Web文档聚类可以有效地压缩搜索空间,加快检索速度,提高查询精度.提出了一种Web文档的聚类算法.该算法首先采用向量空间模型VSM(vector space model)表示主题,根据主题表示文档;再以文档为事务,以主题为事务项,将文档和主题间的关系看...Web文档聚类可以有效地压缩搜索空间,加快检索速度,提高查询精度.提出了一种Web文档的聚类算法.该算法首先采用向量空间模型VSM(vector space model)表示主题,根据主题表示文档;再以文档为事务,以主题为事务项,将文档和主题间的关系看作事务的形式,采用关联规则挖掘算法发现主题频集,相应的文档集即为初步文档类;然后依据类间距离和类内连接强度阈值合并、拆分类,最终实现文档聚类.实验结果表明,该算法是有效的,能处理文档类间固有的重叠情况,具有一定的实用价值.展开更多
A novel rule-based model for multi-stage multi-product scheduling problem(MMSP)in batch plants with parallel units is proposed.The scheduling problem is decomposed into two sub-problems of order assignment and order s...A novel rule-based model for multi-stage multi-product scheduling problem(MMSP)in batch plants with parallel units is proposed.The scheduling problem is decomposed into two sub-problems of order assignment and order sequencing.Firstly,hierarchical scheduling strategy is presented for solving the former sub-problem,where the multi-stage multi-product batch process is divided into multiple sequentially connected single process stages,and then the production of orders are arranged in each single stage by using forward order assignment strategy and backward order assignment strategy respectively according to the feature of scheduling objective.Line-up competition algorithm(LCA)is presented to find out optimal order sequence and order assignment rule,which can minimize total flow time or maximize total weighted process time.Computational results show that the proposed approach can obtain better solutions than those of the literature for all scheduling problems with more than 10 orders.Moreover,with the problem size increasing,the solutions obtained by the proposed approach are improved remarkably.The proposed approach has the potential to solve large size MMSP.展开更多
文摘Web文档聚类可以有效地压缩搜索空间,加快检索速度,提高查询精度.提出了一种Web文档的聚类算法.该算法首先采用向量空间模型VSM(vector space model)表示主题,根据主题表示文档;再以文档为事务,以主题为事务项,将文档和主题间的关系看作事务的形式,采用关联规则挖掘算法发现主题频集,相应的文档集即为初步文档类;然后依据类间距离和类内连接强度阈值合并、拆分类,最终实现文档聚类.实验结果表明,该算法是有效的,能处理文档类间固有的重叠情况,具有一定的实用价值.
基金Supported by the National Natural Science Foundation of China(21376185)
文摘A novel rule-based model for multi-stage multi-product scheduling problem(MMSP)in batch plants with parallel units is proposed.The scheduling problem is decomposed into two sub-problems of order assignment and order sequencing.Firstly,hierarchical scheduling strategy is presented for solving the former sub-problem,where the multi-stage multi-product batch process is divided into multiple sequentially connected single process stages,and then the production of orders are arranged in each single stage by using forward order assignment strategy and backward order assignment strategy respectively according to the feature of scheduling objective.Line-up competition algorithm(LCA)is presented to find out optimal order sequence and order assignment rule,which can minimize total flow time or maximize total weighted process time.Computational results show that the proposed approach can obtain better solutions than those of the literature for all scheduling problems with more than 10 orders.Moreover,with the problem size increasing,the solutions obtained by the proposed approach are improved remarkably.The proposed approach has the potential to solve large size MMSP.