期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
某型输送台车上层框架设计的研究
1
作者 曹飞 《装备制造技术》 2015年第5期70-71,82,共3页
以输送台车上层框架为研究对象,根据上层框架设计计算的准则和要求及生产实际情况,选用焊接式的金属上层框架,并对其刚度及机架连接螺栓进行校核,满足要求。
关键词 输送台车 上层框架 设计 刚度校核 强度校核
下载PDF
Safe mining technology of undersea metal mine 被引量:15
2
作者 彭康 李夕兵 +2 位作者 万串串 彭述权 赵国彦 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2012年第3期740-746,共7页
Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and th... Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and the stability of rockmass.According to sampling and testing of ore-rock and backfill and in-situ stress field measurement,safety factor method calculation model based on stress-strain strength reduction at arbitrary points and Mohr-Coulomb yield criterion was established and limit displacement subsidence values under the safety factor of different limit stoping steps were calculated.The results from three years in-situ mining and strata movement monitoring using multi-point displacements meter showed that the lower settlement frame stope hierarchical level filling mining method,mining sequence are reasonable and rockmass stability evaluation using safety factor method,in-situ real-time monitoring can provide the technical foundation for the safety of seabed mining. 展开更多
关键词 subsea bedrock mining frame stope upward horizontal slicing and filling mining method safety factor method multi-point displacement measurement
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部