期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
井下煤层开采引起的地表形变分析 被引量:1
1
作者 李世鹏 李媛 《江苏科技信息》 2019年第24期53-55,共3页
煤炭是我国重要的能源之一,在我国经济发展中起着重要作用,井下煤层被开采以后,会破坏其周围岩层原有的力学平衡,导致地表发生沉降,有可能使矿山及地表发生危险。文章以矿区地表单点下沉动态规律为例,分析了井下煤层开采引起的地表形变... 煤炭是我国重要的能源之一,在我国经济发展中起着重要作用,井下煤层被开采以后,会破坏其周围岩层原有的力学平衡,导致地表发生沉降,有可能使矿山及地表发生危险。文章以矿区地表单点下沉动态规律为例,分析了井下煤层开采引起的地表形变规律,建立了动态数学预测模型,研究出Knothe时间函数模型并不能直接适于煤矿地表沉降数值建模,然后对该数学模型进行了改进,使其能够较好地模拟出煤矿地表沉降。 展开更多
关键词 井下煤层开采 Knothe时间函数模型 变形预测
下载PDF
Measurement of shear movements in the overburden strata ahead of longwall mining 被引量:4
2
作者 Mills K.W. GarrattO. +3 位作者 Blacka B.G. Daigle L.C. Rippon A.C. Walker R.J. 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第1期97-102,共6页
An underground coal mine located in New South Wales has a target coal seam located 160-180 m deep directly below a 16-20 m thick conglomerate unit that has been associated with significant periodic weighting events on... An underground coal mine located in New South Wales has a target coal seam located 160-180 m deep directly below a 16-20 m thick conglomerate unit that has been associated with significant periodic weighting events on the Iongwall face. As part of the investigations to better understand the causes of periodic weighting at the mine. inclinometers capable of measuring horizontal shear movements through the full section of the overburden strata were installed ahead of mining at two locations approximately 1 km apart above the centre of two iongwall panels. These inclinometers were monitored as the longwall approached each site. This paper presents the details of the installation, the results of the inclinometer monitoring at both sites, and the insights that these measurements provide for overburden behaviour about longwall panels. Horizontal shear movements were observed to develop on shear horizons that correlate closely across the two sites suggesting a mechanism that is consistent across a large area of the mine. Shear movements were observed to develop on a single horizon near the top of the conglomerate strata that was mobilised almost immediately after initial formation of the longwall goal at a distance of 425 m ahead of the longwall face. 展开更多
关键词 Horizontal shearLongwallOverburdenInclinometer monitoring
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部