电压失稳是一个动态的强非线性过程,需要采用动态方法来研究,而常规的动态电压稳定分析方法(如时域仿真法)的最大缺点是计算速度慢、耗费时间长,不能满足电压稳定在线研究的需要。本文利用PMU实测数据,在网损灵敏度理论的基础上,构造了...电压失稳是一个动态的强非线性过程,需要采用动态方法来研究,而常规的动态电压稳定分析方法(如时域仿真法)的最大缺点是计算速度慢、耗费时间长,不能满足电压稳定在线研究的需要。本文利用PMU实测数据,在网损灵敏度理论的基础上,构造了一个二阶指标—综合网损灵敏度指标(Integrated Loss Sensitivity Index,ILSI),同目前电压稳定分析常用的一阶指标相比,具有线性度好,准确度高的优点,在电压失稳过程中有比较均匀的变化趋势,这样不仅可以让运行人员清楚地了解系统的稳定状况,而且还可以预测稳定极限。提出的算法物理意义明确、算法结构简单,在IEEE9节点系统的仿真结果表明,该指标在系统电压恶化的过程中显示良好的线性度,可以很好地表征目前系统的电压水平。展开更多
A numerical procedure for reliability analysis of earth slope based on advanced first-order second-moment method is presented,while soil properties and pore water pressure may be considered as random variables.The fac...A numerical procedure for reliability analysis of earth slope based on advanced first-order second-moment method is presented,while soil properties and pore water pressure may be considered as random variables.The factor of safety and performance function is formulated utilizing a new approach of the Morgenstern and Price method.To evaluate the minimum reliability index defined by Hasofer and Lind and corresponding critical probabilistic slip surface,a hybrid algorithm combining chaotic particle swarm optimization and harmony search algorithm called CPSOHS is presented.The comparison of the results of the presented method,standard particle swarm optimization,and selected other methods employed in previous studies demonstrates the superior successful functioning of the new method by evaluating lower values of reliability index and factor of safety.Moreover,the presented procedure is applied for sensitivity analysis and the obtained results show the influence of soil strength parameters and probability distribution types of random variables on the reliability index of slopes.展开更多
In the reliability analysis of slope, the performance functions derived from the most available stability analysis procedures of slopes are usually implicit and cannot be solved by first-order second-moment approach. ...In the reliability analysis of slope, the performance functions derived from the most available stability analysis procedures of slopes are usually implicit and cannot be solved by first-order second-moment approach. A new reliability analysis approach was presented based on three-dimensional Morgenstem-Price method to investigate three-dimensional effect of landslide in stability analyses. To obtain the reliability index, Support Vector Machine (SVM) was applied to approximate the performance function. The time-consuming of this approach is only 0.028% of that using Monte-Carlo method at the same computation accuracy. Also, the influence of time effect of shearing strength parameters of slope soils on the long-term reliability of three-dimensional slopes was investigated by this new approach. It is found that the reliability index of the slope would decrease by 52.54% and the failure probability would increase from 0.000 705% to 1.966%. In the end, the impact of variation coefficients of c andfon reliability index of slopes was taken into discussion and the changing trend was observed.展开更多
Considering the uncertainty of material performance, geometric characteristic and analysis method, the analysis of statistical parameters of the resistance of cast ball-and-socket support joints and the reliability an...Considering the uncertainty of material performance, geometric characteristic and analysis method, the analysis of statistical parameters of the resistance of cast ball-and-socket support joints and the reliability analysis are carried out by JC method (improved first-order second-moment method) based on the relevant experimental data. Results show that the resistance partial factor of the joint increases with the increase of the reliability index. The resis- tance partial factors are suggested corresponding to the reliability index under different load combinations. Moreover, the suggested resistance partial factor is adopted in reliability design, and it is found that the reliability index of the joint is larger than the target reliability index. The optimal load combination is the one in which live load plays an im- portant control role. Finally, based on the suggested resistance partial factors, the reliability analysis of cast bail-and- socket support ioints of a proiect is conducted.展开更多
