期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
井桩基础细砂层塌孔的技术处理 被引量:1
1
作者 朱祥 《甘肃高师学报》 2008年第5期51-52,共2页
兰州城市学院培黎校区新建图书馆工程,在井桩基础施工中,为解决桩孔细沙层坍塌问题,采用混凝土护壁施工技术取得了成功.
关键词 井桩基础 塌孔 卵石层 扩大头 细粉砂层
下载PDF
Comparison of seismic capacity/demand ratios of two kinds of foundation schemes of Taizhou Bridge
2
作者 Zhao Yi Peng Tianbo Han Lei 《Engineering Sciences》 EI 2012年第3期26-32,共7页
Pile group foundation and caisson foundation are two common foundation schemes of long-span bridges, and the seismic performances of the two kinds of foundations are different. Taking Taizhou Bridge as an example, whi... Pile group foundation and caisson foundation are two common foundation schemes of long-span bridges, and the seismic performances of the two kinds of foundations are different. Taking Taizhou Bridge as an example, which is the first kilometer level three-pylon two-span suspension bridge in the world, two foundation schemes are designed for the middle pylon, and two whole bridge models with two different foundation schemes of the middle pylon are established respectively in this paper. The effects of foundation-soil interaction are simulated by equivalent linear soil springs whose stiffnesses are calculated according to m method. Seismic capacity/demand ratios of the two models are calculated. The following conclusions can be drawn: the weak positions of the two schemes are not the same; if caisson foundation is adopted for the middle pylon, the weak position is the bearing capacity of the middle pylon foundation, while if pile group foundation is adopted for the middle pylon, the weak position is the bearing capacity of the side pylon foundation. 展开更多
关键词 Taizhou Bridge FOUNDATION capacity/demand ratio
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部