期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
中韩世界遗产地(点)解读及其实践对比研究——以宁波、济州为例 被引量:1
1
作者 陈艳 《中国名城》 2017年第2期78-85,共8页
以同为东亚文化之都的宁波和韩国济州作为考察对象,以国际古迹遗址理事会(ICOMOS)关于遗产地阐释和展示的宪章为考察基准,分析探讨了中国宁波与韩国济州世界遗产地(点)解读的东方实践及对比,寻找差距,并提出完善策略。
关键词 世界遗产地() 解读 阐释 展示 宁波 济州
下载PDF
Assessment of prospective hazards resulting from the 2017 earthquake at the world heritage site Jiuzhaigou Valley, Sichuan, China 被引量:8
2
作者 CHEN Xiao-qing CHEN Jian-gang +6 位作者 CUI Peng YOU Yong HU Kai-heng YANG Zong-ji ZHANG Wei-feng LI Xin-po WU Yong 《Journal of Mountain Science》 SCIE CSCD 2018年第4期779-792,共14页
On August 8, 2017, a Ms = 7.0 magnitude earthquake occurred in the Jiuzhaigou Valley, in Sichuan Province, China(N: 33.20°, E: 103.82°). Jiuzhaigou Valley is an area recognized and listed as a world heritage... On August 8, 2017, a Ms = 7.0 magnitude earthquake occurred in the Jiuzhaigou Valley, in Sichuan Province, China(N: 33.20°, E: 103.82°). Jiuzhaigou Valley is an area recognized and listed as a world heritage site by UNESCO in 1992. Data analysis and field survey were conducted on the landslide, collapse, and debris flow gully, to assess the coseismic geological hazards generated by the earthquake using an unmanned aerial vehicle(UAV), remote-sensing imaging, laser range finders, geological radars, and cameras. The results highlighted the occurrence of 13 landslides, 70 collapses, and 25 potential debris flow gullies following the earthquake. The hazards were classified on the basis of their size and the potential property loss attributable to them. Consequently, 14 large-scale hazards, 30 medium-sized hazards, and 64 small hazards accounting for 13%, 28%, and 59% of the total hazards, respectively, were identified. Based on the variation tendency of the geological hazards that ensued in areas affected by the Kanto earthquake(Japan), Chi-chi earthquake(Taiwan China), and Wenchuan earthquake(Sichuan China), the study predicts that, depending on the rain intensity cycle, the duration of geological hazard activities in the Jiuzhaigou Valley may last over ten years and will gradually decrease for the following five to ten yearsbefore returning to pre-earthquake levels. Thus,necessary monitoring and early warning systems must be implemented to ensure the safety of residents,workers and tourists during the construction of engineering projects and reopening of scenic sites to the public. 展开更多
关键词 2017 Jiuzhaigou earthquake Disaster risk Geological hazard LANDSLIDE World heritage site Jiuzhaigou Valley
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部