文摘电压失稳是一个动态的强非线性过程,需要采用动态方法来研究,而常规的动态电压稳定分析方法(如时域仿真法)的最大缺点是计算速度慢、耗费时间长,不能满足电压稳定在线研究的需要。本文利用PMU实测数据,在网损灵敏度理论的基础上,构造了一个二阶指标—综合网损灵敏度指标(Integrated Loss Sensitivity Index,ILSI),同目前电压稳定分析常用的一阶指标相比,具有线性度好,准确度高的优点,在电压失稳过程中有比较均匀的变化趋势,这样不仅可以让运行人员清楚地了解系统的稳定状况,而且还可以预测稳定极限。提出的算法物理意义明确、算法结构简单,在IEEE9节点系统的仿真结果表明,该指标在系统电压恶化的过程中显示良好的线性度,可以很好地表征目前系统的电压水平。
基金supported by the Ministry of Higher Education, Malaysia (Grant No.UKM-AP-PLW-04-2009/2)
文摘A numerical procedure for reliability analysis of earth slope based on advanced first-order second-moment method is presented,while soil properties and pore water pressure may be considered as random variables.The factor of safety and performance function is formulated utilizing a new approach of the Morgenstern and Price method.To evaluate the minimum reliability index defined by Hasofer and Lind and corresponding critical probabilistic slip surface,a hybrid algorithm combining chaotic particle swarm optimization and harmony search algorithm called CPSOHS is presented.The comparison of the results of the presented method,standard particle swarm optimization,and selected other methods employed in previous studies demonstrates the superior successful functioning of the new method by evaluating lower values of reliability index and factor of safety.Moreover,the presented procedure is applied for sensitivity analysis and the obtained results show the influence of soil strength parameters and probability distribution types of random variables on the reliability index of slopes.
基金Project(50878082) supported by the National Natural Science Foundation of ChinaProject(200631880237) supported by the Science and Technology Program of West Transportation of the Ministry of Transportation of ChinaKey Project(09JJ3104) supported by the Natural Science Foundation of Hunan Province, China
文摘In the reliability analysis of slope, the performance functions derived from the most available stability analysis procedures of slopes are usually implicit and cannot be solved by first-order second-moment approach. A new reliability analysis approach was presented based on three-dimensional Morgenstem-Price method to investigate three-dimensional effect of landslide in stability analyses. To obtain the reliability index, Support Vector Machine (SVM) was applied to approximate the performance function. The time-consuming of this approach is only 0.028% of that using Monte-Carlo method at the same computation accuracy. Also, the influence of time effect of shearing strength parameters of slope soils on the long-term reliability of three-dimensional slopes was investigated by this new approach. It is found that the reliability index of the slope would decrease by 52.54% and the failure probability would increase from 0.000 705% to 1.966%. In the end, the impact of variation coefficients of c andfon reliability index of slopes was taken into discussion and the changing trend was observed.
基金Supported by National Natural Science Foundation of China (No.51078259)Seed Foundation of Tianjin University (No.2010XG-0013)Program for New Century Excellent Talents in University (No.1102010)
文摘Considering the uncertainty of material performance, geometric characteristic and analysis method, the analysis of statistical parameters of the resistance of cast ball-and-socket support joints and the reliability analysis are carried out by JC method (improved first-order second-moment method) based on the relevant experimental data. Results show that the resistance partial factor of the joint increases with the increase of the reliability index. The resis- tance partial factors are suggested corresponding to the reliability index under different load combinations. Moreover, the suggested resistance partial factor is adopted in reliability design, and it is found that the reliability index of the joint is larger than the target reliability index. The optimal load combination is the one in which live load plays an im- portant control role. Finally, based on the suggested resistance partial factors, the reliability analysis of cast bail-and- socket support ioints of a proiect is conducted.