期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
水平定向钻在构建井/巷间输送通道中的应用研究 被引量:1
1
作者 高奎英 陈建华 +2 位作者 王蒙 马宝 李志斌 《煤炭技术》 CAS 北大核心 2023年第12期67-70,共4页
以大柳塔-活鸡兔井间通道构建工程为例,分析了水平定向钻在构建井/巷间大直径输送通道中的技术难点,针对性地提出了关键解决方案并进行了应用。应用结果表明:对接基坑和地面勘察孔能够降低长水平孔的轨迹控制难度、实现大直径套管的顺... 以大柳塔-活鸡兔井间通道构建工程为例,分析了水平定向钻在构建井/巷间大直径输送通道中的技术难点,针对性地提出了关键解决方案并进行了应用。应用结果表明:对接基坑和地面勘察孔能够降低长水平孔的轨迹控制难度、实现大直径套管的顺利下入,弥补现有设备及工艺的不足;采用在钻孔一端回托扩孔、另一端钻机协助排渣的方法能够解决大孔径扩孔排渣问题;在倒划眼通井规通井的基础上,利用钻机回拉配合顶管机顶进能够确保大直径套管的顺利下入。研究成果对井/巷间大直径通道构建具有借鉴意义。 展开更多
关键词 井/巷间 通道构建 大直径 水平定向钻
下载PDF
A method for computing unsupported roof distance in roadway advancement and its in-situ application 被引量:2
2
作者 Chen Yong Bai Jianbiao +2 位作者 Yan Shuai Hao Shengpeng Dao Viet Doan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期551-556,共6页
A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the ... A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the roof stress distribution and URD,obtained by the difference method,and roof stability according to the in-situ roof stress and rock mass strength was developed.We subsequently designed a proper range of URD,developed a testing method of URD with the function of mining protection,evaluated roof stability through analyzing the test data and then determined a reasonable URD.Considering the factors of the geological conditions,the immediate roof stability and the efficiency of the labor arrangement system,the URD of the advancing roadway of 9802 working face in Zhangshuanglou coal mine was determined to be 6 m using the proposed method.The results show that,when a 2 m length of roadway was reinforced by temporary support and high pre-stressed bolt support after the roadway advancement of 6 m per cycle,the speed and the security of the roadway development can be achieved and the advance rate can reach more than 400 m per month. 展开更多
关键词 Unsupported roof distance (URD)Roadway advancement Difference method Roof stress Drivage per cycle Unsupported roof distance test
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部