On May 12, 2008, an earthquake of 8.0 magnitude on the Richter scale and its numerous aftershocks devastatingly hit Wenchuan County and its nearby region along the Longman Mountains in Sichuan Province, China. The hea...On May 12, 2008, an earthquake of 8.0 magnitude on the Richter scale and its numerous aftershocks devastatingly hit Wenchuan County and its nearby region along the Longman Mountains in Sichuan Province, China. The heavy ruined area was up to 30,000km2 and 13% of its land surface was denuded by the extremely terrible quakes. The mountain collapses, landslides and debris flows induced by the earthquake not only scared the landscape at the immense scale, but also poured L66-billion-m3 sediment combined with offscourings and rubble into the Yangtze River and its breaches. This amount of sediments is 3 times more than the normal amount discharged into the Yangtze River, and will significantly increase sediment transportation of rivers and decrease storage capacities of reservoirs downstream. The dramatic increase in sediment load will imperil the engineering safety and impact the operation of the giant Three-Gorge Hydro-power Station if no proper prevention measures are taken.展开更多
Considering the additional electric energy generated after the full operation of the underground hydropower station, the electric energy accommodation of the Three Gorges Project (TGP) is reviewed. It is .focused on...Considering the additional electric energy generated after the full operation of the underground hydropower station, the electric energy accommodation of the Three Gorges Project (TGP) is reviewed. It is .focused on the additional electricity accommodation, based on the research at the earl), stage. The electric energ), accommodation solutions ate recommended as that. based on the cost-benefit analysis of the power distribution area, the additional electric energy of the Three Gorges should be given ptqority to meet the needs at the supply end of Hubei and Chongqing. The results of this research has a reference value on the implementation of the Three Gorges electric power accommodation, after the further optimization of the transmission curves in both wet and dry seasons.展开更多
Based on real-time digital simulations(RTDS),a laboratory environment similar to the real-time operation situation of the Three Gorges Hydropower Station is established.Then,the causes for the power fluctuation of the...Based on real-time digital simulations(RTDS),a laboratory environment similar to the real-time operation situation of the Three Gorges Hydropower Station is established.Then,the causes for the power fluctuation of the second generator by errors in the rotor rotating speed calculation are found,and the tuning method of the speed related parameters are given.The damping and reverse tuning characteristics of power system stabilizers(PSSs)in the digital automatic voltage regulator(AVR)are compared and investigated in the frequency range of 0.18-1.1 Hz.The efficiency of the proposed tuning method for ensuring power system stability is verified by RTDS.Finally,field tests show the validity of the laboratory test results.展开更多
Using physical model and numerical simulation techniques, some technical problems were studied systemati- cally, including layout of power station, measures of sediment and floating debris discharging, types of intake...Using physical model and numerical simulation techniques, some technical problems were studied systemati- cally, including layout of power station, measures of sediment and floating debris discharging, types of intake, embed- ded types of spiral ease, layout of underground powerhouse tunnel group and block reinforcement. It was optimal in technique and economy with the arrangement of powerhouse at the dam-toe of both banks + underground powerhouse in the right bank, as well as the intake with a single and small orifice. The sediment and debris problems could be solved with disperse sediment ejection and floating debris discharging holes. With the adoption of techniques for spiral cases such as heat and pressure preservation, cushion layer and combined embedding, the stable operation of generating units can be guaranteed. The arrangement of tailrace tunnel with sloping ceiling was better than that of tailrace surge tank. The technical requirements related to the embedding type of spiral case were proposed. The reinforcement of huge unfavorable blocks was discussed and the new idea for block reinforcement using anti-sliding piles and normal compressive stress of structural plane was put forward.展开更多
