Based on the boundary support conditions of overlying high-position,hard and thick strata,a Winkler foundation beam mechanical model was built.Computational expressions for the characteristics and position of the bend...Based on the boundary support conditions of overlying high-position,hard and thick strata,a Winkler foundation beam mechanical model was built.Computational expressions for the characteristics and position of the bending moment for high-position,hard and thick strata were constructed by theoretical analysis,and the initial breaking position of high-position,hard and thick strata was also analyzed.The breaking process and evolution law of mining stress in high-position,hard and thick strata were studied by similar material simulation tests.Studies show that:due to the foundation deformation effect of the lower strata,the initial break position in high-position,hard thick layers is in the middle of goaf;vertical tension fractures first occur under the middle surface,then tilt tension fractures form at both sides and a non-uniform thickness of the fracture structure forms and produces subsidence deformation;behind the coal wall tilt fractures extend and eventually complete the migration.Mining stress produces obvious changes before and after the breakage of the high,hard and thick stratum;high stress concentration forms in front of the coal wall before breakage and fracture stress concentration significantly reduces after migration.Coal seam mining under high-position,hard thick strata can easily induce dynamic phenomena.展开更多
China's total coal reserves are enormous, in which recoverable reserves of coal seam thickness ofmineable coal reserves in China accounted for 43% of recoverable reserves When correctly using thick seam mining, minin...China's total coal reserves are enormous, in which recoverable reserves of coal seam thickness ofmineable coal reserves in China accounted for 43% of recoverable reserves When correctly using thick seam mining, mining methods can improve the proper thick seam mining rate and reduce coal loss. Using proper thick seam mining method can effectively reduce the thick seam mining costs. In mining safety, the use of appropriate thick seam mining methods can effectively prevent thick seam mining accidents. But in the process of development and current situation from the perspective of the Chinese coal mining, there are certain aspects of thick seam mining problems. These problems are mainly in the thick seam mining and the coal recovery rate is low, resulting in lots of waste coal. Besides, thick coal mining is less secure, safe and there are frequent accidents. These problems have seriously affected the thick seam mining. And a lot of thick coal seams of coal resources can not be effectively taken out. Now Chinese mining methods in thick seam mining areas are mainly open-pit mining and underground mining exploitation. Because of the open-pit coal burial depth has more stringent requirements, only used in shallow-depth areas. Underground mining is the primary way China is now using in thick seam mining. Underground mining methods include full-height slice mining and mechanized mining caving mining method once adopted. Research on these thick seam mining methods can provide theoretical and technical support for thick seam mining, thick seam mining techniques to enhance the level . I will combine the current situation of thick seam mining in Chinese study with thick seam mining methods, comments and suggestions for the current thick seam mining study展开更多
基金financially supported by the National Natural Science Foundation of China (No.51374139)the Natural Science Foundation of Shandong Province (No.ZR2013EEM018)the Scientific Research Innovation Team Support Plan of Shandong University of Science and Technology
文摘Based on the boundary support conditions of overlying high-position,hard and thick strata,a Winkler foundation beam mechanical model was built.Computational expressions for the characteristics and position of the bending moment for high-position,hard and thick strata were constructed by theoretical analysis,and the initial breaking position of high-position,hard and thick strata was also analyzed.The breaking process and evolution law of mining stress in high-position,hard and thick strata were studied by similar material simulation tests.Studies show that:due to the foundation deformation effect of the lower strata,the initial break position in high-position,hard thick layers is in the middle of goaf;vertical tension fractures first occur under the middle surface,then tilt tension fractures form at both sides and a non-uniform thickness of the fracture structure forms and produces subsidence deformation;behind the coal wall tilt fractures extend and eventually complete the migration.Mining stress produces obvious changes before and after the breakage of the high,hard and thick stratum;high stress concentration forms in front of the coal wall before breakage and fracture stress concentration significantly reduces after migration.Coal seam mining under high-position,hard thick strata can easily induce dynamic phenomena.
文摘China's total coal reserves are enormous, in which recoverable reserves of coal seam thickness ofmineable coal reserves in China accounted for 43% of recoverable reserves When correctly using thick seam mining, mining methods can improve the proper thick seam mining rate and reduce coal loss. Using proper thick seam mining method can effectively reduce the thick seam mining costs. In mining safety, the use of appropriate thick seam mining methods can effectively prevent thick seam mining accidents. But in the process of development and current situation from the perspective of the Chinese coal mining, there are certain aspects of thick seam mining problems. These problems are mainly in the thick seam mining and the coal recovery rate is low, resulting in lots of waste coal. Besides, thick coal mining is less secure, safe and there are frequent accidents. These problems have seriously affected the thick seam mining. And a lot of thick coal seams of coal resources can not be effectively taken out. Now Chinese mining methods in thick seam mining areas are mainly open-pit mining and underground mining exploitation. Because of the open-pit coal burial depth has more stringent requirements, only used in shallow-depth areas. Underground mining is the primary way China is now using in thick seam mining. Underground mining methods include full-height slice mining and mechanized mining caving mining method once adopted. Research on these thick seam mining methods can provide theoretical and technical support for thick seam mining, thick seam mining techniques to enhance the level . I will combine the current situation of thick seam mining in Chinese study with thick seam mining methods, comments and suggestions for the current thick seam mining study