR 135-m filling to take place were about 5 d and 1 d respectively, while both were about 18 d for those of the increasing discharge. This probably reflects the buffering and resultantly hysteresis of the 1800-km stretch from the upper Yangtze to the estuary. The results are helpful for scientific and hydrological investigation of the Yangtze mainstream downstream from the TGR Dam and of the estuarine and adjacent coastal waters.展开更多
The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the qu...The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the quake-hit areas,and the channel-fill deposit problem caused by the debris flow was the most destructive.Moreover,it is of high possibility that an even severe deposit problem would reappear and result in worse consequences.In order to maximize risk reduction of this problem,relevant departments of the government established a series of emergency river restoration schemes,for which the numerical analysis is an important procedure to evaluate and determine the optimized one.This study presents a numerical analysis by applying a twodimensional debris flow model combined with a relevant water-sediment model to simulate the deposit during the progress of the debris flow,and to calculate and analyze the river flow field under both the present condition and different restoration conditions.The results show that the debris flow model,which takes the confluence of the Wenjia Gully to the main river into account,could simulate the deposit process quite well.In the reproduced debris flow from the simulation of the '8.13' Debris Flow,the original river flow path has switched to a relatively lower place just along the right bank with a high speed of near 7m.s-1 after being blocked by the deposit,which is highly hazardous.To prevent this hazard,a recommended scheme is derived through inter-comparison of different restoration conditions.It shows that the recommended scheme is able to reduce the water level and as well to regulate the flow path.Based on the given conditions of the mainstream and the tributary confluence for the simulated '8.13' Debris Flow,when encountering a debris flow with deposit volume less than 0.5 million m3,the river channel can endure a 20-year return flood;however,when the deposit volume increases to 2 million m3,the flood capacity of the river will be greatly impacted and the scheme becomes invalid.The recommended scheme supported by the present study has been applied to the emergency river restoration after this mega-debris flow.展开更多
The Yellow River is famous for its complex and unique physical conditions which give great chal- lenges to the river management. Based on the study and analysis of the existing problems and research progress, this pap...The Yellow River is famous for its complex and unique physical conditions which give great chal- lenges to the river management. Based on the study and analysis of the existing problems and research progress, this paper indicated that the most signifi- cant challenges of Yellow River studies are: long term hydrological and morphological changes; the optimized hydrology and sediment conditions to maintain the healthy life of the River; and simulation of Yellow River through mathematical model and physical models.展开更多
Water-sediment regulation of the Yellow River is to regulate and control the flow and sediment transport relationship of the lower reaches through reservoirs on the main streams and tributaries to create balance betwe...Water-sediment regulation of the Yellow River is to regulate and control the flow and sediment transport relationship of the lower reaches through reservoirs on the main streams and tributaries to create balance between water and sediment so that sediment transport capacity of the downstream channels can be maximized,shrinking of channels be contained,and medium flood channel be restored and maintained.Many years' research by the Yellow River Conservancy Commission(YRCC) reveals the water and sediment transport relationship that will prevent sedimentation at the downstream river channels.Based on this relationship and coming sediment and water conditions in the Yellow River basin,the YRCC,with maximized use of reservoirs on the main streams and tributaries,has developed three models of water-sediment regulation:single Xiaolangdi Reservoir-dominated regulation,space scale water-sediment match,and mainstream reservoirs joint operation.Ten water-sediment regulations based on these three models have resulted in an average drop of 1.5 m in the main channel of the downstream 800 km river and an increase of carrying capacity from 1800 to 4000 m3/s.Besides,the wetland ecosystems of estuarine delta has also been improved and restored significantly.展开更多
文摘Tidal cycle measurements of tidal currents, salinity and water tempe rature, and suspended sediment concentrations were measured at four stations, to gether with surveys along two profiles short core collection within the Yalu Riv er estuary. Grain size analysis of the three core sediment showed that: 1) the s ediment from B1 to B3 became finer, worse sorting and positively skewed; 2) the diversification of matter origin became more and more evident from east to west; 3) the sediments over the region were of the same origin, as indicated by their similar colors and grain sizes. The data indicated that stratification occurred in the flood season, from upstream to downstream, and a salt wedge was formed. The water column was well mixed, but the longitudinal gradient of the salinity w as larger on spring tide. The results also showed that the dominating mechanism of suspended sediment transport in the Yalu River estuary was T1, T2, T3 and T5. The non-tidal steady advection transport was restricted by the net transport o f suspended sediment induced by mass Stoked drift directed to landwards, then th e net sediment transport rate were decreased and the turbidity maxima was also f avored to forming and extending.
文摘The grinding properties of abandoned concrete, which consists primarily of hardened cement, limestone aggregate and river sand, are studied. Theoretical models of grinding are used to explain the experimental observation. The results show that 1) The principle disintegration mechanism of hardened cement and river sand is volumetric grinding, although at later stages grinding of cement becomes difficult because of its flaked structure; 2) The lime- stone grinding process can be divided into two steps. First, volumetric grinding, with an obvious component of surface grinding, followed by primarily surface grinding as the micro-particle content increases; 3) Initially, the principle mechanism of grinding limestone and river sand is volumetric grinding, albeit less efficient grinding than if these components were ground separately, and; 4) After 10 to 20 min of grinding the grinding bottleneck phenomenon ap- pears and after 20 min of grinding the content of micro-particles is large and surface grinding is the main mechanism while the particle size of the mixture is smaller than that of separately ground river sand and cement but bigger than that of separately ground limestone.
