The original description of male hypopygium of Tipula(Emodotipula) holoteles Alexander, 1924 is expanded with additional morphological characters and detailed illustrations. The additional morphological descriptions o...The original description of male hypopygium of Tipula(Emodotipula) holoteles Alexander, 1924 is expanded with additional morphological characters and detailed illustrations. The additional morphological descriptions of the female ovipositor along with detailed drawings are provided. The male semen pump and the female vaginal apodeme as well as the spermatheca are also described and illustrated for the first time, representing the first report of these structures of Tipula(Emodotipula) holoteles. Additionally, the taxonomic potential of the semen pump in the subgenus Emodotipula is analyzed and discussed. The new specific name Tipula(Emodotipula) yangi nom. nov. is proposed as a replacement name for junior homonym Tipula(Emodotipula) alexanderi Men, 2017. A worldwide checklist and a key to Chinese species of the subgenus Emodotipula are provided.展开更多
Density function M06 method has been used to optimize the geometries of camptothecin-cytosine at 6-3 I+G* basis. Finally, thirteen stabilized complexes have been obtained. Theories of atoms in molecules (AIM) and ...Density function M06 method has been used to optimize the geometries of camptothecin-cytosine at 6-3 I+G* basis. Finally, thirteen stabilized complexes have been obtained. Theories of atoms in molecules (AIM) and natural bond orbital (NBO) have been utilized to investigate the hydrogen bonds involved in all the complexes. The interaction energies of all the complexes are corrected by basis set superposition error (BSSE). By the analysis of complexes interaction energy, charge density, second- order interaction energies E(2); it is indicated that the complex 6 is the most stable structure.展开更多
A considerable amount of tunnelling has been going on in India for various projects such as hydroelectric power, irrigation, roads and railways. Most of these projects are located in Himalayas, far away from the urban...A considerable amount of tunnelling has been going on in India for various projects such as hydroelectric power, irrigation, roads and railways. Most of these projects are located in Himalayas, far away from the urban areas. Tunnelling through weak and jointed rock masses such as the one in the Himalayas is a challenging task for the planners, designers, engineers and geologists because of high overburden, thickly vegetated surface, weak, poor and fragile rocks and highly varying geology with the presence of numerous small and big shear zones, faults, etc. Due to these reasons, various tunnelling problems have been faced in the past and are still being encountered. Failures and the problems may be regarded as challenges and opportunities for generating new knowledge base and thereby increasing self-reliance in tunnelling. The experiences of Himalayan tunnelling through weak and fragile rocks covering varying and mixed geology, understanding on tunnelling in squeezing ground conditions and applicability of TBM in Himalayas are presented. It has also been highlighted that the probe holes planning, drilling and monitoring shall be followed seriously to reduce the geological surprises.展开更多
基金supported by the National Natural Science Foundation of China (31300551)the Anhui Outstanding Young Talent Support Program (gxfx2017059)
文摘The original description of male hypopygium of Tipula(Emodotipula) holoteles Alexander, 1924 is expanded with additional morphological characters and detailed illustrations. The additional morphological descriptions of the female ovipositor along with detailed drawings are provided. The male semen pump and the female vaginal apodeme as well as the spermatheca are also described and illustrated for the first time, representing the first report of these structures of Tipula(Emodotipula) holoteles. Additionally, the taxonomic potential of the semen pump in the subgenus Emodotipula is analyzed and discussed. The new specific name Tipula(Emodotipula) yangi nom. nov. is proposed as a replacement name for junior homonym Tipula(Emodotipula) alexanderi Men, 2017. A worldwide checklist and a key to Chinese species of the subgenus Emodotipula are provided.
基金Funded by the Health Department Science Foundation of Sichuan(Grant No. 2011-236)
文摘Density function M06 method has been used to optimize the geometries of camptothecin-cytosine at 6-3 I+G* basis. Finally, thirteen stabilized complexes have been obtained. Theories of atoms in molecules (AIM) and natural bond orbital (NBO) have been utilized to investigate the hydrogen bonds involved in all the complexes. The interaction energies of all the complexes are corrected by basis set superposition error (BSSE). By the analysis of complexes interaction energy, charge density, second- order interaction energies E(2); it is indicated that the complex 6 is the most stable structure.
文摘A considerable amount of tunnelling has been going on in India for various projects such as hydroelectric power, irrigation, roads and railways. Most of these projects are located in Himalayas, far away from the urban areas. Tunnelling through weak and jointed rock masses such as the one in the Himalayas is a challenging task for the planners, designers, engineers and geologists because of high overburden, thickly vegetated surface, weak, poor and fragile rocks and highly varying geology with the presence of numerous small and big shear zones, faults, etc. Due to these reasons, various tunnelling problems have been faced in the past and are still being encountered. Failures and the problems may be regarded as challenges and opportunities for generating new knowledge base and thereby increasing self-reliance in tunnelling. The experiences of Himalayan tunnelling through weak and fragile rocks covering varying and mixed geology, understanding on tunnelling in squeezing ground conditions and applicability of TBM in Himalayas are presented. It has also been highlighted that the probe holes planning, drilling and monitoring shall be followed seriously to reduce the geological surprises.