In view of its huge installed capacity and very complex transmission system,the design process of China's Three Gorges Hydropower Station had been repeatedly demonstrated for more than ten years.The smooth constru...In view of its huge installed capacity and very complex transmission system,the design process of China's Three Gorges Hydropower Station had been repeatedly demonstrated for more than ten years.The smooth construction,bringing into production and operation show that the planning scheme for Three Gorges power transmission project is successful.In this paper the design course of Three Gorges power transmission system is retrospected;the main planning schemes for Three Gorges power transmission system are reviewed;and the design results in different design stages are summarized.展开更多
基金carried out under the auspices of the public project of the Ministry of Water Conservancy of China (200801073, 2007SHZ0901034)the Knowledge Innovation Project of the Chinese Academy of Science (KZCX1-YW-08)
文摘On May 12, 2008, an earthquake of 8.0 magnitude on the Richter scale and its numerous aftershocks devastatingly hit Wenchuan County and its nearby region along the Longman Mountains in Sichuan Province, China. The heavy ruined area was up to 30,000km2 and 13% of its land surface was denuded by the extremely terrible quakes. The mountain collapses, landslides and debris flows induced by the earthquake not only scared the landscape at the immense scale, but also poured L66-billion-m3 sediment combined with offscourings and rubble into the Yangtze River and its breaches. This amount of sediments is 3 times more than the normal amount discharged into the Yangtze River, and will significantly increase sediment transportation of rivers and decrease storage capacities of reservoirs downstream. The dramatic increase in sediment load will imperil the engineering safety and impact the operation of the giant Three-Gorge Hydro-power Station if no proper prevention measures are taken.
文摘Considering the additional electric energy generated after the full operation of the underground hydropower station, the electric energy accommodation of the Three Gorges Project (TGP) is reviewed. It is .focused on the additional electricity accommodation, based on the research at the earl), stage. The electric energ), accommodation solutions ate recommended as that. based on the cost-benefit analysis of the power distribution area, the additional electric energy of the Three Gorges should be given ptqority to meet the needs at the supply end of Hubei and Chongqing. The results of this research has a reference value on the implementation of the Three Gorges electric power accommodation, after the further optimization of the transmission curves in both wet and dry seasons.
文摘Based on real-time digital simulations(RTDS),a laboratory environment similar to the real-time operation situation of the Three Gorges Hydropower Station is established.Then,the causes for the power fluctuation of the second generator by errors in the rotor rotating speed calculation are found,and the tuning method of the speed related parameters are given.The damping and reverse tuning characteristics of power system stabilizers(PSSs)in the digital automatic voltage regulator(AVR)are compared and investigated in the frequency range of 0.18-1.1 Hz.The efficiency of the proposed tuning method for ensuring power system stability is verified by RTDS.Finally,field tests show the validity of the laboratory test results.
文摘Using physical model and numerical simulation techniques, some technical problems were studied systemati- cally, including layout of power station, measures of sediment and floating debris discharging, types of intake, embed- ded types of spiral ease, layout of underground powerhouse tunnel group and block reinforcement. It was optimal in technique and economy with the arrangement of powerhouse at the dam-toe of both banks + underground powerhouse in the right bank, as well as the intake with a single and small orifice. The sediment and debris problems could be solved with disperse sediment ejection and floating debris discharging holes. With the adoption of techniques for spiral cases such as heat and pressure preservation, cushion layer and combined embedding, the stable operation of generating units can be guaranteed. The arrangement of tailrace tunnel with sloping ceiling was better than that of tailrace surge tank. The technical requirements related to the embedding type of spiral case were proposed. The reinforcement of huge unfavorable blocks was discussed and the new idea for block reinforcement using anti-sliding piles and normal compressive stress of structural plane was put forward.
文摘In view of its huge installed capacity and very complex transmission system,the design process of China's Three Gorges Hydropower Station had been repeatedly demonstrated for more than ten years.The smooth construction,bringing into production and operation show that the planning scheme for Three Gorges power transmission project is successful.In this paper the design course of Three Gorges power transmission system is retrospected;the main planning schemes for Three Gorges power transmission system are reviewed;and the design results in different design stages are summarized.