基金support from the Technology Pillar Program during the"Eleventh Five-year Plan"Period (No.2006BAB05B02No.2006BAB05B03) are acknowledged
文摘According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.
基金supported by the National Basic Research Program of China (2002CB412400)the Natural Science Foundation of Shandong Province (Y2007E14)+1 种基金the Doctoral Fund of Ministry of Education of China (200804231011)the Key Lab of Submarine Geosciences and Prospecting Techniques of the Ministry of Education
文摘Via the valuable opportunity of the Three Gorges Reservoir (TGR) 135-m filling in June 2003, the Yangtze discharge and suspended sediment concentration (SSC) entering the estuary during the period from 15 May to 15 July 2003 were analyzed to examine the instant effects of the filling on them. The Yangtze discharge and SSC entering the estuary in the periods before, during and after the filling clearly indicated three phases: 1) the pre-storage phase characterized by natural conditions, in which the SSC increased with increasing water discharge; 2) the storage phase, during which the SSC decreased dramatically with decreasing water discharge; and 3) the post-storage phase, during which both the SSC and water discharge remained at relatively low levels first until the end of June, then the SSC increased gradually with increasing water discharge. It seems that the times for the instant effects of the decreasing discharge downstream from the upper Yangtze on the Yangtze discharge and SSC entering the estuary due to the TGR 135-m filling to take place were about 5 d and 1 d respectively, while both were about 18 d for those of the increasing discharge. This probably reflects the buffering and resultantly hysteresis of the 1800-km stretch from the upper Yangtze to the estuary. The results are helpful for scientific and hydrological investigation of the Yangtze mainstream downstream from the TGR Dam and of the estuarine and adjacent coastal waters.
基金supported by the National Basic Research Program of China ("973" Project) (Grant No. 2011CB409903)the National Natural Science Foundation of China (Grant No. 50739002)
文摘The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the quake-hit areas,and the channel-fill deposit problem caused by the debris flow was the most destructive.Moreover,it is of high possibility that an even severe deposit problem would reappear and result in worse consequences.In order to maximize risk reduction of this problem,relevant departments of the government established a series of emergency river restoration schemes,for which the numerical analysis is an important procedure to evaluate and determine the optimized one.This study presents a numerical analysis by applying a twodimensional debris flow model combined with a relevant water-sediment model to simulate the deposit during the progress of the debris flow,and to calculate and analyze the river flow field under both the present condition and different restoration conditions.The results show that the debris flow model,which takes the confluence of the Wenjia Gully to the main river into account,could simulate the deposit process quite well.In the reproduced debris flow from the simulation of the '8.13' Debris Flow,the original river flow path has switched to a relatively lower place just along the right bank with a high speed of near 7m.s-1 after being blocked by the deposit,which is highly hazardous.To prevent this hazard,a recommended scheme is derived through inter-comparison of different restoration conditions.It shows that the recommended scheme is able to reduce the water level and as well to regulate the flow path.Based on the given conditions of the mainstream and the tributary confluence for the simulated '8.13' Debris Flow,when encountering a debris flow with deposit volume less than 0.5 million m3,the river channel can endure a 20-year return flood;however,when the deposit volume increases to 2 million m3,the flood capacity of the river will be greatly impacted and the scheme becomes invalid.The recommended scheme supported by the present study has been applied to the emergency river restoration after this mega-debris flow.
文摘The Yellow River is famous for its complex and unique physical conditions which give great chal- lenges to the river management. Based on the study and analysis of the existing problems and research progress, this paper indicated that the most signifi- cant challenges of Yellow River studies are: long term hydrological and morphological changes; the optimized hydrology and sediment conditions to maintain the healthy life of the River; and simulation of Yellow River through mathematical model and physical models.
文摘Water-sediment regulation of the Yellow River is to regulate and control the flow and sediment transport relationship of the lower reaches through reservoirs on the main streams and tributaries to create balance between water and sediment so that sediment transport capacity of the downstream channels can be maximized,shrinking of channels be contained,and medium flood channel be restored and maintained.Many years' research by the Yellow River Conservancy Commission(YRCC) reveals the water and sediment transport relationship that will prevent sedimentation at the downstream river channels.Based on this relationship and coming sediment and water conditions in the Yellow River basin,the YRCC,with maximized use of reservoirs on the main streams and tributaries,has developed three models of water-sediment regulation:single Xiaolangdi Reservoir-dominated regulation,space scale water-sediment match,and mainstream reservoirs joint operation.Ten water-sediment regulations based on these three models have resulted in an average drop of 1.5 m in the main channel of the downstream 800 km river and an increase of carrying capacity from 1800 to 4000 m3/s.Besides,the wetland ecosystems of estuarine delta has also been improved and restored significantly.