No.1 generator set of Banshan gas-fired power generation project, which is the first 9 FA heavy-duty gas turbine generator set in China that has drawn much attention, was successfully put into operation and merged int...No.1 generator set of Banshan gas-fired power generation project, which is the first 9 FA heavy-duty gas turbine generator set in China that has drawn much attention, was successfully put into operation and merged into power grid at 21:30 in June 2, three months ahead of schedule.展开更多
文摘No.1 generator set of Banshan gas-fired power generation project, which is the first 9 FA heavy-duty gas turbine generator set in China that has drawn much attention, was successfully put into operation and merged into power grid at 21:30 in June 2, three months ahead of schedule.