A VM (value management) approach was developed that better suits the culture and the context of the SPS (Saudi Public Sector). This approach provided a comprehensive assessment of VM at institutional, organization...A VM (value management) approach was developed that better suits the culture and the context of the SPS (Saudi Public Sector). This approach provided a comprehensive assessment of VM at institutional, organizational and project levels. This paper illustrates the procedures that were used to validate the developed VM approach. For the institutional and organizational levels, the VM approach was validated by conducting telephone interviews with three experts from three organizations that use VM and with two senior managers from the MOF (Ministry of Finance). Mainly, it was found that the MOF should be supported by experts to set up a centre of excellence that can set VM policy, guidelines and standards for the promotion of VM in the SPS, in order to ensure achieving value for money spent in SPS projects. The developed VM approach, as it would be applied at the project level, was presented to 11 experts, all of whom completed a validation questionnaire and presented their comments. Subsequently, the questionnaires were analyzed and the VM approach was amended to reflect the inputs provided by these experts. It was concluded that VM should be applied at least twice on SPS projects. Firstly, it is to review and structure strategic and project briefs to sort out soft issues, and secondly, it is to optimize project designs and sort out hard issues.展开更多
According to the actual requirement of project management on BIM application, the paper presents a new the overall implementation scheme and system architecture based on BIM project management. This paper established ...According to the actual requirement of project management on BIM application, the paper presents a new the overall implementation scheme and system architecture based on BIM project management. This paper established the engineering project management process that suitable for the situation of our country, design the organizational structure and verified the rationality through the example simulation based on the study of ideological characteristics of BIM combined with the modem project management theory and method. The research results has a certain theory reference value in our implementation and project management to improve the level of BIM information integration.展开更多
Rapids and shoals in the channel have a huge impact on the safety of the ship navigation, Based on the principle of a rubber dam can always adjust the height of the dam and raise upstream water level, This thesis crea...Rapids and shoals in the channel have a huge impact on the safety of the ship navigation, Based on the principle of a rubber dam can always adjust the height of the dam and raise upstream water level, This thesis creatively proposed the principle which applied to rapids and shoals in the Channel. In order to achieve the purpose of assisting ship through the channel safely. In this paper, through theoretical calculations verified the rubber dam has characteristics of raising water level, increasing the depth of the shoals, reducing the flow velocity, reducing water surface slope and improving the conditions of navigation. Therefore, this study has a wide range of practical value and application prospects in the project展开更多
文摘A VM (value management) approach was developed that better suits the culture and the context of the SPS (Saudi Public Sector). This approach provided a comprehensive assessment of VM at institutional, organizational and project levels. This paper illustrates the procedures that were used to validate the developed VM approach. For the institutional and organizational levels, the VM approach was validated by conducting telephone interviews with three experts from three organizations that use VM and with two senior managers from the MOF (Ministry of Finance). Mainly, it was found that the MOF should be supported by experts to set up a centre of excellence that can set VM policy, guidelines and standards for the promotion of VM in the SPS, in order to ensure achieving value for money spent in SPS projects. The developed VM approach, as it would be applied at the project level, was presented to 11 experts, all of whom completed a validation questionnaire and presented their comments. Subsequently, the questionnaires were analyzed and the VM approach was amended to reflect the inputs provided by these experts. It was concluded that VM should be applied at least twice on SPS projects. Firstly, it is to review and structure strategic and project briefs to sort out soft issues, and secondly, it is to optimize project designs and sort out hard issues.
文摘According to the actual requirement of project management on BIM application, the paper presents a new the overall implementation scheme and system architecture based on BIM project management. This paper established the engineering project management process that suitable for the situation of our country, design the organizational structure and verified the rationality through the example simulation based on the study of ideological characteristics of BIM combined with the modem project management theory and method. The research results has a certain theory reference value in our implementation and project management to improve the level of BIM information integration.
文摘Rapids and shoals in the channel have a huge impact on the safety of the ship navigation, Based on the principle of a rubber dam can always adjust the height of the dam and raise upstream water level, This thesis creatively proposed the principle which applied to rapids and shoals in the Channel. In order to achieve the purpose of assisting ship through the channel safely. In this paper, through theoretical calculations verified the rubber dam has characteristics of raising water level, increasing the depth of the shoals, reducing the flow velocity, reducing water surface slope and improving the conditions of navigation. Therefore, this study has a wide range of practical value and application prospects in the project