Uncertainties are common in the dating of paleoearthquakes.To improve the credibility of the dating of paleoearthquakes,analysis was done on fault activity,sedimentary environment and seismo-geomorphology to investiga...Uncertainties are common in the dating of paleoearthquakes.To improve the credibility of the dating of paleoearthquakes,analysis was done on fault activity,sedimentary environment and seismo-geomorphology to investigate paleoearthquakes along the Zemuhe active fault zone.Grouped trenches were excavated near Daqingliangzi,which revealed three palaeoearthquake events aged 160a,3100a and 5500a~8900a,respectively,including recurrence intervals of about 3000a.Sedimentary processes related to strike-slip fault type earthquakes were discussed,and a sedimentary model was put forward for strike-slip faults at hillsides where drumlin and reverse scarp developed.展开更多
In communication networks (CNs), the uncertainty is caused by the dynamic nature of the traffic demands. Therefore there is a need to incorporate the uncertainty into the network bandwidth capacity design. For this ...In communication networks (CNs), the uncertainty is caused by the dynamic nature of the traffic demands. Therefore there is a need to incorporate the uncertainty into the network bandwidth capacity design. For this purpose, this paper developed a fuzzy methodology for network bandwidth design under demand uncertainty. This methodology is usually used for offiine traffic engineering optimization, which takes a centralized view of bandwidth design, resource utilization, and performance evaluation. In this proposed methodology, uncertain traffic demands are first handled into a fuzzy number via a fuzzification method. Then a fuzzy optimization model for the network bandwidth allocation problem is formulated with the consideration of the trade-off between resource utilization and network performance. Accordingly, the optimal network bandwidth capacity can be obtained by maximizing network revenue in CNs. Finally, an illustrative numerical example is presented for the purpose of verification.展开更多
基金funded by the National Key Technology R&D Program(2004CB418401)
文摘Uncertainties are common in the dating of paleoearthquakes.To improve the credibility of the dating of paleoearthquakes,analysis was done on fault activity,sedimentary environment and seismo-geomorphology to investigate paleoearthquakes along the Zemuhe active fault zone.Grouped trenches were excavated near Daqingliangzi,which revealed three palaeoearthquake events aged 160a,3100a and 5500a~8900a,respectively,including recurrence intervals of about 3000a.Sedimentary processes related to strike-slip fault type earthquakes were discussed,and a sedimentary model was put forward for strike-slip faults at hillsides where drumlin and reverse scarp developed.
基金partially supported by the grants from the National Natural Science Foundation of Chinathe Knowledge Innovation Program of the Chinese Academy of Sciences+1 种基金the GRANT-IN-AID FOR SCIEN-TIFIC RESEARCH (No. 19500070)MEXT.ORC (2004-2008), Japan
文摘In communication networks (CNs), the uncertainty is caused by the dynamic nature of the traffic demands. Therefore there is a need to incorporate the uncertainty into the network bandwidth capacity design. For this purpose, this paper developed a fuzzy methodology for network bandwidth design under demand uncertainty. This methodology is usually used for offiine traffic engineering optimization, which takes a centralized view of bandwidth design, resource utilization, and performance evaluation. In this proposed methodology, uncertain traffic demands are first handled into a fuzzy number via a fuzzification method. Then a fuzzy optimization model for the network bandwidth allocation problem is formulated with the consideration of the trade-off between resource utilization and network performance. Accordingly, the optimal network bandwidth capacity can be obtained by maximizing network revenue in CNs. Finally, an illustrative numerical example is presented for the purpose of verification.